A.
No opening in any street or sidewalk shall be made before first obtaining a street-opening permit from the Road Commissioner or Road Foreman. All permits will be issued in accordance with the provisions of Maine Revised Statutes Annotated, Title 23. Sections 2701 through 3707. In the case of an emergency situation involving a utility, the utility may excavate without an opening permit. However, the utility shall be responsible for obtaining an opening permit as soon as possible after the emergency and, in any case, before the excavation is permanently backfilled.
B.
Winter permits. No street-opening permit will be issued between December 1 in any one year and March 15 of the following year except for an extreme emergency, as determined by the Road Commissioner or Road Foreman.