home
Home
code
Code
Code
Index
law
Laws (4)
New Laws (4)
pubdocs
Public Documents
Public Documents
Agendas (362)
Comprehensive Plans (2)
Minutes (1370)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Township of White, PA
chevron_right
2019-03-13
info
chevron_right
Part II: General Legislation
chevron_right
Chapter 235 Sewers and Sewage Disposal
chevron_right
Part 4 Sewer Use
Part I: Administrative Legislation
Ch 1
General Provisions
Ch 12
Code Enforcement, Department of
Ch 23
Firemen's Relief Association
Ch 44
Officers and Employees
Ch 46
Official Map
Ch 49
Planning Commission
Ch 56
Records, Open
Ch 63
Salaries and Compensation
Part II: General Legislation
Ch 75
Adult Businesses
Ch 81
Alarm Devices
Ch 88
Animals
Ch 92
Assessment Permits
Ch 94
Assessments, Special
Ch 105
Burning, Outdoor
Ch 111
Cable Television
Ch 120
Construction
Ch 144
Fireworks
Ch 149
Floodplain Management
Ch 152
Furnaces, Outdoor
Ch 175
Nuisances
Ch 176
Nuisance Gatherings
Ch 178
Numbering of Buildings; Naming of Roads
Ch 189
Parks and Recreation
Ch 196
Peddling and Soliciting
Ch 203
Pornography
Ch 210
Property Maintenance
Ch 221
Rental Property
Ch 235
Sewers and Sewage Disposal
Ch 235 Pt 4
Sewer Use
Ch 235 Pt 4 Art IV
Authorizations
§ 235-34
Mandatory connection.
§ 235-35
Notification to connect to system.
§ 235-36
Septic systems during sewer tap prohibition.
§ 235-37
Violations and penalties.
§ 235-38
Vandalism.
§ 235-39
Supervisors responsible for sewer system.
§ 235-40
Rates, rules, and regulations authorized.
§ 235-41
Authority to bind Township.
§ 235-42
Service of notices.
§ 235-43
Complaints.
§ 235-44
Authorization to enter upon private property.
Ch 235 Pt 4 Art V
Conditions of Service
§ 235-45
Prohibited disposal methods.
§ 235-46
Prohibited connections.
§ 235-47
Downspouts and surface water prohibited.
§ 235-48
Control of industrial wastes.
§ 235-49
Prohibited wastes.
§ 235-50
Grease traps and clean-out schedule required.
§ 235-51
Inspection port installation.
Ch 235 Pt 4 Art VI
Application for Service
§ 235-52
Connection procedures.
§ 235-53
Information on applications.
§ 235-54
Approval of applications.
§ 235-55
Approved application becomes contract.
§ 235-56
Special contracts.
Ch 235 Pt 4 Art VII
Service Connections
§ 235-57
Separate connection for each building.
§ 235-58
Installation of service line connection.
§ 235-59
Service line connection on private property.
§ 235-60
One service connection for each customer.
§ 235-61
Change in location of service line connection.
§ 235-62
Inspection.
Ch 235 Pt 4 Art VIII
Bills and Payments
§ 235-63
Sewer rates established.
§ 235-64
Basis for preparation of sewer bills.
§ 235-65
Sewer bill responsibility of owner.
§ 235-66
Collection of sewer charges.
§ 235-67
Time period for payment of sewer charges.
§ 235-68
Effective date of sewer rates.
§ 235-69
(Reserved)
§ 235-70
Place of payment.
§ 235-71
Bills rendered and due.
§ 235-72
Abatement.
Ch 235 Pt 4 Art IX
Sewer Line Construction Standards
§ 235-73
Purpose.
§ 235-74
Extension of existing sewer lines.
§ 235-75
Installation of interceptors, collectors and service line connections.
§ 235-76
Installation of service line extensions.
Ch 235 Pt 4 Art X
Terminology
§ 235-77
Definitions.
Ch 235 Pt 4 Art XI
Industrial Pretreatment
§ 235-78
through § 235-93. (Reserved)
Ch 244
Smoking
Ch 257
Solid Waste; Recycling
Ch 263
Stormwater Management
Ch 270
Streets and Sidewalks
Ch 275
Subdivision and Land Development
Ch 282
Taxation
Ch 295
Vehicles and Traffic
Ch 299
Vehicles, Junked
Ch 311
Water
Disposition List
Ch DL
Disposition List
arrow_back
print
Print
email
Email
download
Download
share
Share
add_alert
Get Updates
arrow_forward
Part 4
Sewer Use
Article IV
Authorizations
chevron_right
§ 235-34
Mandatory connection.
chevron_right
§ 235-35
Notification to connect to system.
chevron_right
§ 235-36
Septic systems during sewer tap prohibition.
chevron_right
§ 235-37
Violations and penalties.
chevron_right
§ 235-38
Vandalism.
chevron_right
§ 235-39
Supervisors responsible for sewer system.
chevron_right
§ 235-40
Rates, rules, and regulations authorized.
chevron_right
§ 235-41
Authority to bind Township.
chevron_right
§ 235-42
Service of notices.
chevron_right
§ 235-43
Complaints.
chevron_right
§ 235-44
Authorization to enter upon private property.
chevron_right
Article V
Conditions of Service
chevron_right
§ 235-45
Prohibited disposal methods.
chevron_right
§ 235-46
Prohibited connections.
chevron_right
§ 235-47
Downspouts and surface water prohibited.
chevron_right
§ 235-48
Control of industrial wastes.
chevron_right
§ 235-49
Prohibited wastes.
chevron_right
§ 235-50
Grease traps and clean-out schedule required.
chevron_right
§ 235-51
Inspection port installation.
chevron_right
Article VI
Application for Service
chevron_right
§ 235-52
Connection procedures.
chevron_right
§ 235-53
Information on applications.
chevron_right
§ 235-54
Approval of applications.
chevron_right
§ 235-55
Approved application becomes contract.
chevron_right
§ 235-56
Special contracts.
chevron_right
Article VII
Service Connections
chevron_right
§ 235-57
Separate connection for each building.
chevron_right
§ 235-58
Installation of service line connection.
chevron_right
§ 235-59
Service line connection on private property.
chevron_right
§ 235-60
One service connection for each customer.
chevron_right
§ 235-61
Change in location of service line connection.
chevron_right
§ 235-62
Inspection.
chevron_right
Article VIII
Bills and Payments
chevron_right
§ 235-63
Sewer rates established.
chevron_right
§ 235-64
Basis for preparation of sewer bills.
chevron_right
§ 235-65
Sewer bill responsibility of owner.
chevron_right
§ 235-66
Collection of sewer charges.
chevron_right
§ 235-67
Time period for payment of sewer charges.
chevron_right
§ 235-68
Effective date of sewer rates.
chevron_right
§ 235-69
(Reserved)
chevron_right
§ 235-70
Place of payment.
chevron_right
§ 235-71
Bills rendered and due.
chevron_right
§ 235-72
Abatement.
chevron_right
Article IX
Sewer Line Construction Standards
chevron_right
§ 235-73
Purpose.
chevron_right
§ 235-74
Extension of existing sewer lines.
chevron_right
§ 235-75
Installation of interceptors, collectors and service line connections.
chevron_right
§ 235-76
Installation of service line extensions.
chevron_right
Article X
Terminology
chevron_right
§ 235-77
Definitions.
chevron_right
Article XI
Industrial Pretreatment
chevron_right
§ 235-78
through § 235-93. (Reserved)
chevron_right