A person making application after the effective date of this chapter for subdivision or project plan approval, a grading permit, other than needed for landscaping or to correct drainage or slope problems or a sediment control permit for an area of land of 40,000 square feet or greater, shall:
A.
B.
Comply with the following when cutting into forest cover that is currently below the afforestation percentages described in Subsection (A)(1) and (2) of this section:
(1)
The required afforestation level shall be determined by the amount of forest existing before cutting or clearing begins; and
(2)
Forest cut or cleared below the required afforestation level shall be reforested or afforested at a two-to-one ratio and added to the amount of afforestation necessary to reach the minimum required afforestation level, as determined by the amount of forest existing before cutting or clearing began.