B.
When a public sanitary sewerage system becomes available and a branch sewer is located within 400 feet of the existing or proposed habitable structure, the private sewage system shall be disconnected and connection made to the public sanitary sewerage system within six months, in accordance with § 281.45, Wis. Stats.
[Amended 12-15-1998 by Ord. No. 1526; 6-3-2003 by Ord. No. 2003-1752]
D.
A private sewage system shall not be installed, altered or replaced until a sanitary permit has been applied for and granted, pursuant to the requirements set forth in § 190-31. Emergency repairs or the removal of stoppages may be performed without a permit, provided that such work is reported to the Plumbing Inspector by the end of the next working day for a determination by him or her as to whether a permit is required. Saturdays, Sundays and holidays shall not be considered in the determination of the next working day.