A.
General. The subdivider shall pay the Village of New Glarus all fees as hereinafter required and at the times specified before being entitled to recording of a plat or certified survey map.
B.
Engineering fee. The subdivider shall pay a fee equal to the actual cost to the Village for all engineering work incurred by the Village in connection with the plat or certified survey map, including inspections required by the Village pursuant to § 265-23C. The subdivider shall pay a fee equal to the actual cost to the Village for such engineering work and inspection as the Village Board and/or Village Engineer deems necessary to assure that the construction of the required improvements is in compliance with the plans, specifications and ordinances of the Village or any other governmental authority. Engineering work shall include the preparation of construction plans, standard specifications and administration of the engineering work.
C.
Administrative and other fees. The subdivider shall pay a fee to the Village equal to the cost of any legal, administrative, planning, or fiscal work which may be undertaken by the Village in connection with the plat or certified survey map.
[Amended 3-3-2020 by Ord. No. 20-02]
D.
Preliminary plat.
(1)
A subdivider who submits a preliminary plat for the Village Plan Commission and the Village Board shall file said preliminary plat with the Village Clerk-Treasurer and shall deposit with the Village Clerk-Treasurer a fee to cover the costs of reviewing said application. The fee for a preliminary plat shall be as set by the Village Board. If the plat is rejected, no part of the fee shall be returned to the petitioner.
(2)
A reapplication fee as set by the Village Board shall be paid to the Village Clerk-Treasurer at the time of reapplication for approval or amendment of any preliminary plat which has previously been reviewed.
E.
Final plat review fee.
(1)
The subdivider shall pay a fee as set by the Village Board at the time of first application for final plat approval of said plat to assist in defraying the cost of review.
(2)
A reapplication fee as set by the Village Board shall be paid to the Village Clerk-Treasurer at the time of a reapplication for approval or amendment of any final plat which has previously been reviewed.
F.
Certified survey. The subdivider shall pay an application fee as set by the Village Board for each certified survey.
G.
Public site fee. If the subdivision does not contain lands to be dedicated as required in this chapter, the Village Clerk-Treasurer shall require a fee pursuant to § 265-48 for the acquisition and development of public sites to serve the future inhabitants of the proposed subdivision.
H.
Assessments. All outstanding assessments due to the Village shall be due prior to the signing of the final plat or certified survey by the Village.