[Amended 5-1-1989]
A.
Schedule of fees for building permits. The schedule of fees required for basic building permits issued in accordance with the terms of the Building Code shall be as set forth in Schedule A attached hereto and incorporated herein by reference.[1] Said fees shall be based on the valuation of the work, and said valuation shall be established in accordance with the provisions of Schedule B attached hereto and incorporated herein by reference.[2]
[1]
Editor's Note: Schedule A is included as an attachment to this chapter.
[2]
Editor's Note: Schedule B is included as an attachment to this chapter.
B.
Additional building permit fee.
(1)
In the event that the structure exceeds the threshold limit, as defined in Section 4 of Public Act No. 88-359, an additional building permit fee shall be paid, which fee is equal to the cost incurred by the Town of Brookfield in hiring an independent engineering consultant to review the plans and specifications of the structure prior to its construction to determine its compliance with the requirements of the Connecticut Basic Building Code and to conduct such field inspections as said consultant deems necessary. In addition to the foregoing, if the structure exceeds the threshold limit described above, an additional building permit fee shall be required in an amount equal to the cost of any independent laboratory tests which may be required by the Brookfield Building Official or the independent engineering consultant for the purpose of testing structural components to ensure that such components conform to approved design specifications and drawings.
(2)
In those instances where, in the opinion of the Brookfield Building Official, a proposed structure may meet or exceed the threshold limit described in Section 4 of Public Act No. 88-359, the property owner, or his agent, at the time of the application for the building permit, shall provide the Building Official with an estimate prepared by the architect or professional engineer who designed the structure setting forth a good-faith estimate of the cost of providing the independent engineering consultant services and the independent laboratory testing services required by the provisions of said Public Act. The additional building permit fee required by Subsection B(1) above shall be based upon said estimate and shall be paid before the building permit is issued. In the event that the actual cost to the Town of Brookfield incurred in providing said services is greater than said estimate, then the difference shall be paid to the Town of Brookfield by the property owner prior to the issuance of a certificate of occupancy for the structure. In the event that said actual cost is less than said estimated cost, the difference shall be refunded to the property owner or his agent by the Town of Brookfield within 60 days after the date of the issuance of the certificate of occupancy for the structure.
C.
Partial refunds of building permit fees.
(1)
In the event that no construction or other work has been commenced pursuant to a building permit issued in accordance with the provisions of this section and the Basic Building Code of the State of Connecticut, the property owner or his agent may surrender the building permit to the Building Official and request a partial refund of the basic building permit fee. Upon the surrender of the building permit and certification by the Building Official that no work has been performed thereunder, the Town of Brookfield shall issue a partial refund of the basic building permit fee, which partial refund shall be computed as follows:
(a)
The fee paid for the first $7,000 in value of work shall not be refunded.
(b)
Sixty-six and two-thirds percent of the fee paid for that portion of the work which exceeds $7,000 in value shall be refunded to the property owner or his agent by the Town of Brookfield. Said refund shall be made within 60 days after the date of request for a refund and the certification by the Building Official that no work has been commenced pursuant to the building permit.
(2)
Any additional building permit fee paid in accordance with the provisions of Subsection B above shall be refunded at the same time that the basic building permit fee is refunded. The amount of the refund for the additional building permit fee shall be the amount paid less all sums which the Town of Brookfield has paid or is obligated to pay for an independent engineering consultant or independent laboratory testing with reference to the proposed structure.
D.
Waiver of fees.
(1)
No building permit fees shall be payable with respect to any building constructed by the Town of Brookfield for school purposes or any other municipal purpose.
(2)
The Board of Selectmen of the Town of Brookfield is hereby empowered, in its discretion, to waive the building permit fees imposed by this section with respect to buildings and other structures to be constructed by a nonprofit, tax-exempt organization when said buildings or other structures are intended to benefit the public and are within the scope of the public purposes for which the organization was created.