Note: Some of the following subsections may not be needed. In
some instances, Zones A, AO, or AH may not appear on the FIRM, in
which case the relevant subsections should be omitted. Check the FIRM
carefully to see if any of these zones have been delineated.
The identified floodplain area shall consist of the following
specific areas:
A. The Floodway Area/District identified as floodway in the FIS which
represents the channel of a watercourse and the adjacent land areas
that must be reserved in order to discharge the base flood without
cumulatively increasing the water surface elevation by more than one
foot at any point. This term shall also include floodway areas which
have been identified in other available studies or sources of information
for those special flood hazard areas where no floodway has been identified
in the FIS.
(1) Within any floodway area, no encroachments, including fill, new construction,
substantial improvements, or other development, shall be permitted
unless it has been demonstrated through hydrologic and hydraulic analysis
performed in accordance with standard engineering practice that the
proposed encroachment would not result in any increase in flood levels
within the community during the occurrence of the base flood discharge.
(2) No new construction or development shall be allowed, unless a permit
is obtained from the Department of Environmental Protection Regional
Office and is consistent with the Borough's Act 167 Stormwater
Management Ordinance.
B. The AE Area/District without floodway shall be those areas identified
as an AE Zone on the FIRM included in the FIS prepared by FEMA and
for which base flood elevations have been provided in the FIS but
no floodway has been delineated.
(1) No permit shall be granted for any construction, development, use,
or activity within any AE Area/District without floodway unless it
is demonstrated that the cumulative effect of the proposed development
would not, together with all other existing and anticipated development,
increase the base flood elevation at any point.
(2) No new construction or development shall be located within the area
measured 50 feet landward from the top-of-bank of any watercourse
unless a permit is obtained from the Department of Environmental Protection
Regional Office and is consistent with the Borough's Act 167
Stormwater Management Ordinance.
C. The A Area/District shall be those areas identified as an A Zone
on the FIRM included in the FIS prepared by FEMA and for which no
one-percent-annual-chance flood elevations have been provided. For
these areas, elevation and floodway information from other federal,
state, or other acceptable sources shall be used when available. Where
other acceptable information is not available, the base flood elevation
shall be determined by using the elevation of a point on the boundary
of the identified floodplain area which is nearest the construction
site. In lieu of the above, the municipality may require the applicant
to determine the elevation with hydrologic and hydraulic engineering
techniques. Hydrologic and hydraulic analyses shall be undertaken
only by professional engineers or others of demonstrated qualifications,
who shall certify that the technical methods used correctly reflect
currently accepted technical concepts. Studies, analyses, computations,
etc., shall be submitted in sufficient detail to allow a thorough
technical review by the municipality.
D. The Shallow Flooding Area/District shall be those areas identified
as Zones AO and AH on the FIRM and in the FIS. These areas are subject
to inundation by one-percent-annual-chance shallow flooding where
average depths are between one foot and three feet. In Zones AO and
AH, drainage paths shall be established to guide floodwaters around
and away from structures on slopes.
Note: Risk Map nonregulatory products, including but not limited
to Coastal A Zones, non-encroaching zones, advisory flood heights,
soils and shaded Zone X where floodplain is less than one square mile
drainage area or less than 200 feet wide, will necessitate inclusion
of this language if communities want to regulate using this data.
The identified floodplain area may be revised or modified by
the Borough Council where studies or information provided by a qualified
agency or person documents the need for such revision. However, prior
to any such change to the special flood hazard area, approval must
be obtained from FEMA. Additionally, as soon as practicable, but not
later than six months after the date such information becomes available,
a community shall notify FEMA of the changes to the special flood
hazard area by submitting technical or scientific data.
Should a dispute concerning any identified floodplain boundary
arise, an initial determination shall be made by the Borough of Lansdowne
Planning Commission, and any party aggrieved by this decision or determination
may appeal to the Borough Council. The burden of proof shall be on
the appellant.
Prior to development occurring in areas where annexation or
other corporate boundary changes are proposed or have occurred, the
community shall review flood hazard data affecting the lands subject
to boundary changes. The community shall adopt and enforce floodplain
regulations in areas subject to annexation or corporate boundary changes
which meet or exceed those in 44 CFR 60.3.