No manufactured home shall be located within the Town of Coxsackie, other than in a manufactured home park, or remodeled until an application for a permit has been filed in the Town Clerk's office and has been approved by the Code Enforcement Office. Such application shall be filled out in duplicate on a form supplied by the Town Clerk and shall be accompanied by two copies of a plot plan, drawn to scale, showing the dimensions of the parcel of land proposed to be used as a site, the location of the existing or proposed water supply and the location of the existing or proposed method for disposing of sewage.
A. 
Upon receipt of an application for a permit to locate or remodel a manufactured home, the Town Clerk shall transmit the same to the Town Building Inspector, who shall make an examination of the site described in said application and report his findings and shall approve or disapprove the issuance of the permit applied for.
B. 
One copy of said application, when approved by the Code Enforcement Office and signed by the Town Clerk, shall constitute a permit. Such permit, together with one copy of the plot plan, shall be given to the applicant; the second copy of both the application and the plot plan shall be retained by the Town Clerk.
C. 
Upon completion of the permitted project, the applicant shall notify the Building Inspector that the structure is ready for final inspection, whereupon the Building Inspector shall promptly make such final inspection, and, if satisfied that the regulations pertaining to this project have been complied with, he shall issue a certificate of compliance granting permission to use the structure.
No manufactured home shall be occupied until installations are complete. No water service shall be turned on until the Building Inspector has made final inspection and given written approval.
A fee shall be charged for issuing a permit pursuant to this article, payment to be made at the time the application is filed. Such fees shall be as set forth by the Town of Coxsackie in the Fee Schedule.[1]
[1]
Editor's Note: The Fee Schedule is on file in office of the Building Inspector/Code Officer.
No manufactured home shall remain anywhere in the Town of Coxsackie, other than on a permanent site or in a manufactured home park or in storage, for a period longer than four weeks in any twelve-calendar-month period. An application for permit for such temporary location shall be made to the Town Clerk, who shall have authority to issue such temporary permit without cost to the applicant. Revocation of a temporary permit may be made by the Town Building Inspector.