If a stormwater management plan may be required by this chapter for a parcel or lot of land, a grading or building permit shall not be issued for such parcel or lot of land unless a stormwater management plan has been approved or waived according to the specifications of this chapter 281 of the Code. A building permit may not be issued without:
A.
Recorded easements for the placement of all stormwater management practices, and easements to provide adequate access to and from such stormwater management practices for inspection and maintenance of such stormwater management practices from a public right-of-way;
B.
A recorded maintenance agreement, in accord with § 281-25, relating to all such stormwater management practices;
C.
A performance bond for the construction of all such stormwater management practices in accordance with the approved stormwater management plan;
D.
Written and recorded permission from adjacent property owners as necessary; and
E.
In the case of building permits for residential or commercial lots, a site plan for each lot showing all proposed construction and delineating all areas to be occupied by nonstructural stormwater management practices for which curve number (CN) credits have been taken in the approved stormwater management plan. This site plan shall become the basis for inspections conducted in accord with §§ 281-23A(7) and 281-24C(4)(i).