[Adopted 3-4-1991]
No fee or permit is required for necessary routine maintenance or repairs to existing buildings as defined in the Basic Building Code of the State of Connecticut.
A permit and fee is required for all new construction, alterations, removal, demolition, plumbing, electrical or other building operations.
[Amended 4-16-2009]
A. 
The fee schedule shall be as follows:
New Construction Estimated Building Costs
Fees
$1,000 or less
$20
$1,000.01 to $60,000
$20/$1,000 or fraction thereof
$60,000 to $120,000
$20/$1,000 or fraction thereof
Over $120,000
$20/$1,000 or fraction thereof
Additional Required Permits
Plumbing, electrical, heating
$20
Remodeling Alterations, Repairs and Miscellaneous
Structural and finish work
$20/$1,000 or fraction thereof
Plumbing, heating, electrical
$20/$1,000 or fraction thereof
Swimming pool, plus electrical and plumbing, if required
$20/$1,000 or fraction thereof
Siding, reroofing, chimneys, decks
$20/$1,000 or fraction thereof
Wood or coal stoves
$20/$1,000 or fraction thereof
Other Fees
House moving permit (plus building permit to erect on a foundation if the house is moved within the Town)
$100, plus septic test-repair and house moving
Demolition permit
$20/$1,000 or fraction thereof
Signs (if permit is required by Zoning Regulations)
$50 or less
No fee
Over $50
$20, plus electrical, if required
Permitted mobile homes and mobile home parks
$100
B. 
Exempt from the above fees are permit applications for the construction of buildings from public funds, such as schools, churches and charitable organizations, in which case the fee shall be $5.
[Added 12-7-2006]
Building permit fees may be waived by the Building Official for owner-occupied, single-family homes where at least one of the record owners is aged 62 or over and where the permit is to replace or upgrade the roofing, siding, windows or electrical or heating systems.