Regulator
|
1-Family Detached
|
1-Family Attached
|
Duplex
|
Town-
house
|
Multi-
family
|
Other Permitted Uses
| |
---|---|---|---|---|---|---|---|
Site area per housing unit (square feet)
|
6,000
|
6,000
|
3,000
|
5,000**
|
3,000 for first 4 units, 1,500 for each additional
unit
|
NA
| |
Minimum lot area (square feet)
| |||||||
In conventional development
|
6,000
|
6,000
|
10,000
|
5,000
|
10,000
|
5,000
| |
In conservation development
|
4,000
|
4,000
|
8,000
|
4,000
|
10,000
|
5,000
| |
Minimum lot width (feet)
|
50
|
50
|
60
|
30***
|
60
|
50
| |
Minimum yards (feet) (Note 1)
| |||||||
Front yard
|
25
|
25
|
25
|
25
|
25
|
20
| |
Interior side yard
|
10
|
10
|
10
|
10
|
10
|
10
| |
Street side yard*
|
15
|
15
|
15
|
15
|
15
|
20
| |
Rear yard
|
20
|
20
|
20
|
20
|
20
|
20
| |
Maximum height (feet)
|
40
|
40
|
40
|
40
|
50
|
50
| |
Maximum building coverage
|
50%
|
50%
|
50%
|
50%
|
50%
|
50%
| |
Maximum impervious coverage
|
60%
|
60%
|
60%
|
60%
|
60%
|
70%
| |
Maximum amount of total parking located in street
yard
|
NA
|
NA
|
NA
|
NA
|
25%
|
50%
| |
Project size requiring large project special
use permit (Note 2)
|
NA
|
NA
|
NA
|
>=10 acres or 200units
|
>=10 acres or 200 units
|
>=20 acres or building area of 100,000 square
feet
| |
Minimum depth of landscaping adjacent to street
right-of-way line (feet)
|
15
|
15
|
15
|
15
|
15
|
15
|
NOTES:
|
* Corner lots bordered by two arterial streets
shall maintain full front yard setbacks on both arterials.
|
** The minimum site area per housing unit for
attached units is 3,000 square feet.
|
*** The minimum lot width for any townhouse
lot sold individually is 25 feet.
|
Note 1: Flexible yard setbacks in planned unit
development districts. The Planning Commission and City Council may
vary required minimum setbacks in planned unit development districts.
Along arterials designated in the City's Comprehensive Development
Plan, the Public Works Director may require a deeper front yard setback.
|
Note 2: Large project special use permit. The large project special use permit requirement applies to projects of sufficient size or scale to require public comment and individual review by the Planning Commission and City Council. All projects that meet or exceed the large project special use permit size threshold shall require approval of a special use permit, following the procedures set forth in § 205-302 of this chapter, unless they are located within and included within the development plans of an MU or PUD District.
|