Regular inspections shall be made and documented for each ESD planning
technique and practice at the stages of construction specified in
the Stormwater Design Manual by the enforcement authority, its authorized
representative, or certified by a professional engineer licensed in
the State of Maryland. At a minimum, all ESD and other nonstructural
practices shall be inspected upon completion of final grading, the
establishment of permanent stabilization, and before issuance of use
and occupancy approval.