No potable water well shall be located or constructed
in the Township of Bridgewater until a permit has been issued by the
Division of Health.
[Amended 9-19-2011 by Ord. No. 11-22]
The permit fee shall be $100.
All potable water wells shall be constructed
in strict compliance with state regulations as set forth and known
as "Standards for Construction of Public Noncommunity and Nonpublic
Water Systems" (N.J.A.C. 7:10-12.1 through 7:10-12.43 inclusive).
A pitless adapter or pitless unit shall be provided
on every new potable water well constructed.
No potable water well shall be placed in service
until the Division of Health has issued a written certificate of approval
to the owner of the property.