[HISTORY: Adopted by the Town Board of the Town of Ossining 10-27-1998 by L.L. No. 6-1998. Amendments noted where applicable.]
GENERAL REFERENCES
Cable communications — See Ch. 70.
Zoning — See Ch. 200.
The Telecommunications Act of 1996 affirmed the Town of Ossining's authority concerning the placement, construction and modification of wireless telecommunications facilities. The town recognizes that facilitating the development of wireless service technology can be an economic development asset to the town and of significant benefit to the town and its residents. In order to ensure that the placement, construction or modification of wireless telecommunications facilities is consistent with the town's land use policies, the town is adopting a single, comprehensive wireless telecommunications facilities application and permit process. The intent of this chapter is to minimize the negative impact of wireless telecommunications facilities, establish a fair and efficient process for review and approval of applications, assure an integrated, comprehensive review of environmental impacts of such facilities and protect the health, safety and welfare of the Town of Ossining.
This chapter may be known and cited as the "Wireless Telecommu-nications Facilities Siting and Special Use Permit Law for the Town of Ossining."
Any special use permit issued under this chapter shall be comprehensive and not severable. If part of a permit is deemed or ruled to be invalid or unenforceable in any material respect, by a competent authority, or is overturned by a competent authority, the permit shall be void in total, upon election by the Town Board.
For purposes of this chapter, and where not inconsistent with the context of a particular section, the defined terms, phrases, words, abbreviations and their derivations shall have the meanings given in this section. When not inconsistent with the context, words in the present tense include the future tense, words used in the plural number include words in the singular number and words in the singular number include the plural number. The word "shall" is always mandatory, and not merely directory.
ACCESSORY FACILITY OR STRUCTURE
An accessory facility or structure serving or being used in conjunction with wireless telecommunications facilities and located on the same property or lot as the wireless telecommunica-tions facilities, including but not limited to utility or transmission equipment storage sheds or cabinets.
ANTENNA
A system of electrical conductors that transmit or receive electromagnetic waves or radio frequency signals. Such waves shall include but not be limited to radio, television, cellular, paging, personal telecommunications services (PCS) and microwave telecom-munications.
APPLICANT
Any individual, corporation, estate, trust, partnership, joint-stock company, association of two or more persons, limited liability company or entity submitting an application to the Town of Ossining for a special use permit for wireless telecommunications facilities.
APPLICATION
The form approved by the Board, together with all necessary and appropriate documentation that an applicant submits in order to receive a special use permit for wireless telecommunications facilities.
BOARD
The Town Board of the Town of Ossining.
CAMOUFLAGED TOWER
Any tower or supporting structure that, due to design, location or appearance, partially or completely hides, obscures, conceals or otherwise disguises the presence of the tower and one or more antennas or antenna arrays affixed thereto.
COLLOCATION
The use of the same telecommunications tower or structure to carry two or more antennas for the provision of wireless services by two or more persons or entities.
COMMERCIAL IMPRACTICABILITY or COMMERCIALLY IMPRACTICABLE
Has the meaning in this chapter and any special use permit granted hereunder as is defined and applied in applicable case law and under the New York Uniform Commercial Code (UCC).
COMPLETED APPLICATION
An application that contains all information and/or data necessary to enable the Board to evaluate the merits of the application and to make an informed decision with respect to the effect and impact of wireless telecommunications facilities on the town in the context of the permitted land use for the particular location requested.
DIRECT-TO-HOME SATELLITE SERVICES or DIRECT BROADCAST SERVICE or DBS
Only programming transmitted or broadcast by satellite directly to subscribers' premises without the use of ground receiving equipment, except at the subscribers' premises or in the uplink process to the satellite.
EAF
The environmental assessment form approved by the New York Department of Environmental Conservation.
EPA
The state and/or Federal Environmental Protection Agency or its duly assigned successor agency.
FAA
The Federal Aviation Administration or its duly designated and authorized successor agency.
FCC
The Federal Communications Commission or its duly designated and authorized successor agency.
FREESTANDING TOWER
A tower that is not supported by guy wires and ground anchors or other means of attached or external support.
HEIGHT
When referring to a tower or structure, the distance measured from the preexisting grade level to the highest point on the tower or structure, even if said highest point is an antenna.
NIER
Nonionizing electromagnetic radiation.
PERSON
Any individual, corporation, estate, trust, partnership, joint-stock company, association of two or more persons having a joint common interest or a governmental entity.
PERSONAL WIRELESS FACILITY
See definition for "wireless telecommunications facilities."
PERSONAL WIRELESS SERVICES or PWS or PERSONAL TELECOMMUNICATIONS SERVICE OR PCS
The meaning used in the 1996 Telecommunications Act.
SPECIAL USE PERMIT
The official document or permit by which an applicant is allowed to construct and use wireless telecommunications facilities as granted or issued by the town.
STATE
The State of New York.
TELECOMMUNICATIONS
the transmission and reception of audio, video, data and other information by wire, radio frequency, light and other electronic or electromagnetic system.
TELECOMMUNICATIONS SITE
See definition for "wireless telecommunications facilities."
TELECOMMUNICATIONS STRUCTURE
A structure used in the provision of services described in the definition of "wireless telecommunications facilities."
TEMPORARY
In relation to all aspects and components of this chapter, something intended to, or that does, exist for fewer than 90 days.
TOWN
The Town of Ossining, New York.
WIRELESS TELECOMMUNICATIONS FACILITIES or TELECOMMUNICATIONS TOWER or TELECOMMUNICATIONS SITE or PERSONAL WIRELESS FACILITY
A structure or location designed, or intended to be used, or used to support antennas. It includes without limit freestanding towers, guyed towers, monopoles and similar structures that employ camouflage technology, including but not limited to structures such as a church steeple, silo, water tower, sign or other similar structures intended to mitigate the visual impact of an antenna or the functional equivalent of such. It is a structure intended for transmitting and/or receiving radio, television, cellular, paging, personal telecommunications services or microwave telecommunications, but excluding those used exclusively for fire, police and other dispatch telecommunications or exclusively for private radio and television reception and private citizens bands, amateur radio and other similar telecommunications.
In order to ensure that the placement, construction and modification of wireless telecommunications facilities protect the town's health, safety, public welfare, environmental features and other aspects of the quality of life specifically listed elsewhere in this chapter, the Board adopts an overall policy with respect to special use permits for wireless telecommunications facilities for the express purpose of achieving the following goals:
A. 
Implementing an application process for persons seeking special use permits for wireless telecommunications facilities.
B. 
Establishing a policy for examining applications for and issuing special use permits for wireless telecommunications facilities that is both fair and consistent.
C. 
Establishing reasonable time frames for granting or not granting special use permits for wireless telecommunications facilities, or recertifying or not recertifying or revoking any special use permit granted under this chapter.
D. 
Promoting and encouraging, wherever possible, the sharing and/or collocation of wireless telecommunications facilities among service providers.
E. 
Promoting and encouraging, wherever possible, the placement, height and number of wireless telecommunications facilities in such a manner as to minimize adverse aesthetic impacts to the land, property, buildings and other facilities adjacent to, surrounding and in generally the same area as the requested location of such wireless telecommunications facilities.
A. 
All applicants for special use permits for wireless telecommunications facilities shall, in addition to the other requirements in this chapter, comply with the requirements set forth in this section. The Board is the officially designated agency or body of the community to whom applications for special use permits for wireless telecommunications facilities must be made, and that is authorized to review, analyze, evaluate and make decisions with respect to granting or not granting, recertifying or not recertifying, or revoking special use permits for wireless telecommunications facilities. The Board may, at its discretion, delegate or designate other official agencies of the town to accept, review, analyze, evaluate and make recommendations to the Board with respect to the granting or not granting, recertifying or not recertifying, or revoking of special use permits for wireless telecommunications facilities.
B. 
An application for a special use permit for wireless telecommunications facilities shall be signed on behalf of the applicant by the person preparing the same and with knowledge of the contents and representations made therein and attesting to the truth and completeness of the information. The landowner, if different than the applicant, shall also sign the application. At the discretion of the Board, any false or misleading statement in the application may subject the applicant to denial of the application without further consideration or opportunity for correction.
C. 
Applications not meeting the requirements stated herein or which are otherwise incomplete may be rejected by the Board.
D. 
The applicant shall include a statement in writing:
(1) 
That the applicant's proposed wireless telecommu-nications facilities shall be maintained in a safe manner and in compliance with all conditions of the special use permit, as well as all applicable and permissible local codes, ordinances and regulations, including any and all applicable county, state and federal laws, rules, and regulations;
(2) 
That the construction of the wireless telecommuni-cations facilities are legally permissible and that the applicant is authorized to do business in New York State.
E. 
No wireless telecommunications facilities shall be installed or constructed until the site plan therefor has been reviewed and approved by the Board.
F. 
All applications for the construction or installation of new wireless telecommunications facilities shall be accompanied by a report containing the information hereinafter set forth. The report shall be signed by a licensed professional engineer registered in the State of New York. Where this section calls for certification, such certification shall be by a qualified New York State licensed professional engineer acceptable to the town unless otherwise noted.
(1) 
Name, address and phone number of the person preparing the report.
(2) 
Name, address and phone number of the property owner, operator and applicant, to include the legal form of the applicant.
(3) 
Postal address and Tax Map parcel number of the property.
(4) 
Zoning district or designation in which the property is situated.
(5) 
Size of the property, stated both in square feet and lot line dimensions, and a diagram showing the location of all lot lines.
(6) 
Location of nearest residential structure.
(7) 
Location of nearest habitable structure.
(8) 
Location, size and height of all structures on the property which is the subject of the application.
(9) 
Location, size and height of all proposed and existing antennas and all appurtenant structures.
(10) 
Type, size and location of all proposed and existing landscaping.
(11) 
The number, type and design of the telecommunica-tions tower(s) and antenna(s) proposed and the basis for the calculations of the telecommunica-tions tower's capacity to accommodate multiple users.
(12) 
The make, model and manufacturer of the tower and antenna(s).
(13) 
A description of the proposed tower and antenna(s) and all related fixtures, structures, appurtenances and apparatus, including height above preexisting grade, materials, color and lighting.
(14) 
The frequency, modulation and class of service of radio or other transmitting equipment.
(15) 
Transmission and maximum effective radiated power of the antenna(s).
(16) 
Direction of maximum lobes and associated radiation of the antenna(s).
(17) 
The applicant's proposed tower maintenance and inspection procedures and related system of records.
(18) 
Certification that NIER levels at the proposed site are within the threshold levels adopted by the FCC, though the certifying engineer need not be approved by the Board.
(19) 
Certification that the proposed antenna(s) will not cause interference with existing telecommuni-cations devices, though the certifying engineer need not be approved by the Board.
(20) 
A copy of the FCC license applicable for the use of wireless telecommunications facilities.
(21) 
Certification that a topographic and geomorphologic study and analysis has been conducted and that, taking into account the subsurface and substrata and the proposed drainage plan, the site is adequate to assure the stability of the proposed wireless telecommunications facilities on the proposed site, though the certifying engineer need not be approved by the Board.
(22) 
Propagation studies of the proposed site and all adjoining proposed or in-service or existing sites.
(23) 
The applicant shall disclose in writing any agreement in existence prior to submission of the application that would limit or preclude the ability of the applicant to share an new telecommu-nications tower that it constructs.
G. 
In the case of a new telecommunications tower, the applicant shall be required to submit a written report demonstrating its efforts to secure shared use of existing telecommunications tower(s). Copies of written requests and responses for shared use shall be provided to the Board.
H. 
The applicant shall furnish written certification that the telecommunications tower and attachments both are designed and constructed ("as built") to meet all local, county, state and federal structural requirements for loads, including wind and ice loads.
I. 
The applicant shall furnish written certification that the telecommunications tower is designed with a break point that would result in the telecommunications tower falling or collapsing within the boundaries of the property on which the telecommunications tower is placed.
J. 
After construction and prior to receiving a certificate of compliance, the applicant shall furnish written certification that the wireless telecommunications facilities are grounded and bonded so as to protect persons and property and installed with appropriate surge protectors.
K. 
The applicant shall submit a completed long-form EAF and a completed visual EAF addendum. The Board may require submission of a more detailed visual analysis based on the results of the visual EAF addendum. Applicants are encouraged to seek preapplication meetings with the Town Board to address the scope of the required visual assessment.
L. 
If requested by the Board, the applicant shall furnish a visual impact assessment which shall include:
(1) 
A "zone of visibility map: which shall be provided in order to determine locations where the tower may be seen.
(2) 
Pictorial representations of "before and after" views from key viewpoints both inside and outside of the town, including but not limited to state highways and other major roads; state and local parks; other public lands; historic districts; preserves and historic sites normally open to the public; and from any other location where the site is visible to a large number of visitors, travelers or residents. The Board, acting in consultation with its consultants or experts, will provide guidance concerning the appropriate key sites at a preapplication meeting.
(3) 
An assessment of the visual impact of the tower base, guy wires and accessory buildings from abutting and adjacent properties and streets.
M. 
Any and all representations made by the applicant to the Board on the record, during the application process, whether written or verbal, shall be deemed a part of the application and may be relied upon in good faith by the Board.
N. 
The applicant shall, in a manner approved by the Board, effectively screen from view its proposed wireless telecommunications facilities base and all related facilities and structures.
O. 
All utilities from wireless telecommunications facilities sites shall be installed underground and in compliance with all laws, rules and regulations of the town, including specifically, but not limited to, the National Electrical Safety Code and the National Electrical Code where appropriate. The Board may waive or vary the requirements of undergrounding installation of utilities whenever, in the opinion of the Board, such variance or waiver shall not be detrimental to the health, safety, general welfare and environment, including the visual and scenic characteristics of the area.
P. 
All wireless telecommunications facilities shall be sited so as to have the minimal adverse visual effect on the environment and its character and the residences in the area of the wireless telecommunications facilities sites.
Q. 
Accessory facilities shall maximize use of building materials, colors and textures designed to harmonize with the natural surroundings.
R. 
At a telecommunications site, an access road and parking shall be provided to assure adequate emergency and service access. Maximum use of existing roads, whether public or private, shall be made to the extent practicable. Road construction shall at all times minimize ground disturbance and vegetation cutting. Road grades shall closely follow natural contours to assure minimal visual disturbance and reduce soil erosion.
S. 
A person who holds a special use permit for wireless telecommunications facilities shall construct, operate, maintain, repair, provide for removal of, modify or restore the permitted wireless telecommunications facilities in strict compliance with all current technical, safety and safety-related codes adopted by the town, county, state or United States, including but not limited to the most recent editions of the National Electrical Safety Code and the National Electrical Code, as well as accepted and responsibly workmanlike industry practices and recommended practices of the National Association of Tower Erectors. The codes referred to are codes that include, but are not limited to, construction, building, electrical, fire, safety, health and land use codes.
T. 
A holder of a special use permit granted under this chapter shall obtain, at its own expense, all permits and licenses required by applicable rule, regulation or law and must maintain the same, in full force and effect, for as long as required by the town or other governmental entity or agency having jurisdiction over the applicant.
U. 
With respect to this application process, the Board will normally seek to have lead agency status, pursuant to the State Environmental Quality Review Act (SEQRA). The Board shall conduct an environmental review of the proposed project in combination with its review of the application under this chapter.
V. 
An applicant shall submit no fewer than eight copies of the entire completed application to the Board and a copy of the application to the legislative body of any adjacent municipality and to the County Planning Agency.
W. 
The applicant shall examine the feasibility of designing a proposed telecommunications tower to accommodate future demand for at least two additional commercial applications, for example, future collocations. The scope of this examination shall be determined by the Board. The telecommunications tower shall be structurally designed to accommodate at least two additional antenna arrays equal to those of the applicant, and located as close to the applicant's antenna as possible without causing interference. This requirement may be waived, provided that the applicant, in writing, demonstrates that the provisions of future shared usage of the telecommunications tower is not technologically feasible, or is commercially impracticable and creates an unnecessary and unreasonable burden, based upon:
(1) 
The number of FCC licenses foreseeably available for the area.
(2) 
The kind of wireless telecommunications facilities site and structure proposed.
(3) 
The number of existing and potential licenses without wireless telecommunications facilities spaces/sites.
(4) 
Available space on existing and approved telecom-munications towers.
X. 
The applicant shall submit to the Board a letter of intent committing the owner of the proposed new tower, and his/her successors in interest, to negotiate in good faith for shared use of the proposed tower by other tele-communications providers in the future. This letter shall filed with the Board. Failure to abide by the conditions outlined in the letter may be grounds for revocation of the special use permit. The letter shall commit the new tower owner and his/her successors in interest to:
(1) 
Respond within 60 days to a request for information from a potential shared-use applicant.
(2) 
Negotiate in good faith concerning future requests for shared use of the new tower by other telecom-munications providers.
(3) 
Allow shared use of the new tower if another tele-communications provider agrees in writing to pay reasonable charges. The charges may include, but are not limited to, a pro rata share of the cost of site selection, planning, project administration, land costs, site design, construction and maintenance financing, return on equity, less depreciation, and all of the costs of adapting the tower or equipment to accommodate a shared user without causing electromagnetic interference.
Y. 
Unless waived by the Board, there shall be a preapplication meeting. The purpose of the preapplication meeting will be to address issues which will help to expedite the review and permitting process. Where the application is for the shared use of an existing telecommunications tower(s) or other high structure, the applicant should seek to waive any section or subsection of this chapter that may not be required. At the preapplication meeting, (this may include a site visit if required) the waiver requests, if appropriate, will be decided by the Board and its consultants. Costs of the town's consultants to prepare for and attend the preapplication meeting will be borne by the applicant.
A. 
Applicants for wireless telecommunications facilities shall locate, site and erect said wireless telecommunica-tions facilities in accordance with the following priorities, Subsection A(1) being the highest priority and Subsection A(4) being the lowest priority:
(1) 
On existing telecommunications towers or other tall structures.
(2) 
Collocation on a site with existing wireless tele-communications facilities or structures.
(3) 
On municipally owned properties.
(4) 
Along and within existing power line easements.
(5) 
On other property in the town in the following order of priority:
(a) 
Office Research Manufacturing District (O-RM).
(b) 
General Business District-1 (GB-1).
(c) 
General Business District (GB).
(d) 
Business Education District (BE).
(e) 
All residential districts (R-40, R-35, R-20, R-20, R-20A, R-15, R-15X, R-10, R-7.5, R-5 and MF).
B. 
If the proposed property site is not the highest priority listed above, then a detailed explanation must be provided as to why a site of a higher priority was not selected. The person seeking such an exception must satisfactorily demonstrate the reason or reasons why such a permit should be granted for the proposed site, and the hardship that would be incurred by the applicant if the permit were not granted for the proposed site.
C. 
An applicant may not bypass sites of higher priority by stating the site presented is the only site leased or selected. An application shall address collocation as an option and if such option is not proposed, the applicant must explain why collocation is commercially or otherwise impracticable. Agreements between providers limiting or prohibiting collocation shall not be a valid basis for any claim of commercial impracticability or hardship.
D. 
Notwithstanding the above, the Board may approve any site located within an area in the above list of priorities, provided that the Board finds that the proposed site is in the best interest of the health, safety and welfare of the Town and its inhabitants.
E. 
The applicant shall submit a written report demonstrating the applicant's review of the above locations in order of priority, demonstrating the technological reason for the site selection. If the site selected is not the highest priority, then a detailed written explanation as to why sites of a higher priority were not selected shall be included with the application.
F. 
The applicant shall, in writing, identify and disclose the number and locations of any additional sites that the applicant has been, is or will be considering, reviewing or planning for wireless telecommunications facilities in the town, and all municipalities adjoining the town, for a two-year period following the date of the application.
G. 
Notwithstanding that a potential site may be situated in an area of highest priority or highest available priority, the Board may disapprove an application for any of the following reasons:
(1) 
Conflict with safety and safety-related codes and requirements;
(2) 
Conflict with the historic nature of a neighborhood or historical district;
(3) 
The placement and location of wireless telecommu-nications facilities which would create an unacceptable risk, or the probability of such, to residents, the public, employees and agents of the town or employees of the service provider or other service providers; or
(4) 
Conflicts with the provisions of this chapter.
A. 
Shared use of existing wireless telecommunications facilities shall be preferred by the town, as opposed to the proposed construction of a new telecommunications tower. Where such shared use is unavailable, location of antennas on other preexisting structures shall be considered and preferred. The applicant shall submit a comprehensive report inventorying existing towers and other appropriate structures within four miles of any proposed new tower site, unless the applicant can show that some other distance is more reasonable, and outlining opportunities for shared use of existing facilities and the use of other preexisting structures as a preferred alternative to new construction.
B. 
An applicant intending to share use of an existing telecommunications tower or other tall structure shall be required to document the intent of the existing owner to share use. In the event of an application to share the use of an existing telecommunications tower which does not increase the height of the telecommunications tower, the Board shall waive such requirements of the application required by this chapter as may be for good cause shown.
C. 
Such shared use shall consist only of the minimum antenna array technologically required to provide service within the town, to the extent practicable, unless good cause is shown.
A. 
The applicant must submit documentation justifying to the Board the total height of any telecommunications tower and/or antenna and the basis therefor. Such justification shall be to provide service within the town, to the extent practicable, unless good cause is shown.
B. 
Telecommunications towers shall be no higher than the minimum height necessary. Unless waived by the Board upon good cause shown, the presumed maximum height shall be 140 feet, based on three collocated antenna arrays and ambient tree height of 80 feet.
C. 
The maximum height of any telecommunications tower and attached antennas constructed after the effective date of this chapter shall not exceed that which shall permit operation without artificial lighting of any kind or nature, in accordance with municipal, county, state and/or any federal law and/or regulation.
A. 
Wireless telecommunications facilities shall not be artificially lighted or marked, except as required by law.
B. 
Telecommunications towers shall be of a galvanized finish, or painted with a rust-preventive paint of an appropriate color to harmonize with the surroundings as approved by the Board, and shall be maintained in accordance with the requirements of this chapter.
C. 
If lighting is required, the applicant shall provide a detailed plan for sufficient lighting of as unobtrusive and inoffensive an effect as is permissible under state and federal regulations and an artist's rendering or other visual representation showing the effect of light emanating from the site on neighboring habitable structures within 1,500 feet of all property lines of the parcel on which the wireless telecommunications facilities are located.
All wireless telecommunications facilities and antennas shall be located, fenced or otherwise secured in a manner which prevents unauthorized access. Specifically as follows:
A. 
All antennas, towers and other supporting structures, including guy wires, shall be made inaccessible to individuals and constructed or shielded in such a manner that they cannot be climbed or run into.
B. 
Transmitters and telecommunications control points must be installed such that they are readily accessible only to persons authorized to operate or service them.
Wireless telecommunications facilities shall contain a sign no larger than four square feet to provide adequate notification to persons in the immediate area of the presence of an antenna that has transmission capabilities. The sign shall contain the name(s) of the owner(s) and operator(s) of the antenna(s) as well as emergency phone number(s). The sign shall be located so as to be visible from the access point of the site. The sign shall not be lighted unless the Board shall have allowed such lighting or unless such lighting is required by applicable provisions of law. The sign shall be approved by the Board before installation. No other signage, including advertising, shall be permitted on any facilities, antennas, antenna supporting structures or antenna towers, unless required by law.
A. 
All proposed wireless telecommunications facilities shall be set back from abutting parcels, recorded rights-of-way and road and street lines a distance sufficient to substantially contain on site all icefall or debris from a tower or tower failure and to preserve the privacy and sanctity of any adjoining properties.
B. 
Wireless telecommunications facilities shall be located with a minimum setback from any property line a distance equal to the height of the wireless telecommunications facility or the existing setback requirement of the underlying zoning district, whichever is greater. Further, any accessory structure shall be located so as to comply with the applicable minimum setback requirements for the property on which it is situated.
A. 
The Board may hire any consultant and/or expert necessary to assist the Board in reviewing and evaluating the application and any requests for recertification.
B. 
An applicant shall deposit with the town funds sufficient to reimburse the town for all reasonable costs of consultant and expert evaluation and consultation to the Board in connection with the review of any application. The initial deposit shall be $7,500. These funds shall accompany the filing of an application, and the town will maintain a separate escrow account for all such funds. The town's consultants/experts shall bill or invoice the town no less frequently than monthly for its services in reviewing the application and performing its duties. If at any time during the review process this escrow account has a balance less than $2,500, the applicant shall immediately, upon notification by the town, replenish said escrow account so that it has a balance of at least $2,500. Such additional escrow funds must be deposited with the town before any further action or consideration is taken on the application. In the event that the amount held in escrow by the town is more than the amount of the actual billing or invoicing, the difference shall be promptly refunded to the applicant.
C. 
The total amount of the funds set forth in Subsection B of this section may vary with the scope and complexity of the project, the completeness of the application and other information as may be needed by the Board or its consultant/expert to complete the necessary review and analysis. Additional escrow funds, as required and requested by the town, shall be paid by the applicant.
A. 
No person shall be permitted to site, place, build, construct or modify, or prepare any site for the placement or use of, wireless telecommunications facilities as of the effective date of this chapter without having first obtained a special use permit for wireless telecommunications facilities. Notwithstanding anything to the contrary in this section, no special use permit shall be required for those exceptions noted in the definition of "wireless telecommunications facilities."
B. 
New construction, including routine maintenance on existing wireless telecommunications facilities, shall comply with the requirements of this chapter.
C. 
All wireless telecommunications facilities existing on or before the effective date of this chapter shall be allowed to continue as they presently exist; provided, however, that any modification to existing wireless telecommunications facilities must comply with this chapter.
A. 
Prior to the approval of any application for a special use permit for wireless telecommunications facilities, a public hearing shall be held by the Board, notice of which shall be published in the official newspaper of the town no less than 10 calendar days prior to the scheduled date of the public hearing. In order that the town may notify nearby landowners, the applicant, at least three weeks prior to the date of said public hearing shall be required to provide the names and address of all landowners whose property is located within 1,500 feet of any property line of the lot on which the proposed new wireless telecommunications facilities are proposed to be located.
B. 
The Board shall schedule the public hearing referred to in Subsection A of this section once it finds the application is complete. The Board, at any stage prior to issuing a special use permit, may require such additional information as it deems necessary.
A. 
The Board will undertake a review of an application pursuant to this chapter in a timely fashion, consistent with its responsibilities with SEQRA, and shall act within a reasonable period of time given the relative complexity of the application and the circumstances, with due regard for the public's interest and need to be involved, and the applicant's desire for a timely resolution.
B. 
The Board may refer any application or part thereof to any advisory or other committee for a nonbinding recommendation.
C. 
Except for necessary building permits, and subsequent certificates of compliance, no additional permits or approvals from the town shall be required for wireless telecommunications facilities covered by this chapter.
D. 
After the public hearing and after formally considering the application, the Board may approve and issue or deny a special use permit. Its decision shall be in writing and shall be supported by substantial evidence contained in a written record. The burden of proof for the grant of the permit shall always be upon the applicant.
E. 
If the Board approves the special use permit for wireless telecommunications facilities, then the applicant shall be notified of such approval in writing within 10 calendar days of the Board's action, and the special use permit shall be issued within 30 days after such approval.
F. 
If the Board denies the special use permit for wireless telecommunications facilities, then the applicant shall be notified of such denial in writing within 10 calendar days of the Board's action.
G. 
The town's decision on an application for a special use permit for wireless telecommunications facilities shall be supported by substantial evidence contained in a written record.
A. 
At any time between 12 months and six months prior to the five-year anniversary date after the effect date of the permit and all subsequent fifth anniversaries of the effective date of the original special use permit for wireless telecommunications facilities, the holder of a special use permit for such wireless telecommunications facilities shall submit a signed written request to the Board for recertification. In the written request for recertification, the holder of such special use permit shall note the following:
(1) 
The name of the holder of the special use permit for the wireless telecommunications facilities.
(2) 
If applicable, the number or title of the special use permit.
(3) 
The date of the original granting of the special use permit.
(4) 
Whether the wireless telecommunications facilities have been moved, relocated, rebuilt or otherwise modified since the issuance of the special use permit.
(5) 
If the wireless telecommunications facilities have been moved, relocated, rebuilt or otherwise modified, then whether the Board approved such action, and under what terms and conditions, and whether those terms and conditions were met.
(6) 
Any requests for waivers or relief of any kind whatsoever from the requirements of this chapter and any requirements for a special use permit.
(7) 
That the wireless telecommunications facilities are in compliance with the special use permit and compliance with all applicable codes, laws, rules and regulations.
(8) 
Recertification that the telecommunications tower and attachments both are designed and constructed ("as built") and continue to meet all local, county, state and federal structural requirements for loads, including wind and ice loads. Such recertification shall be by a qualified New York State licensed professional engineer acceptable to the town, the cost of which shall be borne by the applicant.
B. 
If, after such review, the Board determines that the permitted wireless telecommunications facilities are in compliance with the special use permit and all applicable statutes, laws, local laws, ordinances, codes, rules and regulations, then the Board shall issue a recertification special use permit for the wireless telecommunications facilities, which may include any new provisions or conditions that are mutually agreed upon or required by applicable statutes, laws, local laws, ordinances, codes, rules and regulations. If, after such review, the Board determines that the permitted wireless telecommunications facilities are not in compliance with the special use permit and all applicable statutes, local laws, ordinances, codes, rules and regulations, then the Board may refuse to issue a recertification special use permit for the wireless telecommunications facilities, and in such event, such wireless telecommunications facilities shall not be used after the date that the applicant receives written notice of such decision by the Board. Any such decision shall be in writing and supported by substantial evidence contained in a written record.
C. 
If the Board does not complete its review, as noted in Subsection B of this section, prior to the five-year anniversary date of the special use permit, or subsequent fifth anniversaries, then the applicant for the permitted wireless telecommunications facilities shall receive an extension of the special use permit for up to six months, in order for the Board to complete its review.
D. 
If the holder of a special use permit for wireless telecommunications facilities does not submit a request for recertification of such special use permit within the timeframe noted in Subsection A of this section, then such special use permit and any authorizations granted thereunder shall cease to exist on the date of the fifth anniversary of the original granting of the special use permit, or subsequent fifth anniversaries, unless the holder of the special use permit adequately demonstrates to the Board that extenuating circumstances prevented a timely recertification request. If the Board agrees that there were legitimately extenuating circumstances, then the holder of the special use permit may submit a late recertification request or application for a new special use permit.
The extent and parameters of a special use permit for wireless telecommunications facilities shall be as follows:
A. 
Such special use permit shall be nonexclusive.
B. 
Such special use permit shall not be assigned, transferred or conveyed without the express prior written consent of the Board, and such consent shall not be unreasonably withheld or delayed.
C. 
Such special use permit may, following a hearing upon due prior notice to the applicant, be revoked, canceled or terminated for a violation of the conditions and provisions of the special use permit for wireless telecommunications facilities, or for a material violation of this chapter after prior written notice to the applicant and the holder of the special use permit.
A. 
At the time that a person submits an application for a special use permit for a new telecommunications tower or wireless facility, such person shall pay an application fee in accordance with the fee schedule established by resolution of the Board.
B. 
No application fee is required in order to recertify a special use permit for wireless telecommunications facilities, unless there has been a modification of the wireless telecommunications facilities since the date of the issuance of the existing special use permit. In the case of any modification, the fees provided in Subsection A shall apply.
The applicant and the owner of record of any proposed wireless telecommunications facilities property site shall, at its cost and expense, be jointly required to execute and file with the town a bond, or other form of security acceptable to the town as to type of security and the form and manner of execution, in an amount of $75,000 and with such sureties as are deemed sufficient by the Board to assure the faithful performance of the terms and conditions of this chapter and conditions of any special use permit issued pursuant to this chapter. The full amount of the bond or security shall remain in full force and effect throughout the term of the special use permit and/or until the removal of the wireless telecommunications facilities and any necessary site restoration is completed. The failure to pay any annual premium for the renewal of any such security shall be a violation of the provisions of the special use permit and shall entitle the Board to revoke the special use permit after prior written notice to the applicant and holder of the permit and after a hearing upon due prior notice to the applicant and holder of the special use permit.
A. 
In order to verify that the holder of a special use permit for wireless telecommunications facilities and any and all lessees, renters and/or licensees of wireless telecommunications facilities place and construct such facilities, including towers and antennas, in accordance with all applicable technical, safety, fire, building and zoning codes, laws, ordinances and regulations and other applicable requirements, the town may inspect all facets of said permit holder's, renter's, lessee's or licensee's placement, construction, modification and maintenance of such facilities, including, but not limited to, towers, antennas and buildings or other structures constructed or located on the permitted site.
B. 
The town shall pay for costs associated with such an inspection, except for those circumstances occasioned by said holder's, lessee's or licensee's refusal to provide necessary information, or necessary access to such facilities, including towers, antennas and appurtenant or associated facilities, or refusal to otherwise cooperate with the town with respect to an inspection, or if violations of this chapter are found to exist, in which case the holder, lessee or licensee shall reimburse the town for the cost of the inspection.
C. 
Payment of such costs shall be made to the town within 30 days from the date of the invoice or other demand for reimbursement. In the event that the finding(s) of violation is/are appealed in accordance with the procedures set forth in this chapter, said reimbursement payment must still be paid to the town and the reimbursement shall be placed in an escrow account established by the town specifically for this purpose, pending the final decision on appeal.
The holder of the special use permit shall, annually, certify in writing to the town that NIER levels at the site are within the threshold levels adopted by the FCC. (The certifying engineer need not be approved by the town.)
A. 
A holder of a special use permit for wireless telecommu-nications facilities shall secure and at all times maintain public liability insurance for personal injuries, death and property damage, and umbrella insurance coverage, for the duration of the special use permit in amounts as set forth below:
(1) 
Commercial general liability covering personal injuries, death and property damage: $1,000,000 per occurrence/$2,000,000 aggregate.
(2) 
Automobile coverage: $1,000,000 per occurrence/$2,000,000 aggregate.
(3) 
Workers compensation and disability: statutory amounts.
B. 
The commercial general liability insurance policy shall specifically include the town and its officers, boards, employees, committee members, attorneys, agents and consultants as additional named insureds.
C. 
The insurance policies shall be issued by an agent or representative of an insurance company licensed to do business in the state and with a Best's rating of at least A.
D. 
The insurance policies shall contain an endorsement obligating the insurance company to furnish the town with at least 30 days' prior written notice in advance of the cancellation of the insurance.
E. 
Renewal or replacement policies or certificates shall be delivered to the town at least 15 days before the expiration of the insurance which such policies are to renew or replace.
F. 
Before construction of a permitted wireless telecommunications facilities is initiated, but in no case later than 15 days after the grant of the special use permit, the holder of the special use permit shall deliver to the town a copy of each of the policies or certificates representing the insurance in the required amounts.
A. 
In the event of a violation of this chapter or any special use permit issued pursuant to this chapter, the Board may impose and collect, and the holder of the special use permit for wireless telecommunications facilities shall pay to the town, fines or penalties as set forth below.
B. 
A violation of this chapter is hereby declared to be an offense, punishable by a fine not exceeding $350 or imprisonment for a period not to exceed six months, or both, for conviction of a first offense; for conviction of a second offense, both of which were committed within a period of five years, punishable by a fine not less than $350 nor more than $700 or imprisonment for a period not to exceed six months, or both; and, upon conviction for a third or subsequent offense, all of which were committed within a period of five years, punishable by a fine not less than $700 nor more than $1,000 or imprisonment for a period not to exceed six months, or both. However, for the purpose of conferring jurisdiction upon courts and judicial officers generally, violations of this chapter or of such ordinance or regulation shall be deemed misdemeanors and for such purpose only all provisions of law relating to misdemeanors shall apply to such violations. Each week's continued violation shall constitute a separate additional violation.
C. 
Notwithstanding anything in this chapter, the holder of the special use permit for wireless telecommunications facilities may not use the payment of fines, liquidated damages or other penalties to evade or avoid compliance with this chapter or any section of this chapter. An attempt to do so shall subject the holder of the special use permit to termination and revocation of the special use permit. The town may also seek injunctive relief to prevent the continued violation of this chapter, without limiting other remedies available to the town.
A. 
If wireless telecommunications facilities are repaired, rebuilt, placed, moved, relocated, modified or maintained in a way that is inconsistent or not in compliance with the provisions of this chapter or of the special use permit, then the Board shall notify the holder of the special use permit in writing of such violation. Such notice shall specify the nature of the violation or noncompliance and that the violations must be corrected within seven days of the date of the postmark of the notice, or of the date of personal service of the notice, whichever is earlier. Notwithstanding anything to the contrary in this subsection or any other section of this chapter, if the violation causes, creates or presents an imminent danger or threat to the health or safety of lives or property, the Board may, at its sole discretion, order the violation remedied within 24 hours.
B. 
If within the period set forth in Subsection A above the wireless telecommunications facilities are not brought into compliance with the provisions of this chapter or of the special use permit, or substantial steps are not taken in order to bring the affected wireless telecommu-nications facilities into compliance, then the Board may revoke such special use permit for wireless telecommuni-cations facilities and shall notify the holder of the special use permit within 48 hours of such action.
A. 
Under the following circumstances, the Board may determine that the health, safety and welfare interests of the town warrant and require the removal of wireless telecommunications.
(1) 
Wireless telecommunications facilities with a permit have been abandoned (i.e. not used as wireless telecommunications facilities) for a period exceeding 90 consecutive days or a total of 180 days in any three-hundred-sixty-five-day period, except for periods caused by force majeure or acts of God, in which case, repair or removal shall commence within 90 days.
(2) 
Permitted wireless telecommunications facilities fall into such a state of disrepair that it creates a health or safety hazard.
(3) 
Wireless telecommunications facilities have been located, constructed or modified without first obtaining, or in a manner not authorized by, the required special use permit or any other necessary authorization.
B. 
If the Board makes such a determination as noted in Subsection A of this section, then the Board shall notify the holder of the special use permit for the wireless telecommunications facilities within 48 hours that said wireless telecommunications facilities are to be removed. The Board may approve an interim temporary use agreement/permit, such as to enable the sale of the wireless telecommunications facilities.
C. 
The holder of the special use permit, or its successors or assigns, shall dismantle and remove such wireless telecommunications facilities, and all associated structures and facilities, from the site and restore the site to as close to its original condition as is possible, such restoration being limited only by physical or commercial impracticability, within 90 days of receipt of written notice from the Board. However, if the owner of the property upon which the wireless telecommunications facilities are located wishes to retain an access roadway to the wireless telecommunications facilities, the owner may do so with the approval of the Board.
D. 
If wireless telecommunications facilities are not removed or substantial progress has not been made to remove the wireless telecommunications facilities within 90 days after the permit holder has received notice, then the Board may order officials or representatives of the town to remove the wireless telecommunications facilities at the sole expense of the owner or special use permit holder.
E. 
If, the town removes, or causes to be removed, wireless telecommunications facilities, and the owner of the wireless telecommunications facilities does not claim the property and remove it from the site to a lawful location within 10 days, then the town may take steps to declare the wireless telecommunications facilities abandoned and sell it and its components.
F. 
Notwithstanding anything in this section to the contrary, the Board may approve a temporary use permit/agreement for the wireless telecommunications facilities, for no more than 90 days, during which time a suitable plan for removal, conversion or relocation of the affected wireless telecommunications facilities shall be developed by the holder of the special use permit, subject to the approval of the Board, and an agreement to such plan shall be executed by the holder of the special use permit and the town. If such a plan is not developed, approved and executed within the ninety-day time period, then the town may take possession of and dispose of the affected wireless telecommunications facilities in the manner provided in this section.
Any applicant desiring relief or exemption from any aspect or requirement of this chapter may request such from the Board at a preapplication meeting, provided that the relief or exemption is contained in the original application for either a special use permit, or in the case of an existing or previously granted special use permit, a request for modification of its tower and/or facilities. Such relief may be temporary or permanent, partial or complete, at the sole discretion of the Board. However, the burden of proving the need for the requested relief or exemption is solely on the applicant to prove to the satisfaction of the Board. The applicant shall bear all costs of the Board or the town in considering the request, and the relief shall not be transferable to a new or different holder of the permit or owner of the tower or facilities without the specific written permission of the Board. Such permission shall not be unreasonably withheld or delayed. No such relief or exemption shall be approved unless the applicant demonstrates by clear and convincing evidence that, if granted, the relief or exemption will have no significant effect on the health, safety and welfare of the town, its residents and other service providers.
A. 
The Board may at any time conduct a review and examination of this entire chapter.
B. 
If, after such a periodic review and examination of this chapter, the Board determines that one or more provisions of this chapter should be amended, repealed, revised, clarified or deleted, then the Board may take whatever measures are necessary in accordance with applicable law in order to accomplish the same. It is noted that where warranted, and in the best interests of the town, the Board may repeal this entire chapter at any time.
C. 
Notwithstanding the provisions of Subsections A and B of this section, the Board may at any time, and in any manner (to the extent permitted by federal, state, or local Law), amend, add, repeal and/or delete one or more provisions of this chapter.
A. 
To the extent that the holder of a special use permit for wireless telecommunications facilities has not received relief, or is not otherwise exempt, from appropriate state and/or federal agency rules or regulations, then the holder of such a special use permit shall adhere to, and comply with, all applicable rules, regulations, standards and provisions of any state or federal agency, including, but not limited to, the FAA and the FCC. Specifically included in this requirement are any rules and regulations regarding height, lighting, security, electrical and radio frequency (RF) emission standards.
B. 
To the extent that applicable rules, regulations, standards and provisions of any state or federal agency, including but not limited to the FAA and the FCC, and specifically including any rules and regulations regarding height, lighting and security, are changed and/or are modified during the duration of a special use permit for wireless telecommunications facilities, then the holder of such a special use permit shall conform the permitted wireless telecommunications facilities to the applicable changed and/or modified rule, regulation, standard or provision within a maximum of 24 months of the effective date of the applicable changed and/or modified rule, regulation, standard or provision, or sooner as may be required by the issuing entity.
Where this chapter differs or conflicts with other laws, rules and regulations, unless the right to do so is preempted or prohibited by the county, state or federal government, the more restrictive or protective of the town and the public shall apply.
This chapter is enacted pursuant to the Municipal Home Rule Law. This chapter shall supersede the provisions of the Town Law to the extent it is inconsistent with the same, and to the extent permitted by the New York State Constitution, the Municipal Home Rule Law or any other applicable statute.