A.
After the preliminary conference with the Commission's staff, the applicant shall prepare a preliminary plan of the proposed subdivision conforming to the requirements for the preparation of such plat as set forth in Appendix A.[1] Deadlines for submission of applications shall be established annually by the Department of Planning Services and shall be at least 60 days prior to the meeting of the Commission. Upon making application, the following items shall be filed with the staff:
[Added 1-16-2007 by Ord. No. 07-02]
(1)
Forty-five black- or blue-line prints of the preliminary plan;
(2)
One reproducible Mylar or one electronic copy on compact disc;
(3)
A completed application form;
(4)
Checklist;
(5)
Filing fee; and
(6)
Other supporting information that the Director or designee and/or applicant deem pertinent to the application.
[1]
Appendix A is included at the end of this chapter.
B.
If a proposed subdivision plan indicates that central sewer will be utilized, a letter from the Department of Public Works verifying that central sewer is legally and technically available must be provided upon the preliminary plan application.
C.
If a proposed subdivision plan indicates that on-site septic will be utilized, a copy of the DNREC-approved soils feasibility study must be submitted with the plan.
D.
The preliminary plan shall be reviewed by the Commission's staff to determine its conformity with DelDOT's Functional Classification Map, other pertinent features of the Comprehensive Plan of the County, applicable zoning and other regulations and the design principles, standards, and requirements for plan submission as set forth in this chapter. The staff shall also refer the preliminary plan to the State Office of Planning Coordination and the Regional Planning Commission's Development Advisory Committee (DAC) for comment and recommendation.