The Village Engineer is authorized to order, in writing, the remedying of any condition or activity found to exist in, on or about any building, structure, or premises in violation of the Uniform Code, the Energy Code, or this article. An order to remedy shall be in writing; shall be dated and signed by the Village Engineer; shall specify the condition or activity that violates the Uniform Code, the Energy Code, or this article; shall specify the provision or provisions of the Uniform Code, the Energy Code, or this article which is/are violated by the specified condition or activity; shall direct the discontinuance of the illegal action or condition; and shall include a statement substantially similar to the following:
"The person or entity served with this order to remedy must completely remedy each violation described in this order to remedy by _____ [specify date], which is 30 days after the date of this order to remedy."
The order to remedy may include provisions ordering the person or entity served with such order to remedy: 1) to begin to remedy the violations described in the order to remedy immediately, or within some other specified period of time which may be less than 30 days; to continue diligently to remedy such violations until each such violation is fully remedied; and, in any event, to complete the remedying of all such violations within 30 days of the date of such order to remedy; and/or 2) to take such other protective actions (such as vacating the building or barricading the area where the violations exist) which are authorized by this article or by any other applicable statute, regulation, rule, local law or ordinance, and which the Village Engineer may deem appropriate, during the period while such violations are being remedied. The Village Engineer shall cause the order to remedy, or a copy thereof, to be served on the owner of the affected property personally or by registered mail or certified mail within five days after the date of the order to remedy. The Village Engineer shall be permitted, but not required, to cause the order to remedy, or a copy thereof, to be served on any builder, architect, tenant, contractor, subcontractor, construction superintendent, or their agents, or any other person taking part or assisting in work being performed at the affected property personally or by registered mail or certified mail within five days after the date of the order to remedy; provided, however, that failure to serve any person mentioned in this sentence shall not affect the efficacy of the compliance order. Unless the violation is abated within said period, the Village Engineer shall suspend or revoke the permit for the building operation under which the violation was committed.