Borough of Lake City, PA
Erie County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Borough Council of the Borough of Lake City 8-8-2011 by Ord. No. 401-11[1]. Amendments noted where applicable.]
GENERAL REFERENCES
Building construction and floodplain management — See Ch. 30.
Sewers — See Ch. 52.
Subdivision and land development — See Ch. 57.
Water — See Ch. 70.
Zoning — See Ch. 72.
[1]
Editor's Note: This ordinance also superseded former Ch. 54B, Stormwater Management, adopted 12-16-1996 by Ord. No. 324-96, as amended.
Article I General Provisions

§ 54B-1 Short title.

§ 54B-2 Statement of findings.

§ 54B-3 Purpose.

§ 54B-4 Statutory authority.

§ 54B-5 Applicability.

§ 54B-6 Repealer.

§ 54B-7 Severability.

§ 54B-8 Compatibility with other requirements.

§ 54B-9 Duty of persons engaged in development of land.

§ 54B-10 Municipal liability disclaimer.

Article II Definitions

§ 54B-11 Interpretation of terms.

§ 54B-12 Terms defined.

Article III Stormwater Management Standards

§ 54B-13 General requirements.

§ 54B-14 Exemptions/modifications.

§ 54B-15 Waivers.

§ 54B-16 Volume controls.

§ 54B-17 Rate controls.

§ 54B-18 Sensitive areas and stormwater hotspots.

Article IV Erosion and Sedimentation Standards

§ 54B-19 Requirements during earth disturbance activities.

Article V Protected Watershed Standards

§ 54B-20 Protected watershed requirements.

Article VI Riparian Buffer Standards

§ 54B-21 Requirements.

§ 54B-22 Easement.

Article VII Design Criteria

§ 54B-23 Design criteria for stormwater management and drainage facilities.

§ 54B-24 Calculation methodology.

Article VIII SWM Site Plan and Report Requirements

§ 54B-25 General requirements.

§ 54B-26 SWM site plan and report contents.

§ 54B-27 SWM site plan and report submission.

§ 54B-28 SWM site plan and report review.

§ 54B-29 Modification of plans.

§ 54B-30 Resubmission of disapproved SWM site plan and report.

§ 54B-31 Authorization to construct; term of validity.

§ 54B-32 Record drawings; completion certificate; final inspection.

Article IX Easements

§ 54B-33 Easements.

Article X Maintenance Responsibilities

§ 54B-34 Financial guarantee.

§ 54B-35 Maintenance responsibilities.

§ 54B-36 Maintenance agreement for privately owned stormwater facilities.

Article XI Inspections

§ 54B-37 Schedule of inspections.

§ 54B-38 Right of entry.

Article XII Enforcement; Violations and Penalties

§ 54B-39 Notification.

§ 54B-40 Enforcement.

§ 54B-41 Public nuisance.

§ 54B-42 Suspension and revocation of approval or permit.

§ 54B-43 Violations and penalties.

§ 54B-44 Appeals.

Article XIII Prohibitions

§ 54B-45 Prohibited discharges and connections.

§ 54B-46 Roof drains.

§ 54B-47 Alteration of BMPs.

Article XIV Fees and Expenses

§ 54B-48 General.

§ 54B-49 Expenses covered by fees.

§ 54B-50 Recording of approved SWM site plan and related agreements.