Prior to the granting of final approval, the subdivider shall have installed all improvements or shall have furnished performance guaranties for the ultimate installation of all improvements, including:
A.
Streets.
B.
Street signs.
C.
Curb and/or gutters.
D.
Sidewalks.
E.
Streetlighting.
F.
Shade trees, to be located on the street line so as not to interfere with utilities or sidewalks.
G.
Topsoil protection. No topsoil shall be used as spoil or removed from the site. Topsoil moved during the course of construction shall be redistributed so as to provide at least six (6) inches of cover to all areas of the subdivision and shall be stabilized by seeding, sodding or planting on slopes of less than twelve percent (12%) as shown on the final grading plan and shall be stabilized by sodding on slopes of twelve percent (12%) or over as shown on the final grading plan.
H.
Monuments, to be of the size and shape required by N.J.S.A. 46:23-9.11, as amended, and shall be placed in accordance with said statute.
I.
Water mains, culverts, storm sewers and sanitary sewers. All such installations shall be properly connected with an approved system and shall be adequate to handle all present and probable future development.
J.
Grading.
K.
Pavement.
L.
Drainage structures, erosion controls and sedimentation control devices.
M.
Public improvements of open space.