It is the purpose of these specifications to
establish minimum acceptable standards and methods for road design
and construction, including widths, development of right-of-way, paved
roadway, storm drainage and other utilities in the Town of Bethel.
Dedication of the right-of-way shall not be
accepted until the applicant's licensed professional engineer and
the Town representative shall have certified to the Town Board that
the development of the roads has been completed in accordance with
the approved plans, which shall conform to the following specifications.
The applicant will not be allowed to take advantage
of any error or omission in the specifications of drawings as full
instructions will always be given if such error or omission is discovered.
Further, the applicant shall, immediately upon his discovery of any
statement or detail which is discrepant or which otherwise appears
to be in error, bring the same to the attention of the Town representative
for decision or correction.
The invalidity of any provision of these specifications
shall not invalidate any other part.
Approval of any application by the Town representative
shall not be deemed an acceptance of said dedication by the Town Board
of the Town of Bethel.