home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Town of Kingston, NY
chevron_right
2021-04-21
info
chevron_right
Index: S
Filter By Letter
#
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
S
add
Safety standards
§ 40-2 — Objectives.
§ 40-4 — Prudence.
§ 77-6 — Circumstances where alternate quotes or lowest bid not required.
§ 115-7 — Prohibited acts.
§ 115-16 — Purpose.
§ 115-25 — Humane treatment.
§ 115-26 — Sanitary conditions.
§ 134-1 — Purpose.
§ 134-3 — Restrictions.
§ 134-4 — Permit.
§ 149-7 — Certificates of occupancy/certificates of compliance.
§ 149-10 — Operating permits.
§ 186-2 — Purpose.
186-4B{38} — SUBSTANTIAL IMPROVEMENT
§ 186-7 — Interpretation and conflict with other laws.
§ 186-19 — Appeals board.
§ 186-20 — Conditions for variances.
§ 245-3 — Purpose.
§ 245-5 — Extractive operation, limitations.
§ 254-1 — Purpose.
§ 254-6 — Owner responsibility.
§ 254-11 — Purpose.
§ 280-1 — Purpose.
§ 301-5 — Inspection requirements.
§ 309-1 — Purpose; intent.
309-3{5} — HAZARDOUS MATERIALS
§ 309-18 — Violations deemed public nuisance.
§ 329-1 — Findings of fact.
§ 329-2 — Purpose.
§ 329-3 — Statutory authority.
§ 329-10 — Construction inspection.
§ 350-1 — Waivers.
§ 350-13 — Streets.
§ 350-16 — Reservations and easements.
§ 350-18 — Preliminary plat.
§ 425-3 — Purpose and scope.
§ 425-15 — Standards of site plan review.
§ 425-20 — General special use permit standards.
§ 425-21 — Additional standards for specific uses.
§ 425-26 — Home occupations.
§ 425-34 — Adult uses.
§ 425-39 — Temporary or transient commercial use.
§ 425-42.1 — Natural gas exploration and extraction.
§ 425-43 — Purpose.
§ 425-47 — Administrative review of applications for shared use of existing towers.
§ 425-49 — Standards for placement.
§ 425-52 — New telecommunications tower design.
§ 425-63 — Powers and duties of Code Enforcement Officer.
§ 425-68 — Powers and duties.
§ 425-76 — Construal of provisions.
§ 425-78 — Periodic review required.
425-81{106} — PUBLIC UTILITY STRUCTURE
§ 425-89 — Authority.
§ 425-90 — Statement of purpose.
§ 425-94 — Large-scale solar systems as special use.
add
Salaries and compensation
§ 1-4 — Enactments saved from repeal; matters not affected.
§ 28-19 — Board of Ethics.
add
Sales
§ 1-4 — Enactments saved from repeal; matters not affected.
§ 1-9 — Sale of Code book; supplementation.
§ 115-10 — Redemption of seized dogs.
186-4B{21} — FUNCTIONALLY DEPENDENT USE
186-4B{27} — MANUFACTURED HOME PARK OR SUBDIVISION
§ 217-3 — License required.
245-2{1} — MINE
245-2{2} — MINERAL
245-2{3} — MINING OPERATION or OPERATION(S)
245-2{5} — OWNER
§ 254-17 — Exceptions.
§ 280-4 — License applications.
§ 280-6 — Restrictions.
§ 298-4 — Protection of personal privacy.
329-6{1} — AGRICULTURAL ACTIVITY
329-6{14} — LAND DEVELOPMENT ACTIVITY
§ 350-4 — General Procedure.
§ 392-12 — Disposition of unlicensed vehicles.
Ch 425 — Zoning
§ 425-26 — Home occupations.
§ 425-28 — Signs.
§ 425-35 — Yard sales.
425-81{5} — ACTIVE AUTO RECYCLING FACILITY
425-81{6} — ADULT USE
425-81{7} — AGRICULTURAL USE
425-81{10} — AUTOMOTIVE/SALES AND SERVICE
425-81{33} — CONVENIENCE STORE
425-81{44} — FARMSTAND
425-81{45} — FAST-FOOD RESTAURANT
425-81{56} — GASOLINE STATION
425-81{67} — JUNKYARD
425-81{68} — KENNEL
425-81{78} — MACHINERY SALES
425-81{80} — MINING/QUARRYING
425-81{110} — RETAIL STORE
425-81{131} — TRANSIENT OR TEMPORARY COMMERCIAL USE
425-91{3} — LARGE-SCALE SOLAR ENERGY SYSTEM
add
Sanitary facilities
186-4B{19} — FLOODPROOFING
§ 186-17 — Nonresidential structures.
§ 217-6 — General regulations.
425-81{40} — DWELLING UNIT
add
Sanitation
§ 254-4 — Permit application and renewal.
add
Schools
§ 28-1 — Statutory authority.
Ch 40 — Investment Policy
§ 40-10 — Permitted investments.
§ 280-6 — Restrictions.
§ 350-16 — Reservations and easements.
§ 350-17 — Sketch plan.
§ 350-19 — Final plat.
§ 363-1 — Direct payment elected.
Ch 425 — Zoning
§ 425-24 — Parking.
§ 425-34 — Adult uses.
425-81{113} — SCHOOL
425-81{117} — SIGN
add
Screens and screening
§ 186-15 — Standards for all structures.
§ 245-5 — Extractive operation, limitations.
§ 254-7 — Mobile home park requirements.
§ 254-13 — Mobile home requirements.
§ 425-13 — Procedure.
§ 425-15 — Standards of site plan review.
§ 425-21 — Additional standards for specific uses.
§ 425-24 — Parking.
425-81{46} — FENCE
425-81{80} — MINING/QUARRYING
§ 425-94 — Large-scale solar systems as special use.
add
Security standards
§ 28-5 — Prohibition on use of municipal position for personal or private gain.
Ch 40 — Investment Policy
§ 40-8 — Collateralizing of deposits.
§ 40-9 — Safekeeping and collateralization.
§ 40-11 — Authorized financial institutions and dealers.
§ 40-12 — Purchase of investments.
§ 40-13 — Repurchase agreements.
83-6{3} — RECORDS CENTER
115-2{3} — CONFINED
§ 115-16 — Purpose.
115-17{8} — WORKING ANIMAL
§ 115-18 — Animal control.
§ 162-7 — Travel way surface.
§ 186-18 — Manufactured homes and recreational vehicles.
§ 217-4 — Application for license.
§ 217-6 — General regulations.
§ 309-11 — Applicability; access to facilities; monitoring of discharges.
Ch 329 — Stormwater Management
§ 329-11 — Performance guarantee.
§ 425-13 — Procedure.
§ 425-29 — Pools.
§ 425-49 — Standards for placement.
§ 425-87 — Removal of obsolete commercial wind turbine facilities.
add
Seizure
§ 115-8 — Enforcement.
§ 115-10 — Redemption of seized dogs.
§ 115-19 — Enforcement.
add
Septic systems
§ 149-4 — Building permits.
add
Septic tanks
§ 162-14 — Hazards.
§ 217-6 — General regulations.
add
Service dogs
§ 115-7 — Prohibited acts.
§ 115-15 — Exemption from licensing fees.
add
Setbacks
Ch 425 — Zoning
§ 425-47 — Administrative review of applications for shared use of existing towers.
§ 425-50 — Setbacks.
§ 425-60 — Continuance and restoration.
§ 425-63 — Powers and duties of Code Enforcement Officer.
§ 425-68 — Powers and duties.
425-81{16} — BUILDABLE AREA
425-81{115} — SETBACK
425-81{144} — ZONING DISTRICT
§ 425-84 — Special permit criteria.
§ 425-93 — Solar as accessory use or structure.
§ 425-94 — Large-scale solar systems as special use.
add
Sheds
§ 149-4 — Building permits.
186-4B{35} — START OF CONSTRUCTION
Ch 425 — Zoning
425-81{3} — ACCESSORY STRUCTURE
425-81{124} — STORAGE SHED
425-81{127} — STRUCTURE
add
Shopping centers
Ch 425 — Zoning
§ 425-24 — Parking.
425-81{116} — SHOPPING CENTER
add
Shrubs
§ 162-5 — Driveways.
§ 425-20 — General special use permit standards.
425-81{90} — NURSERY
add
Signs
§ 149-4 — Building permits.
§ 149-6 — Stop-work orders.
§ 149-15 — Enforcement; penalties for offenses.
§ 160-4 — Additional permits and renewals; excavations to be guarded.
§ 162-14 — Hazards.
§ 301-4 — Registry form and filing.
§ 329-5 — Exemptions.
§ 329-7 — Stormwater pollution prevention plans.
§ 337-14 — Dedication of road.
§ 350-4 — General Procedure.
§ 350-8 — Final plat.
§ 350-9 — Required improvements and procedure.
§ 350-10 — Filing of approved final plat.
§ 350-16 — Reservations and easements.
§ 350-18 — Preliminary plat.
§ 350-19 — Final plat.
§ 425-13 — Procedure.
§ 425-26 — Home occupations.
§ 425-28 — Signs.
§ 425-52 — New telecommunications tower design.
§ 425-73 — Initiation.
§ 425-75 — Town Board procedure.
425-81{85} — MONUMENT-STYLE SIGNS
425-81{117} — SIGN
425-81{118} — SIGN, SURFACE AREA OF
425-81{127} — STRUCTURE
§ 425-94 — Large-scale solar systems as special use.
add
Single-family dwellings
§ 149-4 — Building permits.
Ch 425 — Zoning
425-81{38} — DWELLING, SINGLE-FAMILY
425-81{82} — MOBILE HOME
425-81{84} — MODULAR OR MANUFACTURED HOME
add
Site plan approval
§ 425-12 — Applicability.
§ 425-13 — Procedure.
§ 425-17 — Procedure.
§ 425-38 — Clear-cutting and grading.
§ 425-48 — Site plan review.
§ 425-63 — Powers and duties of Code Enforcement Officer.
§ 425-88 — Site plan and special permit procedure/submittal requirements.
§ 425-93 — Solar as accessory use or structure.
§ 425-94 — Large-scale solar systems as special use.
add
Site plan review
Ch 425 — Zoning
§ 425-9 — Application of regulations.
Ch 425 Art IV — Site Plan Review
§ 425-11 — Purpose.
§ 425-12 — Applicability.
§ 425-13 — Procedure.
§ 425-15 — Standards of site plan review.
§ 425-17 — Procedure.
§ 425-21 — Additional standards for specific uses.
§ 425-24 — Parking.
§ 425-33 — MU-1 District design guidelines.
§ 425-47 — Administrative review of applications for shared use of existing towers.
§ 425-48 — Site plan review.
§ 425-49 — Standards for placement.
§ 425-60 — Continuance and restoration.
§ 425-63 — Powers and duties of Code Enforcement Officer.
§ 425-64 — Powers and duties of Planning Board.
425-81{120} — SITE PLAN REVIEW
§ 425-84 — Special permit criteria.
§ 425-93 — Solar as accessory use or structure.
§ 425-94 — Large-scale solar systems as special use.
add
Site plan review and approval
§ 425-13 — Procedure.
add
Site plans
§ 149-4 — Building permits.
§ 162-17 — Permits.
§ 162-19 — As-built drawings.
Ch 425 — Zoning
§ 425-9 — Application of regulations.
Ch 425 Art IV — Site Plan Review
§ 425-11 — Purpose.
§ 425-12 — Applicability.
§ 425-13 — Procedure.
§ 425-15 — Standards of site plan review.
§ 425-17 — Procedure.
§ 425-21 — Additional standards for specific uses.
§ 425-24 — Parking.
§ 425-28 — Signs.
§ 425-33 — MU-1 District design guidelines.
§ 425-38 — Clear-cutting and grading.
§ 425-44 — Enabling authority.
§ 425-47 — Administrative review of applications for shared use of existing towers.
§ 425-48 — Site plan review.
§ 425-49 — Standards for placement.
§ 425-54 — Authority to impose conditions.
§ 425-60 — Continuance and restoration.
§ 425-63 — Powers and duties of Code Enforcement Officer.
§ 425-64 — Powers and duties of Planning Board.
§ 425-77 — Existing violations.
425-81{119} — SITE PLAN
425-81{120} — SITE PLAN REVIEW
§ 425-84 — Special permit criteria.
§ 425-88 — Site plan and special permit procedure/submittal requirements.
§ 425-93 — Solar as accessory use or structure.
§ 425-94 — Large-scale solar systems as special use.
add
Sketch plans
Ch 350 — Subdivision of Land
§ 350-4 — General Procedure.
§ 350-6 — Sketch plan.
§ 350-17 — Sketch plan.
§ 350-18 — Preliminary plat.
add
Smoke
§ 425-26 — Home occupations.
add
Smoking
§ 425-26 — Home occupations.
add
Snow and ice removal
§ 350-13 — Streets.
§ 392-14 — Removal of vehicles during snow removal operations.
add
Soil erosion and sediment control
§ 245-5 — Extractive operation, limitations.
§ 329-1 — Findings of fact.
§ 329-2 — Purpose.
§ 425-51 — Access and parking.
add
Solar collectors
425-81{3} — ACCESSORY STRUCTURE
§ 425-94 — Large-scale solar systems as special use.
add
Solar energy systems
Ch 425 Art XV — Solar Energy Systems
§ 425-89 — Authority.
§ 425-90 — Statement of purpose.
425-91{2} — GROUND-MOUNTED SOLAR ENERGY SYSTEM
425-91{3} — LARGE-SCALE SOLAR ENERGY SYSTEM
425-91{4} — ROOF-MOUNTED SOLAR ENERGY SYSTEM
425-91{6} — SOLAR ENERGY SYSTEM
§ 425-92 — Applicability.
§ 425-93 — Solar as accessory use or structure.
§ 425-94 — Large-scale solar systems as special use.
add
Special permits
Ch 425 — Zoning
§ 425-17 — Procedure.
§ 425-21 — Additional standards for specific uses.
§ 425-22 — Special permit renewal.
§ 425-24 — Parking.
§ 425-26 — Home occupations.
§ 425-83 — Permitted and prohibited uses.
§ 425-84 — Special permit criteria.
§ 425-88 — Site plan and special permit procedure/submittal requirements.
§ 425-94 — Large-scale solar systems as special use.
add
Special permit uses
Ch 425 — Zoning
§ 425-21 — Additional standards for specific uses.
add
Special use permits
§ 115-27 — Special use permit.
§ 425-9 — Application of regulations.
Ch 425 Art V — Special Use Permits
§ 425-16 — Purpose.
§ 425-17 — Procedure.
§ 425-18 — Reimbursable costs.
§ 425-19 — Time limit.
§ 425-20 — General special use permit standards.
§ 425-21 — Additional standards for specific uses.
§ 425-22 — Special permit renewal.
§ 425-26 — Home occupations.
§ 425-28 — Signs.
§ 425-33 — MU-1 District design guidelines.
§ 425-63 — Powers and duties of Code Enforcement Officer.
§ 425-77 — Existing violations.
§ 425-84 — Special permit criteria.
§ 425-93 — Solar as accessory use or structure.
§ 425-94 — Large-scale solar systems as special use.
add
Special uses
§ 115-27 — Special use permit.
§ 425-9 — Application of regulations.
§ 425-12 — Applicability.
Ch 425 Art V — Special Use Permits
§ 425-16 — Purpose.
§ 425-17 — Procedure.
§ 425-18 — Reimbursable costs.
§ 425-19 — Time limit.
§ 425-20 — General special use permit standards.
§ 425-21 — Additional standards for specific uses.
§ 425-22 — Special permit renewal.
§ 425-26 — Home occupations.
§ 425-28 — Signs.
§ 425-33 — MU-1 District design guidelines.
§ 425-63 — Powers and duties of Code Enforcement Officer.
§ 425-77 — Existing violations.
425-81{121} — SPECIAL USE
§ 425-84 — Special permit criteria.
§ 425-93 — Solar as accessory use or structure.
§ 425-94 — Large-scale solar systems as special use.
add
Sprinklers
§ 149-7 — Certificates of occupancy/certificates of compliance.
add
Sprinkler systems
§ 149-7 — Certificates of occupancy/certificates of compliance.
add
Steep slopes
§ 350-16 — Reservations and easements.
§ 350-19 — Final plat.
§ 425-13 — Procedure.
add
Stop work orders
149-2{11} — STOP-WORK ORDER
§ 149-3 — Code Enforcement Officer; inspectors.
§ 149-6 — Stop-work orders.
§ 149-12 — Complaints.
§ 149-13 — Recordkeeping.
§ 149-15 — Enforcement; penalties for offenses.
§ 186-13 — Powers and duties of local administrator.
329-6{27} — STOP-WORK ORDER
§ 329-12 — Enforcement; penalties for offenses.
§ 425-63 — Powers and duties of Code Enforcement Officer.
add
Storage
§ 83-1 — Program established; designation of Records Management Officer.
§ 83-2 — Powers and duties of Officer.
83-6{3} — RECORDS CENTER
83-6{4} — RECORDS DISPOSITION
83-6{5} — RECORDS MANAGEMENT
§ 115-26 — Sanitary conditions.
§ 149-4 — Building permits.
186-4B{9} — DEVELOPMENT
186-4B{21} — FUNCTIONALLY DEPENDENT USE
186-4B{25} — LOWEST FLOOR
186-4B{36} — STRUCTURE
§ 186-11 — Purpose of floodplain development permit; fees.
§ 186-15 — Standards for all structures.
§ 217-1 — Legislative intent.
§ 217-3 — License required.
§ 254-6 — Owner responsibility.
§ 254-17 — Exceptions.
309-3{1} — BEST MANAGEMENT PRACTICES (BMPs)
§ 329-7 — Stormwater pollution prevention plans.
§ 392-10 — Disposition of vehicles.
Ch 425 — Zoning
§ 425-15 — Standards of site plan review.
§ 425-21 — Additional standards for specific uses.
§ 425-26 — Home occupations.
§ 425-42.1 — Natural gas exploration and extraction.
425-42.1B{8} — NATURAL GAS EXTRACTION, EXPLORATION OR PRODUCTION WASTES DISPOSAL/STORAGE FACILITY
425-42.1B{11} — NATURAL GAS SUPPORT ACTIVITIES
425-42.1B{15} — UNDERGROUND NATURAL GAS STORAGE
425-81{32} — CONTRACTOR'S EQUIPMENT STORAGE
425-81{41} — EXPENDABLE CONTRACTORS' EQUIPMENT
425-81{55} — GARAGE
425-81{67} — JUNKYARD
425-81{114} — SELF-STORAGE FACILITY
425-81{124} — STORAGE SHED
425-81{127} — STRUCTURE
425-81{138} — WAREHOUSE
425-91{5} — SOLAR ENERGY EQUIPMENT
add
Stormwater
Ch 162 — Driveways
Ch 186 — Flood Damage Prevention
Ch 309 — Sewers
§ 309-2 — Objectives.
309-3{1} — BEST MANAGEMENT PRACTICES (BMPs)
309-3{3} — CONSTRUCTION ACTIVITY
309-3{11} — MUNICIPAL SEPARATE STORM SEWER SYSTEM
309-3{12} — NONSTORMWATER DISCHARGE
309-3{16} — SPECIAL CONDITIONS
309-3{17} — STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (SPDES) STORMWATER DISCHARGE PERMIT
309-3{18} — STORMWATER
309-3{19} — STORMWATER MANAGEMENT OFFICER (SMO)
309-3{23} — WASTEWATER
§ 309-5 — Responsibility for administration.
§ 309-6 — Discharge prohibitions; exceptions.
§ 309-8 — Use of best management practices.
§ 309-10 — Industrial or construction activity discharges.
§ 309-11 — Applicability; access to facilities; monitoring of discharges.
§ 309-13 — Enforcement; penalties for offenses.
Ch 329 — Stormwater Management
§ 329-1 — Findings of fact.
§ 329-2 — Purpose.
§ 329-4 — Applicability.
§ 329-5 — Exemptions.
Ch 329 Art II — Stormwater Control
329-6{7} — DESIGN MANUAL
329-6{11} — INDUSTRIAL STORMWATER PERMIT
329-6{12} — INFILTRATION
329-6{16} — MAINTENANCE AGREEMENT
329-6{25} — SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM MUNICIPAL SEPARATE STORMWATER SEWER SYSTEMS GP-02-02
329-6{28} — STORMWATER
329-6{29} — STORMWATER HOTSPOT
329-6{30} — STORMWATER MANAGEMENT
329-6{31} — STORMWATER MANAGEMENT FACILITY
329-6{32} — STORMWATER MANAGEMENT OFFICER
329-6{33} — STORMWATER MANAGEMENT PRACTICES (SMPs)
329-6{34} — STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
329-6{35} — STORMWATER RUNOFF
§ 329-7 — Stormwater pollution prevention plans.
§ 329-8 — Performance and design criteria for stormwater management and erosion and sediment control.
§ 329-9 — Maintenance, inspection and repair of stormwater facilities.
§ 329-10 — Construction inspection.
§ 329-11 — Performance guarantee.
§ 329-12 — Enforcement; penalties for offenses.
Ch 350 — Subdivision of Land
§ 350-12 — General requirements.
§ 350-18 — Preliminary plat.
§ 350-19 — Final plat.
Ch 425 — Zoning
§ 425-13 — Procedure.
§ 425-15 — Standards of site plan review.
§ 425-20 — General special use permit standards.
§ 425-21 — Additional standards for specific uses.
add
Stormwater control
Ch 329 — Stormwater Management
Ch 329 Art II — Stormwater Control
329-6{25} — SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM MUNICIPAL SEPARATE STORMWATER SEWER SYSTEMS GP-02-02
§ 329-9 — Maintenance, inspection and repair of stormwater facilities.
add
Stormwater management
Ch 162 — Driveways
Ch 186 — Flood Damage Prevention
Ch 309 — Sewers
309-3{16} — SPECIAL CONDITIONS
309-3{19} — STORMWATER MANAGEMENT OFFICER (SMO)
§ 309-5 — Responsibility for administration.
Ch 329 — Stormwater Management
§ 329-1 — Findings of fact.
§ 329-2 — Purpose.
§ 329-4 — Applicability.
§ 329-5 — Exemptions.
329-6{7} — DESIGN MANUAL
329-6{16} — MAINTENANCE AGREEMENT
329-6{30} — STORMWATER MANAGEMENT
329-6{31} — STORMWATER MANAGEMENT FACILITY
329-6{32} — STORMWATER MANAGEMENT OFFICER
329-6{33} — STORMWATER MANAGEMENT PRACTICES (SMPs)
§ 329-7 — Stormwater pollution prevention plans.
§ 329-8 — Performance and design criteria for stormwater management and erosion and sediment control.
§ 329-9 — Maintenance, inspection and repair of stormwater facilities.
§ 329-10 — Construction inspection.
§ 329-11 — Performance guarantee.
§ 329-12 — Enforcement; penalties for offenses.
Ch 350 — Subdivision of Land
Ch 425 — Zoning
§ 425-13 — Procedure.
§ 425-15 — Standards of site plan review.
§ 425-20 — General special use permit standards.
add
Streetlighting
§ 350-16 — Reservations and easements.
§ 350-18 — Preliminary plat.
§ 350-19 — Final plat.
add
Swimming pools
§ 149-4 — Building permits.
§ 309-6 — Discharge prohibitions; exceptions.
Ch 425 — Zoning
§ 425-26 — Home occupations.
§ 425-29 — Pools.
425-81{3} — ACCESSORY STRUCTURE
425-81{127} — STRUCTURE
425-81{129} — SWIMMING POOL