Type of Application
|
Amount of Fee
| |
---|---|---|
Building Department review of plans/inspection fees:
| ||
Plan review
|
$75 per hour
| |
Inspections performed
|
$75 flat fee per inspection
| |
Nonrefundable application fee
|
$100 for all required permits except as denoted "flat fee"
| |
Agricultural building permit/nonresident buildings defined as
"farm use" under New York Agriculture and Markets Law (new construction
and additions)
|
$50 or $0.10 per square foot of enclosed constructed space,
whichever is greater, flat fee
| |
Residential (one- and two-family) building permit (new construction
and additions)
|
$0.75 per square foot of enclosed and $0.50 per square foot
of either open or partially enclosed constructed space*
| |
Other (including multifamily, institutional and commercial)
building permit (new construction and additions)
|
$1.00 per square foot of enclosed and $0.75 per square feet
of either open or partially enclosed constructed space*
| |
Residential (one- and two-family) building permit (major alterations
or renovation)
|
$0.50 per square foot of enclosed and $0.25 per square foot
of either open or partially enclosed constructed space*
| |
Other (including multifamily, institutional and commercial)
building permit (major alterations or renovation)
|
$0.75 per square foot of enclosed and $0.35 per square foot
of either open or partially enclosed constructed space*
| |
Agricultural building permit/nonresident buildings defined as
"farm use" under New York Agriculture and Markets Law (alterations
or renovation)
|
$50 or 40% of above fee for nonagricultural building, whichever
is greater, flat fee
| |
Customary accessory structure permit:
| ||
Garden or storage shed less than 100 square feet in floor area
|
A building permit is not required; all setback and other bulk regulations set forth within Town Code Chapter 210, Zoning, must however be met
| |
Garden or storage shed in excess of 100 square feet in floor
area and any other nonhabitable accessory building and/or structure
|
$0.50 per square foot
| |
Aboveground swimming pool
|
$50
| |
Hot tub
|
$50
| |
In-ground swimming pool
|
$250
| |
Tennis court
|
$200 per court
| |
Sign permit per Chapter 210, Zoning:
| ||
Residential, including home occupations, per § 210-26D(1) and (3)
|
$50 per sign
| |
$50 per sign
| ||
Directional, per § 210-26E
|
$50 per sign
| |
$0.10 per lineal foot
| ||
Electrical permit (residential and commercial upgrades)
|
$100 flat fee
| |
Plumbing permit (residential and commercial upgrades)
|
Fee based upon number of inspections performed
| |
Permit for replacement of furnace/boiler
|
$50
| |
Fireplace/stove/chimney permit
|
$50
| |
Sprinkler system permit
|
Fee based upon number of inspections performed
| |
Demolition permit:
|
$0.10 per square foot of floor area of demolition structure
| |
Blasting permit (earthmoving/demolition)
|
$150 (greater of 5 blasts or 5 days); $500 (greater than 5 blasts
or 5 days, not to exceed 90 days)
| |
Blasting permit (mining/quarrying)
|
$1,000 annual fee
| |
Operational permit
|
$100 annual flat fee
| |
Commercial hazardous material storage permit
|
$100 annual flat fee
| |
Public assembly permit
|
$100 flat fee
| |
1203 annual inspections (multifamily residential, institutional,
commercial and light industrial)
|
$100 flat fee, maximum of 2,500 square feet; $250 flat fee,
2,501 to 10,000 square feet; $500 flat fee, more than 10,000 square
feet
| |
Certificate of occupancy
|
$100 flat fee
| |
Certificate of change of use
|
$100 flat fee
| |
Certificate of compliance
|
$100 flat fee
| |
Abstract certificate letter of record (An on-site inspection
of both the exterior and interior of a residential or commercial property
will be required prior to the issuance of an abstract certificate
of record.)
| ||
Residential
|
$250
| |
Commercial
|
$250 per occupancy flat fee
| |
Renewal of expired building permit within 30 calendar days of
expiration
|
50% of fee as computed in accordance with this chapter
| |
Legalization and compliance fee for structure or use for which
no building permit or certificate of occupancy was obtained
|
The legalization fee is determined by three times the building
permit fee plus cost of building permit for structure use as computed
in accordance with this chapter
| |
Reinspection fee for prior noncompliance (third and subsequent
visits)
|
$75 per inspection for permit inspections requiring third or
additional compliance inspections for Building Code issues; any and
all inspections for violations to all Town of Union Vale adopted Code
provisions and follow-up inspections for compliance to verified violations
|
*NOTE: "Constructed space" includes both enclosed building space,
not including unoccupied basement or cellar, and unenclosed, or partially
enclosed, areas such as porches, decks, carports, loading docks and
similar spaces.
|