[Amended 10-5-1998; 7-17-2000]
This section applies to existing developments where the developer is no longer financially responsible for improvements. Sections
66.615 and
66.616 of the Wisconsin Statutes, the Village of Cottage Grove Subdivision and Land Division Ordinance and the Village of Cottage Grove Zoning Ordinance shall apply.
A. Sidewalks and curb ramps. Assessments will be determined by taking the front footage times the width, times the square foot cost.
[Amended 5-9-2007 by Ord. No. 06-2007; 8-15-2022 by Ord. No. 05-2022]
(1) The Public Works Director, foreman, designated Village staff and/or Village Engineer, following the Sidewalk Policy, will determine which sidewalks will be added, repaired and/or replaced staying within the budget.
(2) In the case of new sidewalks and curb ramps the cost shall be borne 100% by the Village.
(3) In the case of replacement or repair to existing sidewalks or curb ramps the cost shall be borne 100% by the Village. Allowable repairs, at the discretion of the Public Works Director or his or her designee, include:
(4) In the case where the property owner replaces, repairs or puts in new sidewalk, the property owner shall pay 100% of the cost and shall follow the Village sidewalk specifications and sign an agreement to repair sidewalks.
B. Curb and gutter. In the case of new curb and gutter the cost shall be borne 100% by the abutting property owner. In the case of replacement or repair to existing curb and gutter the cost shall be borne at 50% to the abutting property owner and 50% to the Village. Assessments will be determined by taking the front footage times the cost per foot.
C. Driveway approaches. Driveway approaches in all districts being constructed or reconstructed must meet the grade and construction requirements set forth by the Village Engineer.
(1) New construction and reconstruction of drive approaches will be paid 100% by the property owner. If the Village requires replacement due to a street or curb grade change of six inches or more, the Village will pay 100% of the cost.
(2) The work will be done totally by the contractor awarded the contract by the Village if the drive approach is being constructed along with roadwork initiated by the Village.
(3) The property owner can contract the work as long as the Village does not have plans for street repairs that would affect the drive approach.
(4) When work is to be done on a drive approach and it involves the sidewalk area of the approach, the property owner is responsible for 100% of the sidewalk work abutting the approach.
D. Street construction, reconstruction and repair. The cost for street reconstruction or repair shall be borne by the Village.