A.
New sanitary sewers and all extensions to sanitary sewers owned and operated by the Town or to private systems shall be designed by a professional licensed to practice sewer design in the state, in accordance with the Recommended Standards for Sewage Works, as adopted by the Great Lakes — Upper Mississippi River Board of State Sanitary Engineers Ten State Standards, SCSD Rules and Regulations adopted January 21, 2003, (and as amended) and in strict conformance with all requirements of the NYSDEC.
B.
Plans and specifications shall be submitted to and written approval shall be obtained from the Town, the Saratoga County Sewer District (if within its service area), and the NYSDEC, before initiating any construction. The design shall anticipate and allow for flows from all possible future extensions or developments within the immediate drainage area. If, however, there is inadequate capacity in any sewer which would convey the wastewater or if there is insufficient capacity in the POTW treatment plant to treat the wastewater properly, the application shall be denied. Sewer line and POTW treatment plant current use shall be defined as the present use and the capacity which has been committed, by resolution, to other users by the Town Board and or SCSD No. 1.