All pipes shall be sized in accordance with
proven engineering practice to handle expected flows, both present
and future.
Pipe strength shall be sufficient enough to
carry all expected loads and with a minimum loading of H-20.
Storm sewer design is subject to review and
recommendation by the Subdivision Administrator before approval.