The size, slope, alignment, materials of construction of a building sewer, the methods to be used in excavation, placement of pipe, jointing, testing and backfilling the trench, and the connection of the building sewer to the public sewer shall conform to all of the requirements of the Uniform Construction Code, the plumbing subcode of the State of New Jersey, this chapter and any and all other applicable rules and regulations of the Borough. In the event of any inconsistency in provisions of this section and the plumbing subcode, the plumbing subcode shall control.[1]
[1]
Editor's Note: See Ch. 78, Construction Codes, Uniform.