home
Home
code
Code
Code
Index
law
Laws (1)
New Laws (1)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Township of Middlesex, PA
chevron_right
2023-12-20
info
chevron_right
Index: B
Filter By Letter
#
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
B
add
Backfilling
§ 89-14 — Inspections.
§ 89-18 — Retaining walls.
§ 101-15 — Streets.
§ 101-23 — Underground utility installation.
§ 175-118 — Landfills or resource recovery facilities.
§ 175-119 — Mineral removal.
§ A177-4 — Conditions on use and occupancy of streets.
add
Barricades
§ 19-48 — Intent to participate.
§ 101-15 — Streets.
§ 101-23 — Underground utility installation.
add
Batteries
140-2{8} — FERROUS CONTAINERS
164-2{2} — INOPERABLE
175-8{24} — AUTOMOBILE SERVICE STATION
175-8{242} — SOLAR-RELATED EQUIPMENT
175-8{284} — WIND CHARGER
add
Bee keeping
§ 175-155.8 — Beekeeping.
add
Bicycles
101-13{20} — STREET
§ 101-15 — Streets.
§ 101-16 — Stormwater management.
§ 144-18 — Protected watershed requirements.
150-7{78} — PUBLIC ACCESS EASEMENT
150-7{85} — RIGHT-OF-WAY
150-7{87} — STREET
150-7{88} — STREET, PRIVATE
§ 150-25 — Preliminary application contents.
§ 150-29 — Public improvements.
§ 150-35 — Transportation network.
add
Blasting
§ 175-119 — Mineral removal.
add
Blocks
§ 89-8 — Application for permit.
§ 144-20 — Design criteria for stormwater management and drainage facilities.
§ 144-23 — SWM site plan and report contents.
150-7{13} — BLOCK
150-7{26} — CROSSWALK
§ 150-26 — Final application contents.
§ 150-48 — Landscape screening.
§ 175-69 — Landscaping, signs, parking and loading regulations.
§ 175-98 — Billboards.
§ 175-112 — Hazardous waste disposal, treatment, transportation or storage.
§ 175-152 — Mobile homes located outside mobile home parks.
§ 175-156 — Off-street parking.
§ 175-158 — Storage requirements.
add
Board of Appeals
§ 65-4 — Board of Appeals.
add
Board of Commissioners
65-7{4} — TOWNSHIP
add
Boats and Boating
175-8{217} — RECREATIONAL VEHICLE
add
Bonds
§ 1-4 — Legislation saved from repeal; matters not affected by repeal.
§ 4-9 — Bond required.
89-2{25} — SECURITY
§ 89-17 — Fills.
101-13{10} — FINANCIAL SECURITY
§ 134-23 — Tank cleaning contract and bonding.
140-2{10} — HIGH-GRADE OFFICE PAPER
§ 144-23 — SWM site plan and report contents.
150-7{41} — FINANCIAL SECURITY
§ 150-8 — General procedures.
§ 150-17 — Approval of required improvements; final release of improvement security.
§ 155-20 — Powers and duties of officer.
§ 162-23 — Designation of approved storage garages; bonding; towing and storage.
§ 175-81 — Application for planned residential development final approval.
§ 175-112 — Hazardous waste disposal, treatment, transportation or storage.
§ 175-118 — Landfills or resource recovery facilities.
§ 175-119 — Mineral removal.
§ 175-127.3 — Solar energy production facility, large.
§ 175-137 — Wind energy production facility, large.
§ 175-140 — Screening and landscaping.
§ 175-155.2 — Oil and gas well site development.
§ 175-155.4 — Violation of oil and gas regulations.
§ 175-155.10 — Logging and timbering.
§ 175-182 — Stay of proceedings.
add
Brush, grass and weeds
140-2{13} — LEAF WASTE
144-10B{5} — BEST MANAGEMENT PRACTICES (BMPS)
§ 144-18 — Protected watershed requirements.
§ 144-20 — Design criteria for stormwater management and drainage facilities.
§ 150-35 — Transportation network.
175-8{31} — BUFFER YARD
175-8{45} — CHICKEN TRACTOR
175-8{138} — LANDSCAPE BUSINESS
175-8{139} — LANDSCAPING PLAN
§ 175-98 — Billboards.
§ 175-134 — Municipal recreation.
§ 175-156 — Off-street parking.
add
Buffers
§ 89-22 — General requirements.
144-10B{5} — BEST MANAGEMENT PRACTICES (BMPS)
144-10B{73} — RIPARIAN BUFFER
§ 144-11 — General requirements.
§ 144-12 — Exemptions/modifications.
§ 144-18 — Protected watershed requirements.
Ch 144 Art VI — Riparian Buffer Standards
§ 144-23 — SWM site plan and report contents.
§ 144-47 — Recording of approved plan and agreements.
§ 150-25 — Preliminary application contents.
§ 150-26 — Final application contents.
§ 150-35 — Transportation network.
175-8{31} — BUFFER YARD
175-8{191} — PERIMETER SETBACK
§ 175-65 — Design standards.
§ 175-68 — Additional building setbacks.
§ 175-71 — Screening.
§ 175-73 — Application for tentative approval.
§ 175-81 — Application for planned residential development final approval.
§ 175-96.1 — Agritourism.
§ 175-97 — Automobile service stations.
§ 175-98 — Billboards.
§ 175-99.1 — Catering/event venues.
§ 175-100 — Cemeteries.
§ 175-101 — Places of worship/places of assembly.
§ 175-102 — Clinics, hospitals or nursing homes.
§ 175-104 — Nonmunicipal recreation.
§ 175-107 — Day-care centers or nursery schools.
§ 175-109 — Flex space.
§ 175-114 — Horse boarding or riding academies.
§ 175-115 — Junkyards.
§ 175-116 — Kennels or veterinary clinics.
§ 175-118 — Landfills or resource recovery facilities.
§ 175-120 — Mobile home parks.
§ 175-121 — New and used vehicle sales and service.
§ 175-122 — Outdoor sales of mobile homes, recreational vehicles and heavy equipment.
§ 175-123 — Planned industrial parks.
§ 175-124 — Planned shopping centers.
§ 175-127 — Public utility buildings.
§ 175-127.3 — Solar energy production facility, large.
§ 175-128 — Supply yards.
§ 175-130 — Vehicle repair garage or heavy equipment repair.
§ 175-131 — Wholesale sales in conjunction with retail business.
§ 175-133 — Manufacturing.
§ 175-134 — Municipal recreation.
§ 175-137 — Wind energy production facility, large.
§ 175-140 — Screening and landscaping.
§ 175-155.1 — Landscape business.
§ 175-155.10 — Logging and timbering.
§ 175-156 — Off-street parking.
§ 175-167 — Nonconforming uses.
§ 175-185 — Building permits.
§ 175-254 — Additional conditional use regulations.
§ 175-255 — Area and bulk regulations.
add
Bufferyards
§ 175-255 — Area and bulk regulations.
add
Building construction
§ 84-16 — Enforcement.
§ 150-14 — Recording of final plat.
add
Building permits
§ 89-7 — Exceptions.
§ 89-8 — Application for permit.
§ 89-15 — Working conditions.
§ 89-18 — Retaining walls.
§ 97-2 — Purpose.
97-4{1} — BUILDING PERMIT
97-4{4} — IMPACT FEE
§ 97-6 — Imposition of impact fee.
§ 97-7 — Calculation of impact fee.
§ 97-11 — Administration of impact fees.
§ 97-14 — Method of payment.
§ 97-15 — Credit against impact fee.
§ 97-16 — Refunds.
§ 101-25 — Traffic/regulatory and guidance signs.
§ 144-25 — SWM site plan and report review.
§ 150-14 — Recording of final plat.
§ 150-29.1 — Recreation fees.
175-8{36} — BUILDING PERMIT
175-8{42} — CERTIFICATE OF OCCUPANCY
175-8{293} — WIRELESS COMMUNICATIONS FACILITY APPLICANT (WCF APPLICANT or APPLICANT)
§ 175-73 — Application for tentative approval.
§ 175-80 — Status of plan after tentative approval.
§ 175-92 — Approval of conditional uses; expiration.
§ 175-93 — Approval of uses by special exception; expiration.
§ 175-140 — Screening and landscaping.
§ 175-151 — Land development and grading.
§ 175-155.9 — Nontower wireless communication facilities (WCFs).
§ 175-183 — Zoning Officer.
§ 175-185 — Building permits.
§ 175-186 — Certificates of occupancy.
add
Burning
Ch 57 — Burning, Open
§ 57-1 — Burning of certain materials prohibited.
§ 57-2 — Conditions for burning of newspapers, leaves, branches and paper products.
72-2{4} — PARAPHERNALIA or DRUG PARAPHERNALIA
Ch 140 — Solid Waste and Recycling
§ 175-139 — Performance standards.
add
Bus stops
§ 175-155.2 — Oil and gas well site development.
§ 175-155.3 — Natural gas compressor station and natural gas processing plant.