There is imposed upon every connection to the Town's water and sanitary sewer systems a water capacity allocation charge and a sewer capacity allocation charge. The amounts of these charges are set forth in this section.
B.
The water capacity allocation charge is based upon the size of the water line that is to be connected to the Town water system as follows:
Line Size (inches) | Charge | |
|---|---|---|
5/8 or 3/4 | $956.25, plus $573.75 per EDU | |
1 or less | $1,415.25, plus $573.75 per EDU | |
2 or less | $2,792.25, plus $573.75 per EDU | |
3 or less | $4,092.75, plus $573.75 per EDU | |
4 or less | $5,622.75, plus $573.75 per EDU | |
6 or less | $9,830.25, plus $573.75 per EDU | |
8 or less | $12,890.25, plus $573.75 per EDU | |
10 or less | $14,764.50, plus $573.75 per EDU |
C.
The sewer capacity allocation charge is $650.25 plus $1,032.75 per EDU for a standard six-inch diameter service line connection or smaller. The amount of sewer capacity allocation charge for a service line connection of greater than six inches shall be determined on a case-by-case basis by ordinance of the Town Council after taking into consideration the amount of sewage anticipated to flow through the connection.
D.
The water capacity allocation charge and sewer capacity allocation charge are payable concurrently with and as a condition precedent to the issuance of an occupancy permit for any improvement that is to be connected to the Town's water or sanitary sewer systems.