A.
It is required that all residential, commercial and industrial properties containing sanitary facilities or generating acceptable liquid waste, to which the sewer system is reasonably accessible, be connected to the sewer system. The term "reasonably accessible" is defined as being 150 feet or less from the nearest line.
B.
Connection to the sewer line must be made within 60 days of notice to do so in the case of existing improved properties.
C.
In the case of new construction, connection to the sewer and final inspection of that connection must be completed before occupancy of the improved property.