Type of Permit
|
Fee
| ||
---|---|---|---|
Building, Residential
| |||
1- or 2-family residential construction
|
$10 per $1,000, $50 mimimum
| ||
Renewable energy (PV, wind, hydro), storage
excluded
|
$0.03 per watt direct current, $50 minimum
| ||
Building, Commercial
| |||
All commercial construction
|
$10 per $1,000; $100 minimum
| ||
Suppression, fire alarm, HVAC, sheet metal and/or
mechanical
|
$10 per $1,000, $100 minimum. If permit application
is associated with active building permit, $50
| ||
Renewable energy (PV, wind, hydro), storage excluded
|
$0.03 per watt direct current, $100 minimum
| ||
Building, Miscellaneous
| |||
Demolition, residential
|
$10 per $1,000 of total construction cost, $50
minimum. Accessory structures less than 200 square feet, $25
| ||
Demolition, commercial
|
$10 per $1,000 of total construction cost, $100
minimum
| ||
Solid fuel/wood/coal stoves/fireplaces
|
$50
| ||
Tents
|
$50 residential, $100 per year nonresidential
| ||
Pools, above ground and in ground
|
$50 above ground, $100 in ground
| ||
Amusements
|
$15 per booth and/or ride, $100 minimum
| ||
Fences
|
$25
| ||
Sign structure
|
$10 per $1,000, $50 minimum
| ||
Work/jobsite trailer
|
$100 per trailer
| ||
Occupancy
| |||
Occupancy and use certificate to occupy existing
space
|
$50 when no building permit is required
| ||
Occupancy and use certificate to occupy new
space
|
Included in building permits for new buildings
| ||
Temp CO, residential
|
$50 per 30 days, maximum 90 days
| ||
Temp CO, commercial
|
$200 per 30 days, maximum 90 days
| ||
Gas, residential
| |||
New construction, 1- or 2-family
|
$150 per unit
| ||
New construction, 3+ units
|
$100 per unit
| ||
Appliance replacement or addition
|
$40 + $15 per unit after the 1st
| ||
Gas, commercial
| |||
All commercial gas work
|
$10 per $1,000, $100 minimum
| ||
Plumbing, residential
| |||
Residential, 1- or 2-family
|
$150 per unit
| ||
Residential, 3+ units
|
$100 per unit
| ||
Residential alterations (new or replacements)
|
$40 + $8 per unit after the 1st
| ||
Residential trailer water or sewer
|
$40
| ||
Plumbing, commercial
| |||
All commercial plumbing
|
$10 per $1,000, $100 minimum
| ||
Wiring, residential
| |||
New house construction, 1- or 2-family
|
$150 per unit
| ||
Service charge
|
$50 per 100 amps, + $25 per additional 100 amps
| ||
Renewable energy permit fee
|
$0.03 per watt direct current, $50 minimum
| ||
Minimum permit fee
|
$10 per $1,000 of contract cost, minimum $75
| ||
Oil or gas burner, appliances, swimming pool
|
$75 each
| ||
Wiring, commercial
| |||
New construction or addition
|
The greater of $100 or $10 per $1,000 of wiring
job cost
| ||
Carnivals
|
$250
| ||
Signs and billboards
|
$75
| ||
Temporary service
|
$100
| ||
Renewable energy (not storage)
|
$0.03 per watt direct current, $100 minimum
| ||
Institutional (maintenance permit)
|
$250 annually
| ||
Inspections
| |||
Work beginning before obtaining a permit
|
Double permit fee
| ||
Reinspection fee (all trades), each inspector
|
$50 minimum
| ||
After-hours inspection - detail
|
$400 minimum
| ||
Gas test
|
$40
| ||
Administrative related fees
| |||
Commercial plan review fee
|
$0.02 per square foot over 5,000 square feet,
1st 5,000 square feet included in base fee
| ||
Permit extension
|
$50
| ||
Permit revision with no added construction costs
|
$50
| ||
Administrative fee (replacement building card,
zoning letter, change of use letter)
|
$25
|
110 ANNUAL INSPECTIONS - Fee Schedule
| |||||
---|---|---|---|---|---|
Use Group
|
Use Group
|
Use Group Descriptions
|
Minimum Inspections
|
Maximum Certification Period
|
Fees for Maximum Certification Period
|
A-1
|
Assembly - Theaters over 400 capacity
|
With stage and scenery movie theater
|
Semiannual
|
1 year
|
$150
|
Movie theater
|
Semiannual
|
1 year
|
$150
| ||
A-1
|
Assembly - Theaters 400 or less capacity
|
With stage and scenery movie theater
|
Annual
|
1 year
|
$75
|
Movie theater
|
Annual
|
1 year
|
$75
| ||
A-2
|
Restaurants, assembly night clubs or similar uses
|
Over 400 capacity
|
Semiannual
|
1 year
|
$150
|
A-3
|
Assembly lecture halls, recreation centers, terminals, locations
of worship
|
Over 400 capacity
|
Semiannual
|
1 year
|
$125
|
400 or less capacity
|
Annual
|
1 year
|
$50
| ||
A-4
|
Assembly
|
Low density, recreation and similar uses
|
Prior to issuance of each new certificate
|
5 years
|
$40
|
A-5
|
Assembly
|
Stadiums, bleachers, places of outdoor assembly
|
Prior to issuance of each new certificate
|
1 year
|
$40+$15 per 1,000 over 5,000
|
E
|
Educational
|
Educational
|
Prior to issuance of each new certificate
|
1 year
|
$50
|
E
|
Day care
|
Child day-care centers
|
Prior to issuance of each new certificate
|
1 year
|
$50
|
I-1
|
Group home
|
Prior to issuance of each new certificate
|
1 year
|
$50
| |
I-2
|
Residents incapable of self-preservation: hospitals, nursing
homes, mental hospitals, certain day-care facilities
|
Prior to issuance of each new certificate
|
2 years
|
$75 per 100 beds, +$2 per 10 beds over 100
| |
I-3
|
Residents restrained: prisons, jails, detention centers, etc.
|
Prior to issuance of each new certificate
|
2 years
|
$75 per 100 beds, +$2 per 10 beds over 100
| |
I-4
|
Adult and/or child day-care facilities
|
Prior to issuance of each new certificate
|
1 year
|
$50
| |
R-1
|
Hotels, motels, boardinghouses, etc.
|
Prior to issuance of each new certificate
|
1 year
|
$40 per 10 rooms, +$1 per room over 10 rooms, minimum $100
| |
R-1
|
Detoxification facilities
|
Prior to issuance of each new certificate
|
2 years
|
$75
| |
R-2
|
Multifamily
|
Prior to issuance of each new certificate
|
5 years
|
$75 per 3 dwelling units, +$2 per dwelling after 3
| |
R-2
|
Dormitories and R-2 congregate living
|
Prior to issuance of each new certificate
|
1 year
|
$40 per 10 rooms, +$1 per room over 10 rooms, minimum $100
| |
R-2
|
Summer camps for children
|
Annual
|
1 year
|
$15 per 100 beds, +$8 per 100 beds after the first 100 beds,
+$15 for each assembly building
| |
R-3
|
Residential care facilities licensed by DDS or DMH
|
Annual
|
1 year
|
$75 per 100 beds, +$2 per 10 beds over 100
| |
R-4
|
Residential care/assisted living facilities (< 16 persons)
|
Annual
|
1 year
|
$75 per 100 beds, +$2 per 10 beds over 100
| |
R-5
|
Residential special occupancy
|
Limited group residence
|
Annual
|
1 year
|
$75 per 100 beds, +$2 per 10 beds over 100
|
Any
|
Facilities licensed by the Alcohol Beverage Control Commission
where alcoholic beverages are served and consumed
|
Annual as per MGL c. 10, § 74
|
1 year as per MGL c. 10, § 74
|
$75
| |
Any
|
House museums (as recognized by Massachusetts Historical Commission)
|
Annual
|
1 year
|
$50
| |
Any
|
Fire escapes, etc., per 780 CMR 10.00: Means of Egress
|
5 years
|
5 years
|
$50
|