A.
The minimum requirements of lot area and frontage for residential uses and the minimum requirements of lot area and frontage for commercial uses and the minimum requirements for yards and the maximum permissible height and land coverage for all districts and uses are summarized on Schedule I.[1] In case of conflict between the text and Schedule I, the requirements contained in the text shall control.
[1]
Editor's Note: Schedule I is included at the end of this chapter.
B.
The minimum requirements of lot area and frontage for uses in Residential Districts R-1 and R-2, as summarized on Schedule I, shall apply to subdivisions created after April 21, 1969, but not to lands where utility services have been previously installed.