[HISTORY: Adopted by the Town Board of the Town of Wallkill 12-28-1989
by L.L. No. 4-1989. Amendments noted where applicable.]
It is the intent of the Town of Wallkill that all site plan and subdivision
projects utilize the Town of Wallkill's permanent survey monuments. In furtherance
of this objective, the Town of Wallkill has had permanent survey monuments
installed at various locations throughout the town incorporating latitude,
longitude and elevations based upon the North American Datum (NAD) and the
corresponding New York State Plane Coordinate (NYSPC) System. This survey
monumentation provides a proper and sound data base for the planning of future
development in the town and for the engineering, construction and as-built
drawings of site improvements, sanitary sewer lines, waterlines, storm drainage
systems, road improvements and related.
All site development plans within the Town of Wallkill shall utilize the permanent town survey monuments for the site plan maps prepared in accordance with § 249-40E of the Town Code. Any reference in the Town Code to United States Geological Survey Datum shall now mean the North American Datum (NAD) and the New York State Plane Coordinate (NYSPC) System as established by the permanent town survey monuments. A developer must comply with the requirement of utilizing the town survey monuments in the development of site plan and subdivision maps, topography and proposed elevations of road, water, sewer, drainage and related improvements. All as-built drawings of on-site and off-site improvements must be based upon the town survey monuments.
A.
The Planning Board shall require, as a condition to approval
of any site plan or subdivision plat, a payment to the town of a survey monument
fee, which fee shall be available for use by the town for the expense associated
with the survey monument program and comprehensive as-built plans of site
improvements throughout the town.
B.
Determination of fee. For all site plans and subdivisions,
the survey monument fee shall be determined per unit or lot. A unit or lot
shall be computed as follows:
[Amended 3-23-2006 by L.L. No. 3-2006]
(1)
Subdivision: one unit equals one approved subdivided
lot.
(2)
Multiple-family development: one unit equals each individual
condominium, townhouse, apartment or dwelling unit approved.
(3)
Industrial, commercial, office or other such use: one
unit shall equal 2,000 square feet of building area approved.
C.
Payment of fee. The total amount of survey monument fees
required to be paid by the developer shall be delivered to the town at the
time of final approval and prior to the signing of the site plan or subdivision
plans by the Chairman of the Planning Board.
D.
All fees required to be paid pursuant to this chapter shall be
set by resolution of the Town Board.
[Added 3-23-2006 by L.L. No. 3-2006]
A.
This chapter shall be effective January 1, 1990.
B.
All site plans and subdivisions receiving final approval
after January 1, 1990, will be required to pay the survey monument fees set
forth in this chapter. All site plans and subdivisions which received final
approval before January 1, 1990, but have not submitted as-built drawings
to the town, will not be required to pay a survey monument fee, but will be
required to submit as-built drawings based on the town survey monuments.