It is the purpose of this chapter to preserve
and promote the character and appearance, and conserve the property
values of the Village by providing procedures for an architectural
review of buildings and structures henceforth erected, reconstructed
or altered in the Village, and thereby to encourage good qualities
of exterior building design and good appearances and to relate such
design and appearances to existing buildings and structures on the
site and to surrounding buildings and structures, and to prevent such
design and appearances as are inappropriate by reason of poor quality
of exterior design, monotonous similarity or visual discord in relation
to existing buildings or structures on the site or on surrounding
sites.
The Mayor will designate an architect, licensed
in the state of New York, subject to the approval of the Board of
Trustees, to serve as a consultant to the ARB. The term of the architectural
consultant shall be for 1 official year. An architect so retained
shall be without vote in regard to any application.
If, within 28 days after the date on which an application has been referred to the ARB, or after a revised application has been submitted in accordance with §
4-6E, or such longer period as may be consented to by the applicant, the ARB has not acted on the application, the application shall be deemed approved.
The Building Inspector shall not issue any permit
unless the application has been approved by the ARB. In the event
that the ARB approves an application on conditions, the Building Inspector
shall not issue any permit until all changes in the plans have been
made to conform to such conditions and unless all such conditions
have been met or complied with. Unless otherwise extended by the ARB,
the approval expires 90 days from the date that the decision is filed
in the Village Clerk's Office, and, thereafter, the Building Inspector
shall not issue a building permit. A request by the applicant for
an extension of time to obtain the permit shall be made within the
initial ninety-day period in which to obtain the permit.
[Added 4-2-2001 by L.L. No. 2-2001]
The applicant shall be responsible for the payment
of all fees set forth in the Schedule of Fees and Payments maintained
by the Village Clerk.