It is the purpose of this article to protect public health, safety and welfare in the Town of Hamburg by regulating site preparation and construction activities, including excavation, filling, grading and stripping, so as to prevent problems related to erosion, sediment or drainage. In relation to this purpose, the local law is intended to:
A.
Preserve the quality of the natural environment from such adverse effects of site preparation and construction as:
(1)
Pollution of lakes, ponds and watercourses from silt or other materials.
(2)
Unnecessary disturbance or destruction of trees and other vegetation, as well as wildlife and their habitats.
(3)
Excessive exposure of soil to erosion.
(4)
Unnecessary modification of natural topography or unique geological features.
(5)
Failure to restore sites to an attractive natural condition.
B.
Protect people and properties from such adverse effects of site preparation and construction such as:
C.
Protect the town and other governmental bodies from having to undertake, at public expense, programs of repairing roads and other public facilities, of providing flood protection facilities and of compensating private property owners for the destruction of properties arising from the adverse effects of site preparation and construction.
D.
Ensure that site preparation and construction are consistent with the codes, rules and regulations of the Town of Hamburg.