A.
It shall be the responsibility of the design professionals selected by the applicant to prepare the final subdivision plans to assure that the plans are complete. Each of the design professionals shall be available to answer questions and resolve construction problems as the project's construction progresses.
B.
All road pavement shall be tested and monitored by the design professional selected by the applicant. The testing shall take place in accordance with the current certification and construction oversight requirements of the Town of Somers. The applicant shall be responsible for the costs for these services.
C.
When the project is complete, each design professional shall certify that the project was constructed in accordance with the approved plans and the Town road specifications. This shall mean, without limitation, that horizontal and vertical alignment of all improvements is certified as built, and that specifications as to material type, gravel and bituminous compaction, concrete strength and material thickness have all been met according to the Town road specifications, as certified by a professional engineer. The Commission shall not recommend the approval and acceptance by the Town of any project lacking these certifications.