The procedures set forth in this article shall be followed by all applicants proposing to subdivide or develop land in the Township.
A. 
A tentative sketch plan is recommended for the initial submission of all but the most simple subdivisions and/or land developments.
B. 
Applicants shall be required to submit the following plans:
(1) 
A preliminary plan is required for all subdivisions and land developments proposed within the Township.
(2) 
Final plan.
(a) 
A final plan consisting of the following two parts is required for all subdivisions and land developments proposed within the Township:
[1] 
An improvements construction plan;
[2] 
A record plan.
(b) 
A plan showing all information required for a final plan, which has been submitted as a preliminary plan and for which no changes have been required by the Township, may be approved as a final plan.
C. 
A land development plan shall be required whenever the application for approval shall be construed to be a land development in accordance with the definition in the latest amendment of the Municipalities Planning Code.[1] A development plan may be required in conjunction with a subdivision plan or in lieu of a subdivision plan when review of a plan on a lot-by-lot basis would not be applicable.
[1]
Editor's Note: See 53 P.S. § 10101 et seq.
D. 
All plans of subdivision or land development shall be subject to the following review process:
[Added 12-17-2003 by Ord. No. 03-09]
(1) 
Review by Township Civil Engineer, Traffic Engineer, Sanitary Sewer Engineer, Township Landscape Architect (if applicable within Towamencin Village), Township Fire Marshal, Township Police Department, Fire Department, Sewer Authority, Montgomery County Conservation District, and any other agency having authority as required by local, state or federal laws.
(2) 
Preliminary plan review by the Township Planning Commission.
(3) 
Review by the Montgomery County Planning Commission.
(4) 
Preliminary plan review by Towamencin Board of Supervisor.
(5) 
Final plan review by Towamencin Board of Supervisors.
E. 
Minor plans of subdivision or land development shall apply to the following:
[Added 12-17-2003 by Ord. No. 03-09]
(1) 
Lot line adjustment between two abutting, existing, legally approved and recorded lots so long as the adjusted lines and lots conform to all zoning requirements without the need for variances or special exemptions.
(2) 
Minor residential subdivision that will divide a single lot into one additional lot for the construction of a single-family dwelling unit, in which the new lot will be of the same zoning classification as the original, will comply with all zoning requirements without the need for variances and or special exceptions, and will not require the extension of public utilities or stormwater conveyance systems, and has applicable road frontage to meet the requirements of the Township Subdivision and Zoning Ordinances. The proposed building and impervious coverages of the existing and proposed lots must remain under the minimum standards of the Township Stormwater Management Ordinance.[2]
[2]
Editor's Note: See Ch. 132, Stormwater Management.
(3) 
A new building or an addition onto a structure that will not exceed the limits of building or impervious coverages of the Township Stormwater Management Ordinance, or require additional parking, curbing, or site work. The property shall only be eligible for two minor plan approvals. Any requests after the second approval, or a proposal that in addition to the previous minor plan approval will cumulatively exceed the minimum requirements of the Stormwater Management Ordinance, shall be reviewed as a standard land development application. The proposal must conform with all requirements of the Township Zoning Ordinance without the need for variances or special exceptions. The proposal must not require the extension of public roads, utilities, or stormwater systems.
(4) 
The application shall be subject to the following review process:
(a) 
Township Civil Engineer, Traffic Engineer, Sanitary Sewer Engineer, Police Department, Fire Marshal, and any other agency having authority based on local, state or federal laws.
(b) 
Montgomery County Planning Commission.
(c) 
Final plan review before the Towamencin Board of Supervisors.
(5) 
The plan submission must meet the plan requirements of § 136-705 for minor subdivision plans, and § 136-706 for record plans.
A tentative sketch plan is recommended to be submitted in accordance with this chapter as a basis for informal discussion with the Township Planning Commission. There are no formal reviews of sketch plans and submission does not start the time period for review as established by the Municipalities Planning Code, as last amended. Data furnished in a tentative sketch plan should include the following information.
A. 
General information:
(1) 
Name of subdivision or land development;
(2) 
Tax parcel number (Montgomery County Tax Map);
(3) 
Name and address of the owner/applicant/developer;
(4) 
Name and address of engineer, surveyor, architect, planner or landscape architect responsible for the plan;
(5) 
Total acreage of site;
(6) 
Tract boundaries;
(7) 
Date of plan;
(8) 
True North point;
(9) 
Location map;
(10) 
Zoning requirements, including:
(a) 
Applicable district;
(b) 
Maximum density permitted, if applicable;
(c) 
Lot size and yard requirements;
(d) 
Open space and impervious ground coverage ratios, if applicable;
(e) 
Any variances or special exceptions granted;
(11) 
Number of proposed lots;
(12) 
Proposed use.
B. 
General site plan at a scale of one inch (2.540 centimeters) equals 100 feet (30.48 meters) showing:
(1) 
Soil types and wetlands;
(2) 
Vegetation, forest cover, and large trees;
(3) 
Drainage ways, streams, swales and ponds;
(4) 
Streets on and adjacent to the tract;
(5) 
Significant topographical and physical features [five foot (1.524 meter) contours];
(6) 
Proposed general street layout;
(7) 
Proposed general lot layout;
(8) 
Proposed landscaping;
(9) 
Location of construction (for land developments);
(10) 
Types of building proposed;
(11) 
Number of units proposed;
(12) 
Location and number of parking spaces;
(13) 
Open space areas;
(14) 
Recreation areas;
(15) 
Floodplain and steep slope areas;
(16) 
Features within 500 feet (152.4 meters) of the site.
C. 
Written statement indicating a tentative method for administration and maintenance of open space, when applicable.
The preliminary plan shall show or be accompanied by the following information:
A. 
Drafting standards:
(1) 
The plan shall be drawn at a scale of one inch (2.540 centimeters) equals 100 feet (30.48 meters) or larger [one inch (2.540 centimeters) equals 50 feet (15.24 meters), etc.]. Plans shall be accurate to within one part in 300. The plan shall include a graphic scale.
(2) 
Dimensions shall be set in feet (meters) and decimal parts (centimeters) thereof; and bearings in degrees, minutes, and seconds.
(3) 
Each sheet shall be numbered and shall show its relationship to the total number of sheets.
(4) 
Where any revision is made, or when the plan is a revision of a previously approved plan, a description of the revisions should be noted in the plan with the appropriate date.
(5) 
The plan shall be so prepared and bear an adequate legend to indicate clearly which features are existing and which are proposed. All lettering shall be at least 0.2 inch (0.508) centimeters in height, or as specifically approved by the Township Engineer. A two-inch (5.08 centimeter) wide margin shall be provided on all sheets, or such margin as is specifically approved by the Township Engineer.
(6) 
The boundary line of the subdivision shall be shown as a solid heavy line.
(7) 
Sheet sizes shall be either 15 inches by 18 inches (38.1 by 45.72 centimeters), 18 inches by 30 inches (45.72 by 76.2 centimeters), or 24 inches by 36 inches (60.96 by 91.44 centimeters), or such size as is specifically approved by the Township Engineer. Sheet sizes 24 inches by 36 inches (60.96 by 91.44 centimeters) are recommended. Sheets shall be all the same size and consecutively numbered. Where more than one sheet is used, a key map and index sheet(s) shall be provided.
B. 
General information to be shown:
(1) 
Name of subdivision or land development;
(2) 
Tax parcel number (Montgomery County Tax Map), Township block and unit number, County Planning Commission File Number;
(3) 
Name and address of the owner/applicant/developer;
(4) 
Name and address of the registered engineer, surveyor, landscape architect, architect, or planner responsible for the plan;
(5) 
Zoning requirements, including:
(a) 
Applicable district;
(b) 
Maximum density permitted, if applicable;
(c) 
Lot size and yard requirements;
(d) 
Open space, building coverage, and impervious ground coverage ratios, if applicable;
(e) 
Any relief from the Zoning Ordinance requirements sought or granted; indicate Zoning Hearing Board decision dates;
(f) 
List proposed statistics of the plans which indicate compliance with the zoning requirements;
(6) 
Location map showing relation of site to adjoining properties and streets;
(7) 
North point;
(8) 
Written and graphic scales (including scale of location map);
(9) 
Total acreage of the site;
(10) 
A complete outline survey of the property to be subdivided or developed, showing all courses, distances, tie-ins to all adjacent intersections and areas;
(11) 
Location of all existing monuments;
(12) 
Abutting lot lines of all adjoining properties with names of landowners;
(13) 
Existing streets on and adjacent to the site with ultimate right-of-way;
(14) 
Existing buildings (and their uses), driveways, sewer lines, storm drains, culverts, bridges, utility easements, quarries, railroads, and other significant man-made and/or off-site features as required by the Township Engineer;
(15) 
Signature blocks;
(16) 
The date of plan preparation with revision dates and statement indicating items revised;
(17) 
The plan shall list all waivers being requested by the applicant;
(18) 
The plan shall include all segments of on- and off-road trails pursuant to the Towamencin-Wide Trail Master Plan, as last amended.
C. 
Existing features.
(1) 
The location, names, and widths of streets, the location of property lines and names of owners, the location of watercourses, sanitary sewers, storm drains and similar features within 1,000 feet (304.8 meters) or such distance as is specifically approved by the Township Engineer, of any part of the land to be subdivided or developed. An aerial photograph, which clearly shows all features required of this section to the satisfaction of the Township Engineer, may be submitted in lieu of the requirements of this section;
[Amended 12-17-2003 by Ord. No. 03-09]
(2) 
Location, size, and ownership of all underground utilities, and any rights-of-way or easements within the property;
(3) 
Contours at vertical intervals of two feet (0.6096 meters) for land with average natural slope of 4% or less; vertical intervals of five feet (1.524 meters) for more steeply sloping land;
(4) 
Soil map showing:
(a) 
Soil types within the site, based on maps contained in the Soil Survey of Montgomery County, Pennsylvania, United States Department of Agriculture, Soil Conservation Service, 1967. A table shall indicate each soil's limitations for community development.
(b) 
Contour lines measured at vertical intervals of two feet (0.6096 meters). Such slopes shall be determined by on-site survey, not interpretation of U.S.G.S. maps. Contours should extend 100 feet (30.48 meters) beyond the property lines of the proposed development.
(c) 
The delineation of all floodplain areas where a subdivision or land development lies partially, or completely, or borders on a floodplain showing:
[1] 
Location and elevation of existing and proposed streets, water supply and sanitary facilities, building sites, structures, soil types, and proposed floodproofing measures;
[2] 
Boundaries of the floodplain and the base flood elevation as defined in the Floodplain Conservation District of the Towamencin Township Zoning Ordinance,[1] as last amended.
[1]
Editor's Note: See Ch. 153, Zoning.
(d) 
All streams, swales, lakes, ponds and wetlands.
(5) 
Slope map showing:
(a) 
Slopes between 15% to 25%;
(b) 
Slopes greater than 25%;
(6) 
Vegetation map showing:
(a) 
The location and size by caliper of all existing trees larger than six inches (15.24 centimeters) caliper as measured one foot (0.3048 meters) above the ground level which either stand alone or are within 50 feet (15.24 meters) of the center line of any existing or proposed street; and
(b) 
The location, species mix, general size and condition of any forested areas or masses of other significant plant material.
(7) 
Items of historical significance.
D. 
Proposed layout showing:
(1) 
Proposed standards, as applicable:
(a) 
Density;
(b) 
Open space;
(c) 
Dwelling unit mix;
(d) 
Type and size of units (square footage/square meters of footprints);
(e) 
Size of nonresidential buildings (include floor area and gross leasable area);
(f) 
Total number of off-street parking spaces and method of calculation;
(2) 
The layout and names of streets and driveways, including widths of cartways and rights-of-way and recommended improvements (see Township for recommended street list).
(3) 
The layout and approximate dimensions, areas, and uses of lots, building setback lines, and rear and side yard lines. The error of closure of all lot lines and easements shall not be greater than one part in 2,500.
(4) 
The arrangement and use of buildings, pads, structures, and parking areas in nonresidential developments with all necessary dimensions and number of parking spaces. Elevations and perspective sketches of proposed buildings are encouraged.
(5) 
All open space shall be so identified, and its proposed use and level of maintenance specified. The method of administration and maintenance of the open space shall be detailed.
(6) 
The layout of recreational or community facilities, sidewalks and pedestrian paths.
(7) 
Where the preliminary plan is phased and covers only a part of the applicant's entire holding, a sketch shall be submitted of the prospective street layout for the remainder.
E. 
Sedimentation and erosion control plan pursuant to the Clean Streams Law, P.L. 1987,[2] as last amended, and in accordance with standards and specifications found in the "Erosion and Sediment Control Handbook" available through the Montgomery County Conservation District.
[2]
Editor's Note: See 35 P.S. § 691.1 et seq.
F. 
Sewer and water plan, showing:
(1) 
Public sanitary sewer facilities, if applicable;
(2) 
Stormwater facilities, if applicable; and
(3) 
Public water supply facilities and distribution system, if applicable;
(4) 
Storm drainage computations and a drainage area plan shall be provided.
G. 
Tentative typical cross sections and center-line profiles for each proposed street shown on the preliminary plan. These plans may be submitted as separate sheets.
H. 
A landscaping plan including, but not necessarily limited to, the locations for street trees and the landscape treatment of reverse frontage lots and of any required buffer strips or yards.
I. 
Traffic impact study
(1) 
Purpose. A traffic impact study shall be required for all subdivisions of more than 10 lots, all land developments and rezoning requests to provide the Board of Supervisors with the opportunity to assess the effect of a proposed subdivision, land development or rezoning request on the transportation system in Towamencin Township. The purpose of the study is to identify traffic and transportation problems associated with the adequacy of the existing transportation network to provide access to, from and through the site in light of the character and volume of traffic expected to be generated by the proposed subdivision, land development, and/or rezoning. This study should also delineate solutions to such problems or facilities including the prescription of improvements to be provided by or at the expense of the applicant, consistent with the Township's Capital Improvement Program.
(2) 
Preparation of traffic impact study.
(a) 
The traffic impact study shall be prepared by a qualified traffic engineer and/or transportation planner with prior traffic study experience.
(b) 
A traffic impact study shall be submitted for all residential subdivisions or land developments of 10 or more lots or dwelling units; all commercial, office, industrial, institutional or other nonresidential uses requiring subdivision or land development approval; all rezoning requests.
(c) 
The Township Planning Commission may, upon the recommendation of the Township Engineer, determine that the requirement for a traffic impact study is not necessary.
(d) 
The requirements, procedures, and standards for the traffic impact study are as set forth in § 136-703I(4).
(3) 
Definitions. As used in this section, the following terms shall have the meanings indicated:
LEVEL OF SERVICE
As defined in the 1985 Highway Capacity Manual, Special Report 209, as amended, defines operational conditions within a traffic stream (or at an intersection approach). "Level of service" also generally describes these conditions in terms of such factors as speed, travel time, freedom to maneuver, traffic interruptions, comfort and convenience and safety. Six levels of service are defined for each type of traffic facility, ranging from A to F. Level of Service A indicates free flow; Level of Service B indicates stable flow; Level of Service C indicates stable but inhibited flow; Level of Service D indicates high-density, restricted stable flow; Level of Service E indicates operation at or near capacity; and Level of Service F is indicative of flow breakdown.
MAJOR INTERSECTION
Any intersection where traffic generated by the proposal will have a significant effect on the operation of traffic through the intersection. Where doubt exists, the qualified traffic engineer and/or planner shall seek guidance from the Township Planning Commission or the Township Engineer prior to the submission of the traffic impact study.
QUEUE ANALYSIS
This procedure includes the average queue and maximum queue of vehicles which will be observed in each traffic stream and intersection approach, measured in both feet and vehicles. Various statistical and/or computer models may be applied.
STUDY AREA
This area will extend along all Township, county and state roads serving the development and will extend to all major intersections in the Township that may be affected. Where doubt exists, the qualified traffic engineer and/or transportation planner will seek guidance from the Township Planning Commission or Township Engineer prior to the submission of the study.
TRIP GENERATION
The total count of trips to and from a study site per unit of land use (i.e., acres, dwelling unit, etc.) as established by the most recent edition of the institute of Transportation Engineers Trip Generation Report. For land uses not listed in this report, or if information is determined through a small sample size, the qualified traffic engineer and/or transportation planner shall seek guidance from the Township Planning Commission or Township Engineer prior to submission of the study.
VOLUME/CAPACITY ANALYSIS
This procedure compares the volume of a traffic facility to its capacity. The procedure described in the 1985 Highway Capacity Manual, Transportation Research Board Special Report 209, as amended, shall be followed.
WARRANTS FOR TRAFFIC SIGNAL INSTALLATION
A series of warrants which detail the minimum traffic volume, pedestrian volume or other criteria necessary for the installation of a traffic signal. These criteria are contained in the most recent edition of the Manual on Uniform Traffic Control Devices for Streets and Highways, United States Department of Transportation, FHWA.
(4) 
Requirements for traffic impact study.
(a) 
A traffic study shall include, but not necessarily be limited to, the following information:
[1] 
Site description;
[2] 
Existing conditions analysis;
[3] 
Future conditions analysis without proposed development;
[4] 
Trip generation characteristics of use(s);
[5] 
Future conditions analysis with the proposed development;
[6] 
Proposed improvements;
[7] 
Conclusions.
(b) 
Specific information required within the report shall include, but not necessarily be limited to, the following information:
[1] 
Site description. Identify the site, use and transportation setting of the site and its surrounding area including:
[a] 
A brief description of the size, location, proposed land uses, and completion date of the proposed land development. If the development is residential, types of dwelling units and number of bedrooms shall be included. Also, the description shall include probable socioeconomic characteristics of site users with respect to transportation needs of the site (i.e., number of senior citizens).
[b] 
The existing and proposed uses of the site shall be identified in terms of type and zoning classification category.
[c] 
A complete description of access and circulation for the site including, but not necessarily limited to, location of access points and method of traffic control.
[d] 
Description of the adjacent external roadway system within the study area. Major intersections in the study area shall be identified and illustrated. All existing and proposed public transportation services and facilities within a one-half-mile radius of the site shall also be documented. All future highway improvements within Towamencin Township and the study area, including proposed road construction and traffic signalization, shall be noted. Improvements from the Pennsylvania Department of Transportation's Twelve-Year Highway and Bridge Program shall also be noted. Any proposed or in-place roadway improvements due to proposed surrounding developments shall be noted.
[2] 
Existing conditions analysis. Existing traffic conditions shall be measured and documented for the roadways and intersections in the study area based on the following efforts:
[a] 
Daily and peak hour volumes. Schematics diagrams shall be presented depicting existing traffic volumes for average daily traffic (ADT), the weekday peak highway traffic hour(s) and peak development-generated hour(s) and the Saturday peak hour traffic. All documentation must be contained in the report. Turning movement and mainline volumes shall be presented for all peak hour conditions (weekday a.m. peak, weekday p.m. peak, weekday site-generated and Saturday peak) while only mainline volumes are required for ADT's. Source and method of computation must be included.
[b] 
Volume/capacity analysis at critical points. A volume capacity analysis based upon existing volumes shall be performed during the weekday and Saturday peak traffic hour(s) and the peak development-generated hour(s) for all roadways and major intersections in the study area.
[c] 
Levels of service at critical points. Based on the results obtained in the previous section, levels of service are to be computed and presented in schematic form. Included in this section shall also be a description of typical operating conditions at each level of service.
[3] 
Future conditions analysis without the proposed development. A description of the anticipated future traffic volumes and the ability of the roadway network to accommodate this traffic without the proposed development shall be provided. The future year(s) for which projections are made shall be the development completion year, unless required otherwise by the Township Planning Commission. Factors included within this section include, but are not necessarily limited to, background traffic growth and traffic generated by other proposed developments within the study area. Include the following:
[a] 
Daily and peak hour volumes. Clearly indicate the method and assumption used to forecast future volumes in order that Township personnel can duplicate these calculations. The schematic diagrams depicting future volumes shall be similar to those described previously in Subsection I(4)(b)[2][a] in terms of location and times (daily and peak hours).
[b] 
Volume/capacity analysis at critical points. Describe the ability of the roadway system to accommodate future traffic (without the proposed development). If roadway improvements or modifications are committed for implementation, the volume/capacity analysis should be presented for these conditions. Periods of analysis shall be the same as those previously performed in Subsection I(4)(b)[2][b].
[c] 
Levels of service at critical points. Based on the results obtained in the previous section, levels of service are to be determined and presented as in Subsection I(4)(b)[2][c].
[4] 
Trip generation characteristics. Vehicular trips resulting from the proposed development shall be estimated and distributed for weekday and Saturday peak traffic conditions during the weekday a.m. and p.m. peak traffic hours, the weekday peak development-generated hour and the Saturday peak traffic hour. Development traffic characteristics shall be determined as follows:
[a] 
Estimation of the number of trips generated by the proposed use(s) for each period shall be developed utilizing ITE publication, Trip Generation, latest edition. Other local sources of trip generation are acceptable, subject to approval by the Township Engineer.
[b] 
The direction of approach and departure for site-generated traffic shall be identified. As with all technical analysis steps, the basic method and assumptions used in this work must be clearly stated.
[c] 
Site-generated traffic volumes and access points combined with anticipated traffic volumes as calculated under Subsection I(4)(b)[3] to determine mainline and turning movement volumes for future conditions with the site developed as proposed.
[5] 
Future conditions analysis with the proposed development. A description of the adequacy of the roadway system to accommodate future traffic with development of the site shall be provided. An analysis shall be completed for each time period as listed in Subsection I(4)(b)[4] and as follows:
[a] 
Daily and peak hour traffic volumes. Mainline and turning movement volumes shall be presented, in schematic form, for the highway network in the study area as well as driveways and internal circulation roadways for the appropriate time periods (identified previously).
[b] 
Volume/capacity analysis at critical points. Similar to Subsection I(4)(b)[2][b] and I(4)(b)[3][b], a volume/capacity analysis shall be performed for the appropriate peak hours of future conditions with the site developed as proposed.
[c] 
Levels of service at critical points. Based upon the results obtained in the previous section, levels of service are to be determined and presented as in Subsection I(4)(b)[2][c] and I(4)(b)[3][c].
[6] 
Proposed improvements. A description of proposed improvements to remedy deficiencies shall be identified. Improvements shall be identified which would increase capacity to return to predevelopment levels of service conditions. Alternative improvement schemes shall be presented for postdevelopment traffic volumes to operate at a minimum Level of Service D or, under no circumstances, at a level of service worse than predevelopment levels. These recommendations shall separately identify committed projects of governmental agencies which were described and independently identified in Subsection I(4)(b)[1] and reflected in the analysis contained in Subsection I(4)(b)[2] and I(4)(b)[3] and as follows:
[a] 
Proposed recommended improvements. This section should describe the location, nature and extent of proposed improvements to assure sufficient capacity. The listing of recommended improvements shall include, but not necessarily be limited to, the following elements: internal circulation design, speed limit, stop and no parking sign locations, site access location and design, external roadway and intersection design and improvements and traffic signal installation and operation, including phasing and timing. All physical roadway improvement shall be shown in sketches. This listing shall also include, for each improvement, preliminary cost estimates, funding source, timing and likelihood of the improvement implementation and party responsible for the improvement.
[b] 
Volume/capacity analysis at critical points. Another iteration of the volume/capacity analysis shall be presented and described which demonstrates the anticipated results of making recommended improvements.
[c] 
Levels of service at critical points. Based on the results obtained in the previous section, levels of service for the study area with improvement shall be presented.
[7] 
Conclusion. The overall results of the traffic impact study shall be presented in a clear, concise description. It is anticipated that this concluding section will serve as an executive summary.
(5) 
Time of submission.
(a) 
A traffic management study shall be submitted to the Township Planning Commission with the preliminary plan application or the petition for rezoning, as the case may be. An application for preliminary plan approval shall be deemed incomplete and unacceptable for filing if the traffic study is not included in the submission.
(b) 
The preliminary plan and accompanying improvement construction plans shall not be submitted to the Pennsylvania Department of Transportation until the plans and traffic study have been reviewed by the Township Planning Commission, and approved by the Township Board of Supervisors. The submittal to the Pennsylvania Department of Transportation shall be accompanied by the comments of Towamencin Township.
(6) 
Implementation.
(a) 
The Township Planning Commission, the Township Engineer, and Board of Supervisors shall review the traffic study to analyze its adequacy in solving any traffic problems that may occur due to the land development, subdivision, or request for rezoning.
(b) 
The Board of Supervisors may decide, after receiving the reports and recommendations of the Township Planning Commission, Township Engineer, and Montgomery County Planning Commission, that certain improvements are necessary and may make these additional improvements to be completed by and at the cost of the developer as conditions to the subdivision, land development or request for rezoning approval.
J. 
The applicant shall submit a copy of the deed by which the property was acquired. The applicant shall submit the names of the real (title) owners of the property, the names of all equitable owners, and the names of all option holders.
K. 
Planning Modules for Land Development as required by Chapter 71 of the Pennsylvania Sewage Facilities Act.[3]
[3]
Editor's Note: See 35 P.S. § 750.1 et seq.
L. 
The plan should be accompanied by color photographs and a color video tape (VHS format) of the property showing significant features, indicating proposed street locations, identifying existing structures and streets, and showing all property boundaries and a continuous view of the area within 500 feet (152.4 meters) of the site boundaries. The plan and video should be indexed to facilitate identification of physical features and proposed improvements.
The final plan shall show or be accompanied by the following information:
A. 
Drafting standards per preliminary plan requirements.
B. 
General information per preliminary plan requirements and, in addition, must include datum to which contour elevations refer. Where reasonably practicable, data shall refer to known, established elevations.
C. 
Existing features per preliminary plan requirements.
D. 
Proposed layout, showing:
(1) 
Proposed standards, as applicable:
(a) 
Density;
(b) 
Open space;
(c) 
Dwelling unit mix;
(d) 
Type and size of units (square footage/square meters of footprints);
(e) 
Size of nonresidential buildings (include floor area and gross leasable area);
(f) 
Total number of off-street parking spaces and method of calculation.
(2) 
The layout and names of streets and driveways, including widths of cartways and rights-of-way and recommended improvements (see Township for recommended street list).
(3) 
The layout and approximate dimensions, areas, and uses of lots; building setback lines, and rear and side yard lines. The error of closure of all lot lines and easements shall not be greater than one part in 2,500.
(4) 
The arrangement and use of buildings, pads, structures, and parking areas in nonresidential developments with all necessary dimensions and number of parking spaces. Elevations and perspective sketches of proposed buildings are encouraged.
(5) 
All open space shall be so identified, and its proposed use and level of maintenance specified. The method of administration and maintenance of the open space shall be detailed.
(6) 
The layout of recreational or community facilities, sidewalks and pedestrian paths.
(7) 
Where the preliminary plan is phased and covers only a part of the applicant's entire holding, a sketch shall be submitted of the prospective street layout for the remainder.
E. 
Cross sections and center-line profiles shall be provided for each proposed street shown on the preliminary plan. These plans may be submitted as separate sheets.
F. 
Sewer and water plan (per preliminary plan requirements).
G. 
Landscaping and grading plan, showing:
(1) 
Existing grades with proposed grades shown as required by the Township Engineer;
(2) 
Areas for proposed topsoil stockpiling;
(3) 
Location of all proposed drainage and stormwater facilities;
(4) 
Existing vegetation to be removed;
(5) 
Existing vegetation to be preserved and vegetation protection measures;
(6) 
The location of all proposed plant material;
(7) 
The identification, quantity, botanical name, common name, type of container and any additional remarks of all proposed plant material species list of alternate species when applicable;
(8) 
Detail of all planting, staking, guying, wrapping, pruning specifications;
(9) 
Buffer areas.
H. 
Improvement construction plan (drainage and construction):
(1) 
The improvement construction plan shall be at any of the following scales:
Horizontal
Vertical
20 feet/inch (4.57 meters/centimeter)
2 feet/inch (0.6096 meters/centimeter)
40 feet/inch (12.192 meters/centimeter)
4 feet/inch (1.2192 meters/centimeter)
50 feet/inch (15.24 meters/centimeter)
5 feet/inch (1.524 meters/centimeter)
(2) 
Horizontal plan (streets). The horizontal plan shall show details of the horizontal layout including:
(a) 
Center line with bearings, distances, curve data and stations corresponding to the profile;
(b) 
Right-of-way and curb lines with radii at intersections;
(c) 
Beginning and end (physical location) of proposed construction;
(d) 
Tie-ins by courses and distances to intersection of all public roads, with their names and widths;
(e) 
Location of all proposed monuments with reference to them;
(f) 
Property line and ownership of abutting properties;
(g) 
Location and size of all drainage structures, stormwater detention `facilities, sidewalks, public utilities, lighting standards, and street name signs;
(h) 
Location and size of line with stations corresponding to the profile;
(i) 
Location of manholes or inlets with grade between and elevation of flow line and top of each manhole or inlet;
(j) 
Property lines and ownership, with details of easements where required;
(k) 
Beginning and end of proposed construction;
(l) 
Location of laterals;
(m) 
Location of all other drainage facilities and public utilities in the vicinity of storm and/or sanitary sewer lines;
(n) 
Profile of existing ground surface along center line of street;
(o) 
Proposed center-line grade with percent on tangents and elevations at fifty-foot (15.24 meters) intervals, grade intersection and either end of curb radii;
(p) 
Vertical curve data including length, elevations and minimum sight distance as required by the Township Engineer;
(q) 
Right-of-way width and location and width paving;
(r) 
Type, thickness, and crown of paving;
(s) 
Type and size of curb;
(t) 
Grading of sidewalk area;
(u) 
Location, width, type and thickness of sidewalks;
(v) 
Typical location of sewers and utilities with sizes;
(w) 
Profile of existing ground surface with elevations at top of manholes or inlets;
(x) 
Profile of storm drain or sewer showing type and size of pipe, grade, cradles, manhole, and inlet locations;
(y) 
Stormwater management:
[1] 
Description of an ownership and maintenance program, in a recordable form, that clearly sets forth the ownership and maintenance responsibility for all temporary and permanent stormwater management facilities, including the following:
[a] 
Description of the method and extent of the maintenance requirements.
[b] 
When maintained by a private entity, identification of a responsible individual, corporation, association or other entity for ownership and maintenance. Deed covenants and restrictions must be submitted to provide for maintenance by this entity.
[c] 
When maintained by a private entity, copy of the legally binding document which provides that Township shall have the right to:
[d] 
Inspect the facilities at any time;
[e] 
Require the private entity to take corrective measures and assign the private entity reasonable time periods for any necessary action;
[f] 
Authorize maintenance to be done and lien the cost of the work against the properties of the private entity responsible for maintenance.
[g] 
Where the stormwater management plan proposes that Township own or maintain the facilities, a description of the methods, procedures, and the extent to which any facilities shall be turned over to the Township.
[2] 
Financial security for the completion of stormwater management facilities as set forth in this chapter.
[3] 
Maintenance guarantee, as set forth in this chapter.
[4] 
When a stormwater management plan is submitted in sections, a generalized stormwater management plan for the entire project site shall be submitted in addition to the detailed stormwater management plan for the proposed section. This generalized plan shall demonstrate how the stormwater of the proposed section will relate to the entire development. If temporary facilities are required for construction of a section, such facilities shall be included in the submitted stormwater management plan.
I. 
Acknowledgments.
(1) 
All offers of dedication and covenants governing the reservation and maintenance of undedicated open space, bearing certificate of approval of Township Solicitor.
(2) 
Such private deed restrictions, including building setback lines, as may be imposed upon the property as a condition to sale, together with a statement of any restrictions previously imposed which may affect the title to the land being subdivided.
(3) 
A written improvements agreement, pursuant to this chapter.
(4) 
Surveyor's certification shall appear on the plan as follows:
"I hereby certify that the plan shown and described hereon, as well as all other drawings which are a part of this plan set, are true and correct to the accuracy required by the Towamencin Township Subdivision and Land Development Ordinance and were prepared by me or under my direction. The existing perimeter monuments shown hereon have been located as part of the survey and all other proposed perimeter monuments shall be set.
Date
"
Surveyor
(5) 
Wetlands certification shall appear on the plan as follows:
"I do hereby certify that the delineation of the wetlands shown on this plan is in accordance with the findings of my field investigation and that I have determined these limits based upon the Corps of Engineer guidelines.
Date
"
Surveyor
(6) 
Note on plan for dedication of rights-of-way or easements:
(a) 
Typical note for right-of-way:
"Fifty-foot (15.24 meters) right-of-way for public thoroughfare is hereby offered for dedication to Towamencin Township."
(b) 
Example plan note for easements:
"Stormwater easement for the benefit of Towamencin Township is hereby offered for dedication to Towamencin Township or its assigns."
(7) 
Permits. The developer shall obtain all necessary permits and approvals from all governmental agencies which have jurisdiction over this project. This would include such agencies as follows: the Pennsylvania Department of Transportation, Pennsylvania Department of Environmental Resources, United States Corps of Engineers, etc.
(8) 
The plan shall list all waivers granted by the Board of Supervisors.
(9) 
The plan shall indicate the Montgomery County Planning Commission review number.
A. 
Drafting standards.
(1) 
The plan shall be drawn at a scale of one inch equals 20 feet (2.540 centimeters equals 6.096 meters), one inch equals 30 feet (2.540 centimeters equals 9.144 meters), one inch equals 40 feet (2.540 centimeters equals 12.192 meters), one inch equals 50 feet (2.540 centimeters equals 15.24 meters), or one inch equals 100 feet (2.540 centimeters equals 30.48 meters).
(2) 
Dimensions shall be in feet (meters) and decimal parts thereof, and bearings in degrees, minutes and seconds.
(3) 
The boundary line of the subdivision shall be shown as a solid heavy line. The error of closure of all lot lines and easements shall not be greater than one part in 2,500.
(4) 
Plans shall be on sheets either 15 inches by 18 inches (38.1 centimeters by 45.72 centimeters), 18 inches by 30 inches (45.72 centimeters by 76.2 centimeters), or 24 inches by 36 inches (60.96 centimeters by 91.44 centimeters), or such size as is specifically approved by the Township Engineer, and all lettering shall be so drawn as to be legible if the plans should be reduced to half size.
B. 
General information to be shown:
(1) 
Name of subdivision or land development;
(2) 
Tax parcel number (Montgomery County Tax Map);
(3) 
Name and address of the owner/applicant/developer;
(4) 
Name and address of the registered engineer, surveyor, landscape architect, or architect responsible for the plan;
(5) 
Type of water supply and sewage disposal facilities proposed;
(6) 
Zoning requirements, including:
(a) 
Applicable district;
(b) 
Lot size and yard requirements;
(c) 
Any variances or special exceptions granted;
(7) 
Location map showing relation of site to adjoining properties and streets;
(8) 
North point;
(9) 
Written and graphic scales (including scale of location map);
(10) 
Total acreage of the site, area and dimensions for each lot;
(11) 
Site boundaries;
(12) 
Boundaries of all adjoining properties (with names of landowners in the case of unplatted land);
(13) 
Existing streets on and adjacent to the site with future rights-of-way;
(14) 
Existing buildings (and their uses), driveways, sewer lines, storm drains, culverts, bridges, utility easements, quarries, railroads, and other significant man-made features within 500 feet (152.4 meters) of and within the site (this includes properties across roadways);
(15) 
Proposed lot layout;
(16) 
Building setback lines.
C. 
Natural features to be shown:
(1) 
Soil types within site, based on maps contained in the Soil Survey of Montgomery County, Pennsylvania, U.S. Department of Agriculture, Soil Conservation Service, 1967.
(2) 
Contours based upon U.S. Geological Survey datum; provided, that if on-site sewage disposal is proposed, contours shall be provided at vertical intervals of two feet (0.6096 meters) for land with average natural slope of 5% or less and vertical intervals of five feet (1.74 meters) for more steeply sloping land. Show datum to which contour elevations refer. Where reasonably practicable, data shall refer to known, established elevations.
(3) 
The location and area of all floodplains, floodplain soils, forests, lakes, ponds, watercourses, and wetlands.
D. 
Acknowledgment (per final plan requirements).
[Amended 12-17-2003 by Ord. No. 03-09]
The record plan submission shall consist of three copies of a clear and legible blue or black line print on white opaque linen or clear Mylar, and five copies on paper print. The record plan shall be an exact copy of the approved final plan on a sheet of the size required for final plans. An electronic copy of the record plan shall also be submitted in a format compatible to a GIS system, or as otherwise approved by the Township.
A. 
Seals as follows:
(1) 
The impressed seal and signature of the licensed engineer, architect, landscape architect, or surveyor who prepared the plan;
(2) 
The impressed corporation seal, if the subdivider is a corporation;
(3) 
The impressed seal of a notary public or other qualified officer acknowledging owner's statement of intent.
B. 
Acknowledgments as follows:
(1) 
A statement to the effect that the applicant is the owner of the land proposed to be subdivided and that the subdivision shown on the final plan is made with his or their free consent and that it is desired to record the same;
(2) 
An acknowledgment of said statement before an officer authorized to take acknowledgments;
(3) 
All other applicable acknowledgments per final plan requirements.
C. 
The following signatures shall be placed directly on the plan in ink:
(1) 
The signatures of the owner of the land; if the owner of the land is a corporation, the signatures of the president and secretary of the corporation shall appear;
(2) 
The signature of the notary public or other qualified officer, acknowledging the owner's statement of intent;
(3) 
The signature of the licensed engineer or surveyor who prepared the plan;
(4) 
The signatures of the Chairman and the Secretary of the Board of Supervisors.
D. 
The seal of the Montgomery County Planning Commission shall be placed directly on the plan prior to recording of the plan with the Montgomery County Recorder of Deeds. Provide a three-and-one-half-inch (8.89 centimeters) wide by two-inch (5.08 centimeters) tall block for county review stamp.
E. 
All plans shall require a certification as to the accuracy of the plats, and shall be prepared in accordance with the Act of May 23, 1945, known as the "Professional Engineers Registration Law."[1]
[1]
Editor's Note: See 63 P.S. § 148 et seq.
F. 
Said plats can propose, at the discretion of the Board of Supervisors, the phasing of said project of land development. In the event the Board of Supervisors permits a phased development, the arrangement of the surety and the phasing, in terms of number of units, shall be reviewed by the Board of Supervisors and approved at its discretion.