[Ord. 621, 2/22/1993, § 601]
The following provisions shall be considered the overriding performance standards against which all proposed stormwater control measures shall be evaluated:
A. 
Any landowner and any person engaged in the alteration or development of land which may affect stormwater runoff characteristics shall implement such measures as are reasonably necessary to prevent injury to health, safety or other property. Such measures shall include actions as are required:
(1) 
To assure that the maximum rate of stormwater runoff is no greater after development than prior to development activities.
(2) 
To manage the quantity, velocity and direction of resulting stormwater runoff in a manner which otherwise adequately protects health and property from possible injury.
B. 
The stormwater management plan for the development site must consider all the stormwater runoff flowing over the site.
C. 
Where existing storm sewers are reasonably accessible, proposed developments may be required to connect with the storm sewer system unless insufficient capacity or other reasons can be demonstrated to prevent the connection.
D. 
No discharge of toxic materials into any stormwater management system shall be permitted.
E. 
For any development that is to be constructed in stages, the applicant must demonstrate that stormwater facilities will be installed to manage stormwater runoff safely during each stage of development.
[Ord. 621, 2/22/1993, § 602]
The stormwater performance standards contained in this section are intended to be used as a guide in applying and interpreting all specific ordinance requirements. Unless otherwise specified, the following provisions shall apply.
[Ord. 621, 2/22/1993, § 603; as amended by Ord. 685, 5/11/1998]
1. 
Stormwater management facilities on all development sites shall control the peak stormwater discharge for the two-, ten-, twenty-five- and one-hundred-year design storms. The SCS 24 hour, Type II Distribution rainfall depths which shall be used for analyzing stormwater runoff with the TR-55 methodology are as follows:
Design Storm Return Period
24-Hour Rainfall Depth in Inches
2-year
2.6
10-year
3.9
25-year
4.5
100-year
5.2
2. 
The Rational Method shall be used for analyzing the stormwater runoff for small watersheds as specified in this Part. The rainfall intensities for the design storms are as specified:
A. 
(For additional information or data on other return periods, consult the "Rainfall Duration Frequency Tables for Pennsylvania," produced by PA DEP Office of Resource Management, Bureau of Dams and Waterways Management, Division of Stormwater Management, Harrisburg, February 1983, or in its most recent update.)
Design Storm Return Period
5-Minute Duration Rainfall in Hour
2
4.1
10
5.2
25
5.6
100
6.5
[Ord. 621, 2/22/1993, § 604]
1. 
Development Sites. For the purposes of computing peak discharges and runoff hydrographs from development sites and drainage areas larger than three acres, calculations shall be performed using the methodologies presented in SCS Publication, Technical Release 55 (TR 55) or an approved method for analyzing these types of watersheds. For development sites less than three acres, the Rational Method may be utilized using the design storm criteria shown in § 26-153 or an approved method for analyzing these types of watersheds. The Borough Engineer may approve the use of simulation computer programs for the stormwater analysis and design. The appropriate calculations and worksheets or acceptable computer printouts as approved by the Borough Engineer must be submitted regardless of the methodology used for these calculations. An approved simulation of the modified puls (Hastead's Method Pond 2, HEC 1) methodology shall be used in analysis for routing the design storm hydrographs through the detention/retention facility. The proper stage/storage charts and outflow hydrographs must be submitted for approval. All graphs and/or charts used must be submitted.
2. 
Stormwater Collection/Conveyance Facilities. For the purpose of designing storm sewers, open swales and other stormwater runoff collection and conveyance facilities, the Rational Method shall be applied. Rainfall intensities for a twenty-five year design storm with a minimum five minute duration must be used and should be obtained from the Pennsylvania Department of Transportation's Part II Manual, Chapter 10, Rainfall Intensity Charts. However, if the exiting Tc is larger than five minutes, it should be used as the rainfall duration.
3. 
Detention/Retention Pond. The inflow hydrograph shall be routed through the detention/retention facility by using the modified puls method. When using the rational method for developing the inflow hydrograph, the detention time must be a minimum of 30 minutes for a five minute storm intensity as specified previously. The routing charts and outflow hydrographs for each design storm must be submitted.
[Ord. 621, 2/22/1993, § 605; as amended by Ord. 685, 5/11/1998]
1. 
General Design Guidelines.
A. 
Applicants may select runoff control techniques, or combinations of techniques, which are most suitable to the level of stormwater runoff control required, the type of development, and the natural features of the site. Cost of maintenance shall be one of the considerations in the designs selected. All controls are subject to the approval of the Borough Engineer. The Engineer may request specific information on design and/or operating features of the proposed stormwater controls in order to determine their suitability and adequacy in terms of the standards of this Part.
B. 
In selecting and designing stormwater management systems and controls, applicants may be guided by the following references:
(1) 
"Urban Hydrology for Small Watersheds," Technical Release No. 55, USDA, Soil Conservation Service, June 1986 (or most recent edition).
(2) 
"Part II Design Manual," the Pennsylvania Department of Transportation, 1990 edition (or most recent update).
(3) 
"HEC 1 and HEC 2," U.S. Army Corps of Engineers, most recent edition.
(4) 
"Soil Erosion and Sedimentation Control Manual," Pennsylvania Department of Environmental Protection, March 1982.
(5) 
"Standards and Specifications for Soil Erosion and Sediment Control," Maryland Water Resources Administration, 1983.
(6) 
"Urban Stormwater Management," Special Report No. 49, American Public Works Administration, 1981.
(7) 
"Water Resources Protection Measures in Land Development - A Handbook," University of Delaware Water Resources Center, April 1974.
(8) 
"Design and Construction of Sanitary and Storm Sewers," WPCF Manual of Practice No. 9, Water Pollution Control Federation, 1970.
C. 
The applicant should consider the effect on the proposed stormwater management techniques of any special soil conditions or geological hazards which may exist on the development site. In the event such conditions are identified on the development site, the Borough may require in-depth studies by a competent geotechnical engineer.
2. 
Criteria for Stormwater Detention Facilities.
A. 
If detention facility(ies) are utilized for the development site, the facility(ies) shall be designed so that the post development peak runoff rates from the site are controlled to those rates calculated for the predevelopment peak runoff rate for the aforementioned design storms as well.
B. 
All detention facility(ies) shall be designed and equipped to safely pass the post-development one-hundred-year storm runoff flows without damaging (i.e., impairing the continued function of) the facilities. The facility(ies) must have an emergency outlet which is able to discharge the post development one-hundred-year peak flow.
C. 
Shared storage facilities, which provide detention of runoff for more than one development site, may be considered within a single subarea. Such facilities shall meet the design criteria contained in this section. In addition, runoff from the development sites involved shall be conveyed to the facility in a manner so as to avoid adverse impacts, such as flooding or erosion, to channels and properties located between the development site and the shared storage facilities.
D. 
Where detention facilities will be utilized, multiple-use facilities, such as lakes, ballfields or similar recreational uses, shall be considered first as storage facilities wherever feasible, subject to the approval of the Borough.
E. 
Other considerations which should be incorporated into the design of the detention facilities include:
(1) 
Inflow and outflow structures should be designed and installed to prevent erosion and bottoms of impoundment type structures must be protected from soil erosion. All outlet velocities must be calculated and submitted. If riprap is used, the sizing calculations must be submitted.
(2) 
Control and removal of debris both in the storage structure and in all inlet or outlet devices must be a design consideration.
(3) 
Inflow and outflow structures, pumping stations, and other structures should be protected and designed to minimize safety hazards.
(4) 
The interior slope of a detention/retention pond shall be 3:1. Restriction of access (fences, walls, etc.) may be necessary depending on location of the facility.
(5) 
Detention/retention ponds with a water depth greater than 10 feet shall require a supporting report from a geotechnical engineer and shall be constructed under the supervision of the geotechnical engineer.
(6) 
Landscaping must be provided for the facility which harmonizes with the surrounding area.
(7) 
Facility must be accessible for the maintenance purposes, considering the frequency and type of equipment that will be required. A maintenance schedule must be submitted and approved by the Borough.
(8) 
Details of the facility must be shown on the plan.
(9) 
A riprap channel with underdrain for low flows must be sized properly and provided within the pond.
(10) 
The minimum required freeboard for a detention/retention pond is one foot and for a detention tank or sump is 1/2 of a foot above the one-hundred year water surface elevation.
(11) 
If an underground facility (i.e., tank, sump) is proposed, a cleanout manhole with steps must be provided.
(12) 
An emergency spillway must be provided for all detention/retention facilities. For basins, the spillway must be sized to pass the entire one-hundred-year post development storm with one foot of freeboard. Underground systems must have an emergency outlet set above the 0.5 foot of required freeboard capable of passing the one-hundred-year post-development storm.
(13) 
Outlet control structures shall be constructed of reinforced concrete (cast-in-place, precast, or block) and provided with debris grates approved by the Borough Engineer.
(14) 
All impoundment areas shall be adequately underdrained to prevent long term ponding of water.
(15) 
All detention facilities shall be provided with an access road (with a legal easement) for maintenance purposes. Such roads shall be a minimum of 10 feet wide, have a maximum grade of 15%, and be of a stone or impervious surface. Control and removal of debris both in the storage facility and in all inlet or outlet devices shall be a design consideration. Inflow and outflow structures, pumping stations and other structures shall be protected and designed to minimize safety hazards. Landscaping shall be provided for the facility which harmonizes with the surrounding area.
(16) 
An as-built drawing shall be required for each stormwater detention facility constructed. The drawing shall represent an engineering certification of the volume of the facility and its depth vs. storage relationship. This relationship shall be shown on the drawing in table form. The drawing shall be stamped by a registered professional engineer and submitted to the Borough within 60 days of the completion of the facility. No facility will be accepted until this requirement has been fulfilled.
3. 
Criteria for Collection/Conveyance Facilities.
A. 
All stormwater runoff collection or conveyance facilities, whether storm sewer or other open or closed channels, shall be designed in accordance with the following basic standards:
(1) 
All sites shall be graded to provide drainage away from and around the structure in order to prevent any potential flooding damage.
(2) 
Lots located on the high side of streets shall extend roof and French drains to the storm sewer in the street or to the gutter line of the street if no sewer exists. Lowside lots shall extend roof and French drains to a stormwater collection/conveyance system or natural watercourse in accordance with the approved stormwater management plan for the development site.
(3) 
Collection/conveyance facilities should not be installed parallel and close to the top or bottom of a major embankment to avoid the possibility of causing the embankment to fail.
(4) 
All collection/conveyance facilities shall be designed to convey the twenty-five-year storm peak flow rate from the contributing drainage area and to carry it to the nearest suitable outlet or natural watercourse. Off-site conveyance shall be provided with easements to an existing storm sewer system or natural watercourse.
(5) 
Where drainage swales or open channels are used, they shall be suitably lined to prevent erosion and designed to avoid excessive velocities. Calculations must be presented for the velocities and it must be shown that the proposed surface for the swale is adequate.
(6) 
Wherever storm sewers are proposed to be utilized, they must comply with the following criteria:
(a) 
Designed to traverse under seeded and planted areas. If constructed within 10 feet of the road paving, walks or other surfaced areas, the drains shall have a narrow trench, and maximum compaction of backfill to prevent settlement of the superimposed surface or development.
(b) 
Installed after excavating and filling in the area to be traversed is completed, unless the drain is installed in the original ground with a minimum of three feet cover and/or adequate protection during the fill construction.
(c) 
Designed: (1) with cradle when traversing fill areas of indeterminate stability, (2) designed with anchors when gradient exceeds 20%, and (3) designed with encasement or special backfill requirements when traversing under a paved area.
(d) 
Designed to handle adequately the anticipated stormwater flow and to be constructed and maintained economically. The minimum pipe size shall be 15 inches in diameter.
(e) 
Drain pipe, trenching, bedding and backfilling requirements shall conform to the requirements of the Borough and/or applicable requirements of the Pennsylvania Department of Highways Specifications, current Form 408.
(f) 
All corrugated metal pipe shall be polymer coated, with bonding and paved inverts where prone to erode. Pipe under a Borough cartway shall be reinforced concrete pipe with a minimum diameter of 15 inches.
(g) 
Storm inlets and structures shall be designed to be adequate, safe, self-cleaning and unobtrusive and shall be consistent with the standards of the Borough.
(h) 
Appropriate grates shall be designed for all catch basins, stormwater inlets and other entrance appurtenances in accordance with Borough specifications.
(i) 
Manholes shall be designed so that the top shall be at finished grade and sloped to conform to slope of finished grade. Top castings of structures located in roads or parking areas shall be machined or installed to preclude "rattling."
(j) 
Where a proposed storm sewer connects with an existing storm sewer system, the applicant shall demonstrate that sufficient capacity exists in the downstream system to handle the additional stormwater flow.
(k) 
Storm sewer outfalls shall be equipped with energy dissipators to prevent erosion and conform with applicable requirements of the PA DEP for stream encroachments (Chapter 105 of the Department's rules and regulations).
[Ord. 621, 2/22/1993, § 606]
Proposed erosion/sedimentation measures should be submitted with the stormwater management plan. These plans shall follow the guidelines set forth in the Borough's Erosion and Sediment Pollution Control Ordinance [Chapter 9].