A.
Increased residential, commercial and industrial development, ongoing and anticipated, within the Town of Bethel has created a need to undertake capital improvements to the existing wastewater facilities to accommodate and treat the increased wastewater flow directly produced and generated by this increased development. These capital improvements have created a cost which is separate and distinct from the normal maintenance and upgrading repairs which benefit existing users.
B.
In order to assess these capital improvement costs for increasing capacity fairly and equitably among those creating this demand, the Town hereby establishes a Sewer System Development Charge (referred to herein as "SSDC"). The proceeds from this charge shall be applied as prescribed herein.
C.
The SSDC is the new or expanded municipal sewer users' proportional share of outstanding debt, as of the end of the most recently completed fiscal year, and incurred in the construction of existing collection, pumping, transport, conveyance, treatment, and disposal capacity. Examples of this capacity include pipes, mains, manholes, pumping stations, and treatment plant. This charge is separate and distinct from the physical connection costs, the sewer rate, other sewer fees and any sewer extension costs. The SSDC is a fee for a sewer connection permit and is a one-time charge.