[HISTORY: Adopted by the Board of Trustees of the Village
of Piermont 12-17-2013 by L.L. No. 4-2013. Amendments noted where applicable.]
GENERAL REFERENCES
Building construction — See Ch.
70.
Environmental quality review — See Ch.
96.
Soil erosion and sediment control — Se Ch.
168.
Stormwater control — See Ch.
169.
Stormwater management — See Ch.
170.
Subdivision of land — See Ch.
174.
Waterfront and waterways — See Ch.
198.