The subdivider shall pay the Village all fees
to the Village Treasurer as hereinafter required and at the times
specified before being entitled to recording of a plat or certified
survey map.
[Amended 6-24-2014 by Ord. No. 748]
The subdivider shall pay a fee in an amount as set by resolution
of the Village Board to the Village Treasurer at the time of first
application for approval of any preliminary plats or certified survey
maps to assist in defraying the cost of review. A reapplication fee
in an amount as set by resolution of the Village Board shall be paid
to the Village Treasurer at the time of reapplication for approval
of any preliminary plat which has previously been reviewed.
The subdivider shall pay a fee or present a
bond, certified check or irrevocable letter of credit equal to 1%
of the cost of the required public improvements as estimated by the
Village Engineer at the time of the submission of improvement plans
and specifications. The fee may be recomputed, upon demand of the
subdivider or Village Engineer, after completion of improved construction
in accordance with the actual cost of such improvements and the difference,
if any, shall be paid by or remitted to the subdivider. Evidence of
cost shall be in such detail and form as required by the Village Engineer.
The subdivider shall pay a fee to the Village
Treasurer equal to the actual cost to the Village for such inspections
as the Village Engineer deems necessary to assure that the construction
of the required improvements is in compliance with the plans, specifications
and ordinances of the Village or any other governmental authority.
[Amended 6-24-2014 by Ord. No. 748]
The subdivider shall pay a fee in an amount as set by resolution
of the Village Board to the Village Treasurer at the time of submittal
of the final plat to assist in defraying the cost of review. A reapplication
fee in an amount as set by resolution of the Village Board shall be
paid to the Village Treasurer at the time of reapplication for approval
of any final plat which has previously been reviewed.
The subdivider shall pay to the Village Treasurer
a fee equal to the actual cost to the Village for all engineering
work incurred by the Village in connection with the plat. In addition:
A. Engineering work shall include the preparation of
construction plans and standard specifications. The Village Engineer
may permit the subdivider to furnish all, some or part of the required
construction plans and specifications, in which case no engineering
fees shall be levied for such plans and specifications.
B. Inspection, checking and reviewing work has fees provided for in §§
176-79 and
176-80.
The subdivider shall pay a fee equal to the
cost of any legal, administrative or fiscal work which may be undertaken
by the Village in connection with the plat or certified survey map.
Legal work shall include the drafting of contracts between the Village
and the subdivider. These fees may also include the cost of obtaining
professional opinions including, but not limited to attorneys, engineers,
landscape architects and land planners, requested by the Village Board
or Plan Commission in connection with the land division being considered.
[Amended 6-24-2014 by Ord. No. 748]
The subdivider shall pay a fee in an amount as set by resolution
of the Village Board to assist in defraying the cost of review. The
fee shall be paid to the Village Treasurer at the time of submittal
of the preliminary plat.
All review fees required by objecting agencies,
including the Wisconsin Department of Adminstration, Department of
Transportation, Department of Commerce and the Department of Natural
Resources, shall be paid by the subdivider to the proper reviewing
agency at the time of application.