A.
For any proposed development, the owner/developer shall submit phased stormwater management plans to the City of Havre de Grace Department of Planning – Inspection Services for review and approval. At a minimum, plans shall be submitted for the concept, site development, and final stormwater management construction phases of project design. Each plan submittal shall include the minimum content specified in § 169-27 of this chapter and meet the requirements of the Design Manual and Article IV of this chapter.
B.
The Department shall perform a comprehensive review of the stormwater management plans for each phase of site design. Coordinated comments will be provided for each plan phase that reflects input from all appropriate agencies, including, but not limited, to the Soil Conservation District (SCD) and the Departments of Planning – Inspection Services, and Public Works. All comments from the Department and other appropriate agencies shall be addressed and approval received at each phase of project design before subsequent submissions.