A.
When required.
[Amended 4-24-2007 by Ord. No. 07-04]
(2)
Site plan approval is not required for the following development:
(a)
Farm buildings on a farm;
(b)
Existing not-for-profit youth camps;
(c)
Conversion of an existing residential building to a commercial use, that does not involve the construction of additional floor area or outside storage; or modification of a single-family dwelling to a conversion dwelling; except that a concept plan shall be submitted which demonstrates adequate parking, landscaping, resource protection and stormwater management, as well as proper access to the property and compliance with the district regulations set forth in Chapter 18:1, Part 3, Article V, of this Chapter 18;
(d)
Additions to existing nonresidential buildings that existed on April 9, 1987, if the addition and all previous additions to the building since April 9, 1987, cover 10% or less of the allowed floor area of the site in which the building is located;
(e)
Improvements not related to buildings that do not increase impervious surface area by more than 10% as it existed on April 9, 1987;
(f)
Additions to existing nonresidential buildings constructed after April 9, 1987, if the addition and all previous additions to the building since April 9, 1987:
[2]
Do not result in a change to parking design, traffic circulation or the location of driving aisles and medians on the site or to a degree which the Planning Director considers inconsistent with County parking and loading standards; and
[3]
Do not significantly change building materials, architecture or building layout or increase building height in a manner or to a degree that the Planning Director considers inconsistent with County standards or with previous Planning Commission approvals; and
[4]
Do not require any other modifications that the Planning Director considers significant enough to warrant submission of a site plan, amendment of an approved site plan, and/or full Planning Commission review.
(g)
Improvements not related to buildings that do not increase by more than 10% impervious surface area created after April 9, 1987, and
[1]
Do not result in a change to parking areas, traffic circulation and the location of driving aisles and medians on the site or to a degree which the Planning Director considers inconsistent with County parking and loading standards; and
[2]
Do not require additional stormwater management; and
[3]
Do not require any other modifications that the Planning Director considers significant enough to warrant submission of a site plan, amendment of an approved site plan, and/or full Planning Commission review.
(3)
Site plan approval is required for all utility-scale solar arrays.
[Added 1-23-2018 by Ord. No. 17-17]