[Amended 6-5-2013 by Ord. No. 2013-15[1]]
A.
Applications for lot line adjustments shall be made in writing to the Department of Planning, Building and Development, and shall consist of the following documentation:
(1)
Map. A survey map prepared by a licensed engineer or surveyor which indicates the existing lot lines as well as the proposed adjusted lot line on a scale no smaller than one inch equaling 100 feet.
(2)
Copies of the deeds to the properties in their current configuration, and a proposed deed for the parcel to be conveyed as a result of the lot line adjustment. A metes and bounds description of the properties in their present configuration and the proposed new configuration.
B.
The Director of Planning and Development or designee shall review the application to ensure that the lot line adjustment will not result in violation of any City codes.
C.
The Director of Planning and Development or designee shall have 30 days from the date he receives the application to approve or deny an application for a lot line adjustment. If the application is approved, the Director of Planning and Development or designee shall issue a certificate of lot line adjustment, which shall be filed in the Tompkins County Clerk concurrently with the deed effecting the lot line adjustment.
[1]
Editor's Note: This ordinance provided for an effective date of 1-1-2014.