Subdivision plats, including related streets, drainage, parks and other improvements and the provision for water supply, sewage disposal and easements, shall be planned, designed and constructed in accordance with the standards hereinafter specified, including the following:
A.
Plans. Construction plans shall be prepared in accordance with good professional design practice. Such plans shall be approved, in writing, by the Planning Board and, at the discretion of the Board, may be required to be approved, in writing, by the North Salem Superintendent of Highways or his engineer or representative designated by the Town Board, or the Town Consulting Engineer.
[Amended 3-12-1996; 12-30-1996 by L.L. No. 10-1996]
B.
Construction. The construction of improvements shall be carried out in a workmanlike manner, in accordance with the time limits approved by the Planning Board and in accordance with the accepted construction program. All construction shall be subject to inspection and notification as follows:
(1)
The Planning Board, the Town Superintendent of Highways or his engineer or representative designated by the Town Board, or the Town Consulting Engineer shall have free access to the construction work at all times and shall be deemed authorized to take material samples, cores and other tests as deemed necessary to determine compliance with the standards of the regulations.
[Amended 3-12-1996; 12-30-1996 by L.L. No. 10-1996]
(2)
The Planning Board, Town Superintendent of Highways or the Town Consulting Engineer may require the applicant, at his expense, to have such tests made and certified by the land surveyor or professional engineer, or both, as required by law.
[Amended 3-12-1996; 12-30-1996 by L.L. No. 10-1996]
(3)
Other Town agencies and state and County agencies having regulatory jurisdiction over portions of the plat, shall also have free access to the construction work at all times.
(4)
The applicant or his contractor or agent shall give timely notice to the Town Superintendent of Highways and the Town Consulting Engineer at commencement and completion of each phase of the work in accordance with procedures as may hereafter be adopted by the Town Board or Planning Board.
[Amended 3-12-1996; 12-30-1996 by L.L. No. 10-1996]
(5)
The following items shall be subject to inspection, during construction, by the Town Superintendent of Highways or Town Consulting Engineer:
[Added 5-14-1991; amended 3-12-1996; 12-30-1996 by L.L. No. 10-1996]
(a)
Soil erosion control structures.
(b)
Clearing limit line for conformance to the plat.
(c)
Clearing of the roadway.
(d)
The location of topsoil stockpiles unless shown on construction plans.
(e)
Rough grading and soil erosion maintenance.
(f)
Drainage structures and pipes. Pipes shall not be backfilled prior to inspection.
(g)
Road subgrade for stability and as-built drawing, showing conformance to line and grade.
(h)
Road surfacing.
(i)
Shoulder stabilization and/or topsoil and seeding.
(j)
Monuments with as-built drawings and final inspections.
(k)
Curbs.
(l)
Other improvements approved or required by the Planning Board.
NOTE: | |
|---|---|
At each phase of inspection and construction, the soil erosion control structures must be in place and cleaned as needed. No work should proceed on next phase until satisfactory completion of previous items. | |