[Amended 3-11-2025 by L.L. No. 9-2025]
A.
Whenever the Town Board adopts an order or orders directing the abutting owners of the respective lots or parcels of land in front of which it is desired that sidewalks or curbs be built, relaid or repaired to construct the same in accordance with this chapter, the Town Board shall specify the place, manner and time within which such construction or repair shall be done, which time shall not be less than 48 hours.
B.
The Town Clerk shall publish a notice thereof in a paper to be designated by the Town Board at least twice, the first publication of which shall be at least 15 days before the time specified before the completion of the work and he shall serve a copy of such notice by certified or registered mail upon the owner or owners, occupant or occupants of the land in front of which it is desired that such construction or repair shall be done.