As used in this article, the following terms shall have the meanings indicated:
Includes all primary and secondary voltage wire or cable and its supports, trenches, connection equipment and enclosures, and control equipment which is used to extend the distribution system from existing facilities to a point of connection with the service facilities. The cost of right-of-way preparation and restoration to the original condition, where appropriate, shall be included in the cost of distribution facilities.
The overhead service between the last pole or other aerial support of the distribution system and the point of attachment to the customer's service entrance equipment. It is normally located on the customer's property.
The meter socket and related overhead masthead or conduit for underground service. This equipment is provided by the customer and is generally located on or in the customer's building.
The standard transformer, standard service drop or standard service lateral and standard meter.
Consists of a lateral and necessary distribution line, if any. In no case shall it consist of separate segments of underground construction separated by overhead construction. The length of each underground service extension shall be the length of the cable route from the beginning of the trench to the point of termination on the applicant's premises.
The underground service between the distribution system, including any risers at the pole or other structure, and the service entrance equipment. It is normally located on the customer's property.