A.
All roadway work shall be performed by the applicant in accordance with the approved definitive plan and the Commonwealth of Massachusetts Standard Specifications for Highways and Bridges (SSH&B), latest edition. All streets, catch basins and appurtenances thereto shall be installed at no cost to the Town of Groton.
B.
The applicant shall provide fences, barriers, warning lights, police officers, signs and other safety features as may be necessary for the protection of the public when deemed necessary by the Board or its designated agent or other public safety official at no cost to the Town.
C.
All right-of-way lines, all drain lines and all underground municipal services shall be laid out as to line and grade by a registered professional engineer or registered professional land surveyor.
E.
The applicant shall facilitate inspection of the work by the Board or its designated agent and provide for tests of materials by independent laboratories when requested.
F.
As each construction operation is completed, approval of it must be obtained from the Board or its designated agent before work may be started on the succeeding operation, according to the schedule of inspections in § 381-15 of Part 1 of this chapter. After each satisfactory inspection, the Inspection Form P shall be signed by the Planning Board, its agent or the appropriate authority.
G.
An as-built plan showing location and grades of all sewer, water and drain lines, including sewer and water stub connections, shall also be prepared before the binder course of bituminous concrete is placed.
H.
No utility work shall be backfilled until the applicant's engineer or surveyor has obtained the necessary information to properly prepare the as-built plan and has signed the Inspection Form P as verification. The quality of utility work shall be certified by the appropriate Town departments or utility companies and evidence of same shall be submitted with the as-built plan.
I.
All utility service stubs shall be installed and capped from the main to the edge of the right-of-way for every lot with appropriate ties to enable recovery without excavation within the right-of-way.
J.
The words "applicant" and "contractor" used throughout this appendix refers to the owner of the subdivision at the time of construction.
K.
All open trenches must be backfilled or adequately covered at the end of the workday to ensure public safety.
[Added 7-5-2000]