The intent of this chapter to regulate and prevent
indiscriminate clearcutting of trees by land developers, ensure proper
forest management by commercial and private woodcutters, prevent soil
degradation, stream encroachment and other adverse effects upon the
environment during timber harvesting and promote proper revegetation
of any site; also, to prevent illegal woodcutting and timber piracy
within the Township.
A permit shall be obtained pursuant to the provisions
of this chapter authorizing the cutting of trees for manufacture or
sale as plywood, saw logs or other commercial wood products or any
purpose other than personal consumption and use by an owner of parcels
of 10 acres or less. A permit shall be obtained by the owner of the
premises or his authorized agent so designated by notarized affidavit.
As used in this chapter, the following terms
shall have the meanings indicated:
FORESTRY
Growing and harvesting of trees for commercial purposes.
TREE
A wood plant that has the potential to reach a height of
at least 10 feet, has a single stem and has a definite crown shape.
All permits issued pursuant to this chapter
shall be valid for a period of one year from the date of approval
by the Township Committee. Any alteration or deviation from the cutting
plan authorized in the permit shall require a new application and
approval prior to undertaking the same. In the event that the permittee
shall alter or deviate from the approved cutting plan, the permit
shall forthwith be rendered null and void. Permits issued pursuant
to this chapter are nontransferable.
Forestry within the Township shall be authorized,
provided that the following standards are met:
A. Access to land proposed for harvesting:
(2) Follows previously established roads and trails to
the maximum extent practical.
(3) Avoids wetland areas except as is absolutely necessary
to harvest wetland species or to gain access to the harvesting site.
(4) Avoids crossing streams with high and unstable banks
and those with approaching slopes exceeding 10% where alternative
crossing exists.
B. All activities during and after harvesting are carried
out in a manner to avoid damage to stream banks and bottoms, erosion
and degradation of water quality, including the following:
(1) Stream banks at crossings shall be stabilized during
and after harvesting.
(2) Culverts and bridges shall be temporary in nature.
(3) Trees which serve to stabilize stream banks shall
be retained; other trees shall be felled to avoid stream banks where
practical and winched off such banks where felling occurs.
(4) A twenty-five-foot vegetated buffer along streams,
ponds, lakes and marshes shall be maintained.
(5) The use of active and intermittent stream channels
for skidding of logs shall be prohibited.
(6) Skidding shall not occur within 25 feet of streams,
ponds, lakes and marshes except for necessary crossings.
(7) Accessways for forestry activities shall be located
at least 100 feet from streams, ponds, lakes and marshes where practical.
(8) Landings shall be located in well-drained areas where
practical, at least 200 feet from public roads where practical and
at least 200 feet from ponds, lakes and marshes.
(9) Filter strips shall be located between harvested areas,
landings and skid trails and streams, ponds, lakes and marshes.
(10) Water diversion devices shall be installed as necessary
to control erosion.
C. At the conclusion of any harvesting operation:
(1) All areas disturbed for access, processing, moving
or loading trees shall be regraded to approximate natural slopes and
water diversion devices are installed as necessary in order to avoid
erosion.
(2) All accessways shall be closed and devices installed,
such as poles, pilings or berms, that will preclude use of the accessway.
(3) Bare ground areas shall be stabilized as approved
by the Egg Harbor Township Environmental Commission, with vegetation
where necessary consistent with standards to prevent erosion.
(4) All debris shall be removed from streams.
(5) All nonvegetative refuse shall be collected.
(6) All hanging trees shall be removed.
D. Within the Pinelands Area, the forestry standards and procedures
in the Pinelands Comprehensive Management Plan (N.J.A.C. 7:50-6.41
to 7:50-6.48) shall apply.
[Added 4-11-2012 by Ord. No. 9-2012]
This chapter shall be enforced by the Township
Committee or such Township officials as are designated by resolution.
Nothing contained herein shall be deemed to restrict or impede enforcement
of any power or authority granted to the New Jersey State Department
of Environmental Protection, Division of Parks and Forestry, Bureau
of Forestry, for enforcement of N.J.S.A. 13:9-1 et seq., state forest
fire laws and regulations or any other statute or regulation.