[Amended 6-11-2008]
A.
The owner of each lot or parcel of land with a building and a waste disposal system which abuts upon a street or public way containing a public sewer shall connect that building with the public sewer within 90 days after date of official notice to do so unless otherwise agreed to by the Select Board, provided that said public sewer is within 200 feet of the nearest point of the existing building and/or private on-site septic disposal systems. The owner shall cease using any other method for the disposal of wastewater upon connecting to the public sewer.
B.
The owner of a lot or parcel of land who proposes to construct a building within 200 feet of the public sewer shall connect the building to the public sewer if a waste disposal system is required unless otherwise agreed to by the Select Board.