home
Home
code
Code
Code
Index
law
Laws (5)
New Laws (5)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Township of Mount Joy, PA
chevron_right
2022-11-17
info
chevron_right
Index: U
Filter By Letter
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
U
add
Utilities
§ 35-1 — Intent.
§ 35-7 — Application procedures and requirements.
§ 53-4 — Objectives.
§ 53-5 — Applicability.
53-9{8} — DEVELOPMENT
53-9{20} — MANUFACTURED HOME
53-9{24} — NEW MANUFACTURED HOME PARK
53-9{27} — REGULATORY FLOOD PROTECTION ELEVATION (BPE)
§ 53-10 — Floodplain Administrator.
§ 53-13 — Floodplain development permit application requirements.
§ 53-17 — General requirements.
§ 53-18 — Specific requirements.
§ 53-19 — Design and construction standards.
§ 67-3 — Obligations of holding tank owner or user.
§ 68-9 — Maintenance.
69-6{1} — NORMAL FARMING OPERATIONS
§ 69-9 — Application procedures and requirements.
§ 69-15 — Sewage sludge use.
§ 69-16 — Application of sewage sludge to soil.
§ 69-17 — Prohibited areas.
69-22{2} — AUTHORITY
77-3{8} — NORMAL FARMING OPERATION
77-3{15} — RESOURCE RECOVERY FACILITY
§ 77-4 — Permit required; exception.
§ 77-6 — Siting criteria.
81-201{52} — SIMPLIFIED APPROACH (SA)
§ 81-303 — General design standards.
§ 81-304 — Volume controls.
§ 81-306 — Riparian buffers/riparian forest buffers.
§ 81-310 — Stormwater management design standards.
§ 81-402 — Plan requirements.
84-1{2} — ENCROACHMENT
§ 86-2 — Purpose.
86-7B{18} — EASEMENT, UTILITY
86-7B{26} — IMPROVEMENT
86-7B{32} — MINOR LAND DEVELOPMENT PLAN
86-7B{33} — MINOR SUBDIVISION PLAN
86-7B{42} — RIGHT-OF-WAY
86-7B{51} — STRUCTURE
§ 86-11 — Preliminary plan requirements.
§ 86-13 — Final plan requirements.
§ 86-23 — Easements.
§ 86-25 — Streets.
§ 86-28 — Sewer and water supply systems.
§ 86-33 — Underground utility lines.
§ 86-51 — Applicability.
86-52{4} — MOBILE HOME LOT
§ 86-53 — Permits for mobile home park construction, alteration or extension.
§ 86-56 — Park construction requirements.
§ 86-59 — Electrical distribution system.
§ 86-63 — Fuel supply and storage.
§ 86-66 — Miscellaneous requirements.
98-3{3} — DOCUMENT
107-6{12} — CLOSED-LOOP GEOTHERMAL
107-6{26} — OPEN-LOOP GEOTHERMAL
107-6{32} — WELL
§ 107-7 — Duties of property owner; requirement for permit; recording of site plan.
§ 107-9 — Location.
§ 107-10 — Well and borehole construction.
§ 110-102 — Purpose.
§ 110-104 — Scope.
§ 110-107 — Use not provided for.
110-111B{22} — BUFFER
110-111B{44} — FAMILY
110-111B{58} — IMPROVEMENT
110-111B{89} — OPEN SPACE
110-111B{106} — PUBLIC SEWER
110-111B{107} — PUBLIC UTILITY
110-111B{108} — PUBLIC WATER
110-111B{113} — RIGHT-OF-WAY
110-111B{123} — SOLAR ENERGY SYSTEM, ACCESSORY USE
110-111B{137} — STRUCTURE
§ 110-205 — Baltimore Pike Corridor District (BPC).
§ 110-402 — Specific requirements.
110-402UU(2){1} — ACCESSORY EQUIPMENT
110-402UU(2){5} — DATA COLLECTION UNIT (DCU)
110-402UU(2){7} — ELECTRICAL TRANSMISSION TOWER
110-402VV(2){1} — CO-LOCATION (also CO-LOCATED)
110-402VV(2){5} — MODIFICATION or MODIFY
110-402VV(2){6} — RIGHT-OF-WAY
110-402VV(2){9} — UTILITY POLE
§ 110-502 — Noise.
§ 110-603 — Table of Off-Street Parking and Loading Requirements.
§ 110-704 — Street trees.
§ 110-708 — Buffer area.
§ 110-710 — Landscape plan.
§ 110-809 — General sign regulations.
§ 110-902 — Uses not meeting definition of land development.
§ 110-1003 — Expansion.
§ 110-1201 — Filing requirements; criteria applicable to all conditional uses; conditions; site plan approval.
§ 110-1402 — Zoning permits.