home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Township of Foster, PA
chevron_right
2022-10-25
info
chevron_right
Part II: General Legislation
chevron_right
Chapter 192 Stormwater Management
Part I: Administrative Legislation
Ch 1
General Provisions
Ch 4
Authorities, Municipal
Ch 6
Boards and Commissions
Ch 14
Emergency Costs, Recovery of
Ch 25
Firemen's Relief Association
Ch 29
Salaries and Compensation
Ch 33
Tax Collector
Part II: General Legislation
Ch 47
Alarm Systems
Ch 50
Animals
Ch 53
Blight Reclamation and Revitalization
Ch 56
Brush, Grass and Weeds
Ch 60
Building Permits
Ch 65
Buildings, Numbering of
Ch 69
Burning, Open
Ch 78
Construction Codes, Uniform
Ch 82
Contractors, Registration of
Ch 94
Disorderly Conduct
Ch 98
Drugs and Drug Paraphernalia
Ch 107
Emergency Rescue Services
Ch 109
Events
Ch 115
Fireworks
Ch 124
Hazardous Materials
Ch 134
Lock Box Systems
Ch 136
Loitering
Ch 138
Mobile Facilities
Ch 139
Municipal Claims and Liens
Ch 141
Noise
Ch 145
Peddling and Soliciting
Ch 151
Pornography
Ch 157
Property Maintenance
Ch 162
Property, Storage of
Ch 165
Quality of Life
Ch 168
Rental Property
Ch 173
Sewers and Sewage Disposal
Ch 179
Signs
Ch 187
Solid Waste
Ch 192
Stormwater Management
Ch 192 Art I
General Provisions
§ 192-1
Short title.
§ 192-2
Statement of findings.
§ 192-3
Purpose.
§ 192-4
Statutory authority.
§ 192-5
Applicability.
§ 192-6
Repealer.
§ 192-7
Severability.
§ 192-8
Compliance with other provisions.
Ch 192 Art II
Definitions
§ 192-9
Definitions and word usage.
Ch 192 Art III
Stormwater Management Standards
§ 192-10
General requirements.
§ 192-11
Exemptions.
§ 192-12
Volume controls (Level 3 to Level 4).
§ 192-13
Rate controls (Level 4).
§ 192-14
Additional design criteria of stormwater management facilities associated with Level 4 SWM site plans.
§ 192-15
Calculation methodology for stormwater management facilities associated with Level 4 SWM site plans.
Ch 192 Art IV
Stormwater Management (SWM) Site Plan Requirements (Level 4)
§ 192-16
Plan requirements.
§ 192-17
Plan submission.
§ 192-18
Plan review.
§ 192-19
Modification of plans (submission of revised plans).
§ 192-20
Resubmission of disapproved SWM site plans.
§ 192-21
Authorization to construct and term of validity.
§ 192-22
As-built plans, completion certificate, and final inspection.
§ 192-23
Modification of standards (waiver).
Ch 192 Art V
Operation and Maintenance
§ 192-24
Responsibilities of developers and landowners.
§ 192-25
O&M agreements.
Ch 192 Art VI
Fees and Expenses
§ 192-26
General provisions.
§ 192-27
Financial guarantee.
Ch 192 Art VII
Prohibitions
§ 192-28
Prohibited discharges and connections.
§ 192-29
Roof drains, sump pumps and foundation drains.
§ 192-30
Alteration of SWM BMPs.
Ch 192 Art VIII
Enforcement and Penalties
§ 192-31
Right-of-entry.
§ 192-32
Inspection.
§ 192-33
Enforcement.
§ 192-34
Suspension and revocation.
§ 192-35
Violations and penalties.
§ 192-36
Appeals.
Ch 192 Art IX
References
§ 192-37
List of works cited.
Ch 192 Art X
Adoption
§ 192-38
Severability.
§ 192-39
Repealer.
§ 192-40
Effective date.
Ch 198
Streets and Sidewalks
Ch 204
Structures, Dangerous
Ch 210
Subdivision and Land Development
Ch 218
Taxation
Ch 230
Vehicles and Traffic
Ch 233
Vehicles, Recreational
Ch 236
Vehicles, Storage of
Ch 242
Water
Ch 255
Zoning
Disposition List
Ch DL
Disposition List
arrow_back
print
Print
email
Email
download
Download
share
Share
add_alert
Get Updates
arrow_forward
Chapter 192
Stormwater Management
[HISTORY: Adopted by the Board of Supervisors of the Township of Foster
6-8-2011
by
Ord. No. 4-2011
. Amendments noted where applicable.]
ATTACHMENTS
Attachment 1 - Appendix A, Operation and Maintenance Agreement
Attachment 2 - Appendix B, Stormwater Management Permit Application Guidelines
Attachment 3 - Appendix C1, Disconnected Impervious Area and Worksheet
Attachment 4 - Appendix C2, Rainspout Disconnection From Sanitary Sewer Systems Requirement
Attachment 5 - Appendix D, Level 3 Application
Attachment 6 - Appendix E, Level 2 Application
Attachment 7 - Appendix F1, Stormwater Management District Map
Attachment 8 - Appendix F2, Stormwater Management Permit Fee Schedule
Article I
General Provisions
chevron_right
§ 192-1
Short title.
chevron_right
§ 192-2
Statement of findings.
chevron_right
§ 192-3
Purpose.
chevron_right
§ 192-4
Statutory authority.
chevron_right
§ 192-5
Applicability.
chevron_right
§ 192-6
Repealer.
chevron_right
§ 192-7
Severability.
chevron_right
§ 192-8
Compliance with other provisions.
chevron_right
Article II
Definitions
chevron_right
§ 192-9
Definitions and word usage.
chevron_right
Article III
Stormwater Management Standards
chevron_right
§ 192-10
General requirements.
chevron_right
§ 192-11
Exemptions.
chevron_right
§ 192-12
Volume controls (Level 3 to Level 4).
chevron_right
§ 192-13
Rate controls (Level 4).
chevron_right
§ 192-14
Additional design criteria of stormwater management facilities associated with Level 4 SWM site plans.
chevron_right
§ 192-15
Calculation methodology for stormwater management facilities associated with Level 4 SWM site plans.
chevron_right
Article IV
Stormwater Management (SWM) Site Plan Requirements (Level 4)
chevron_right
§ 192-16
Plan requirements.
chevron_right
§ 192-17
Plan submission.
chevron_right
§ 192-18
Plan review.
chevron_right
§ 192-19
Modification of plans (submission of revised plans).
chevron_right
§ 192-20
Resubmission of disapproved SWM site plans.
chevron_right
§ 192-21
Authorization to construct and term of validity.
chevron_right
§ 192-22
As-built plans, completion certificate, and final inspection.
chevron_right
§ 192-23
Modification of standards (waiver).
chevron_right
Article V
Operation and Maintenance
chevron_right
§ 192-24
Responsibilities of developers and landowners.
chevron_right
§ 192-25
O&M agreements.
chevron_right
Article VI
Fees and Expenses
chevron_right
§ 192-26
General provisions.
chevron_right
§ 192-27
Financial guarantee.
chevron_right
Article VII
Prohibitions
chevron_right
§ 192-28
Prohibited discharges and connections.
chevron_right
§ 192-29
Roof drains, sump pumps and foundation drains.
chevron_right
§ 192-30
Alteration of SWM BMPs.
chevron_right
Article VIII
Enforcement and Penalties
chevron_right
§ 192-31
Right-of-entry.
chevron_right
§ 192-32
Inspection.
chevron_right
§ 192-33
Enforcement.
chevron_right
§ 192-34
Suspension and revocation.
chevron_right
§ 192-35
Violations and penalties.
chevron_right
§ 192-36
Appeals.
chevron_right
Article IX
References
chevron_right
§ 192-37
List of works cited.
chevron_right
Article X
Adoption
chevron_right
§ 192-38
Severability.
chevron_right
§ 192-39
Repealer.
chevron_right
§ 192-40
Effective date.
chevron_right